Half Year Accounts
Released
Released
Announcement PDF
Greenvale Energy Limited ABN 54000743555
INTERIM FINANCIAL REPORT
HALF-YEAR ENDED
31 DECEMBER 2025
Greenvale Energy Limited Half-Year Ended, 31/12/2025 Page | 2
ASX:GRV
Table of Contents
Corporate Directory 3
Directors’ Report And Review Of Operations 4
Auditor’s Independence Declaration 9
Condensed Consolidated Statement Of Profit Or Loss And Other Comprehensive Income 11
Condensed Consolidated Statement Of Financial Position 12
Condensed Consolidated Statement Of Changes In Equity 13
Condensed Consolidated Statement Of Cash Flows 14
Notes To The Consolidated Financial Statements 15
Directors’ Declaration 23
Independent Auditor’s Report To The Members Of Greenvale Energy Limited 24
Greenvale Energy Limited Half-Year Ended, 31/12/2025 Page | 3
ASX:GRV
CORPORATE DIRECTORY
DIRECTORS Neil Biddle (Executive Chairperson)
Elias (Leo) Khouri (Non-Executive Director)
John Barr (Non-Executive Director)
COMPANY SECRETARY Peter Harding-Smith
REGISTERED OFFICE Suite 5, Level 12
10 Market Street
Brisbane QLD 4000
Phone: +61 (07) 3212 6299
SHARE REGISTRY MUFG
Level 12, 680 George Street
Sydney NSW 2000
Tel: +61 2 82807111
AUDITORS RSM Australia Partners
Level 7, 1 Martin Place
Sydney NSW 2000
STOCK EXCHANGE Australian Securities Exchange
Exchange Centre
20 Bridge Street
Sydney NSW 2000
ASX CODE GRV
WEBSITE www.greenvale.com.au
Greenvale Energy Limited Half-Year Ended, 31/12/2025 Page | 4
ASX:GRV
DIRECTORS’ REPORT AND REVIEW OF OPERATIONS
The Directors present this report together with the financial statements of Greenvale Energy
Limited (“Greenvale” or “the Company”) and its consolidated entities (the “Group”) for the half
year ended 31 December 2025 (“Half Year-2025”) and the auditors’ review report thereon.
Directors
The names of the Company’s directors in office during the Half-Year 2025 and until the date of this
report are set out below. Directors were in office for the entire period, unless otherwise stated:
• Neil Biddle (Chairperson, Non-Executive Chairperson)
• Elias (Leo) Khouri (Non-Executive Director)
• John Barr (Non-Executive Director)
Principal Activities
The Group’s principal activity during the Half-Year 2025 was the exploration and development of
mineral resources in Queensland and North Territory.
The Company successfully completed Test Project 5 of the Alpha Torbanite Project which
improved the viscosity of the final bitumen product and the potential to deliver a premium-grade
C170 product.
During the period, the Company accumulated a portfolio of uranium assets in the Northern
Territory and subsequent to the period end, Greenvale acquired the Oasis Uranium project, an
advanced uranium asset in Queensland.
With the exception of the above, there were no significant changes in the nature of the Group's
principal activities during the Half-Year 2025.
Result and Review of Operations
The loss for the Group after income tax for the six months to December 2025 amounted to
$818,408 (December 2024: loss of $344,121) and the net assets of the Group were $11,059,835
(June 2025: $9,893,877).
No dividends were declared or paid during the Half-Year 2025 (2024: $nil).
Events Subsequent to Reporting Date
Events that have occurred since the end of the period include:
• At a General Meeting held on 19 January 2026, shareholders approved the issue of an
unlisted options for every two shares subscribed for in the Placement and Security
Purchaser Plan, resulting in the issue of 21,556,122 unlisted options.
• On 24 February 2026, 4,500,000 vested performance rights were exercised and 4,500,000
ordinary shares were issued.
• On 26 February 2026, EL34157 was granted for a 6 year term at the Douglas River Uranium
Project, Northern Territory.
Other than the above, there has not been any other matter or circumstance occurring
subsequent to the end of the Half-Year 2025 that has significantly affected or may significantly
affect the operations or affairs of the Group in future financial years.
Greenvale Energy Limited Half-Year Ended, 31/12/2025 Page | 5
ASX:GRV
CORPORATE
Capital raising
On 28 July 2025, the Company issued 750,000 shares when an employee converted vested
performance rights.
On 12 November 2025, the Company issued 23,659,091 shares as part of a placement at $0.044
per share, raising $1.04 million. At the same time the Company launched a Security Purchase
Plan (SPP) that resulted in the issue of 19,453,153 shares at $0.044 per share on the 4 December
2025, raising $855,939.
The placement and SPP also had an attaching option for every two shares subscribed, with an
exercise price of $0.07 and expiry of 30 November 2026. These options were issued on 21 January
2026, after receiving shareholder approval at a General Meeting.
DIVIDENDS
There were no dividends paid, recommended or declared during the current or previous financial half-
year.
OPERATIONS
Oasis Uranium Project
The Oasis Uranium Project (EPM 27565) is located in North Queensland, approximately 250–
300km west of Townsville, covers 90km² and is principally within the Lynd Station pastoral lease.
During the Period, Greenvale completed its maiden uranium-focussed field season at Oasis,
comprising drilling, downhole geophysics, regional prospectivity studies, ground-based
geophysics, trenching and rehabilitation works.
Greenvale commenced its maiden drill program at Oasis in late July 2025. The program was
designed to:
• Confirm historical drilling results;
• Test extensions of mineralisation along strike; and
• Test mineralisation at depth.
The program comprised 12 drill holes for a total of 1,804.2 metres, using RC pre-collars with
diamond core tails, drilling concluded in early September 2025.
Downhole spectral gamma logging and acoustic televiewer surveys were undertaken halfway
through the drilling program and again on completion of the program. These surveys allowed
immediate characterisation of uranium mineralisation and allowed for initial interpretation of
structural features. Spectral gamma logging confirmed multiple zones of high-grade uranium
mineralisation and demonstrated strong correlation with laboratory chemical assays.
Subsequent chemical assays confirmed significant high-grade uranium intercepts, including:
• 13m @ 519ppm U₃O₈ from 40m (25GRV001), including 2m @ 1,273ppm U₃O₈;
• 8m @ 2,125ppm U₃O₈ from 84m (25GRV002), including 5m @ 3,263ppm U₃O₈ and 1m @
6,929.57ppm U₃O₈;
Greenvale Energy Limited Half-Year Ended, 31/12/2025 Page | 6
ASX:GRV
• 5.5m @ 722ppm U₃O₈ from 279m (25GRV003), confirming deeper mineralisation
approximately 50m below historical drilling;
• 3.75m @ 1,001ppm U₃O₈ from 76.2m (25GRV004), including 1m @ 2,424ppm U₃O₈; and
• 8.5m @ 566ppm U₃O₈ from 109.5m (25GRV008), including 3m @ 1,276ppm U₃O₈.
Interpretation of the results confirmed that high-grade uranium mineralisation is structurally
controlled and hosted within a chlorite-biotite schist unit forming the contact between granite
and granitic gneiss, within a north–south striking shear zone dipping 60–70° west. Drilling also
demonstrated continuity along strike to both north and south, and at depth, with mineralisation
remaining open.
In parallel with drilling, Greenvale advanced regional exploration across the broader exploration
tenure of EPM 27565. A prospectivity study incorporated historical airborne radiometrics,
reprocessed magnetics and Company acquired field data (rock-chip results). Nine uranium
anomalies previously identified from historical geophysics were ground-truthed, with 33 rock-
chip samples collected. Sixteen samples returned anomalous uranium values up to 187ppm U.
A close-spaced ground magnetic survey (42 line-kilometres on a 10m grid) was completed during
the Period, the high-resolution data revealed multiple cross-cutting N-S, NW-SE and NE-SW
faults at the Oasis deposit. These structures were interpreted to have influenced uranium
distribution. Sentinel-2 multispectral satellite data was also acquired and interpreted, gas
anomalies (helium, radon and hydrogen) and chlorite alteration signatures were identified and
shown to correlate with mapped structural features and high-grade drilling results.
Following completion of drilling, a trenching program was undertaken between during October
and November. Six trenches, totalling approximately 775 metres were excavated (1.2m wide,
1.6–2.5m deep, up to 150m long). The trenches were designed to test:
• Along-strike extensions of the main Oasis deposit;
• Lateral targets identified from the ground magnetic survey; and
• Coincident Sentinel-2 anomalies.
Preliminary hand-held scintillometer readings exceeded 2,000 counts per second in areas of
mapped megacrystic granite and biotite-chlorite schists supporting the interpretation of
additional mineralised structures. Geological and structural data collected from trench walls
further refined the structural framework and supported interpretation of a potential second
mineralised structure. Samples from trenches were submitted for chemical assay with results
pending at the end of the Period.
By mid-November 2025, all drill pads, sumps and trenches were rehabilitated, with all personnel
and equipment demobilised from site, final assays for drilling were released in December. The
integration of drilling, trenching, magnetics, geochemistry and satellite data contributed to a
significant expansion of the Oasis geological model.
Greenvale Energy Limited Half-Year Ended, 31/12/2025 Page | 7
ASX:GRV
Douglas River Uranium Project
The Douglas River Uranium Project is located approximately 200km south of Darwin and is positioned
within the world-class mineral field of the Pine Creek Orogen, known to host significant Uranium
Resources and previously operating uranium mines.
During the Period, Greenvale executed an amendment to its Douglas River Acquisition Agreement,
securing two additional Exploration Licence Applications (ELA34114 and ELA34157) contiguous with
existing tenure. This expanded the project area by approximately 70% to a total of ~1,216km². The
enlarged landholding comprises EL33670 (granted) and ELAs 33900, 34114 and 34157.
Field activities were not able to be conducted during the Period, the Company focussed on progressing
land access matters.
Elkedra-Henbury Uranium Project
The Elkedra-Henbury Uranium Project comprises two separate exploration claims, with Elkedra
approximately 300km north of Alice Springs and situated in the Georgina Basin, and Henbury
approximately 100km south of Alice Springs and situated in the Amadeus Basin. During the Period,
Greenvale undertook desk-based target development work incorporating:
• Airborne magnetics and radiometrics data analysis;
• Sentinel-2 multispectral imagery and data;
• Regional gravity and structural datasets; and
• NT Government geological data..
This integrated prospectivity analysis identified three priority target areas (Henbury West, Central and
East) comprising 21 discrete targets for ground truthing. Greenvale completed its maiden ground-
based exploration program at Henbury with field crews mobilised via Alice Springs in late August and
running through to early September. Field activities included:
• Ground-based scintillometer surveys (radiometrics);
• Portable XRF surveys;
• Geological reconnaissance and mapping; and
• Ground-truthing of coincident structural and geophysical anomalies.
Coincident features of interest included intersecting fault and fold structures, U₂/Th anomalies and
multispectral gas signatures (including radon-related anomalies) associated with favourable
stratigraphic units. The program was designed as systematic, early-stage target validation, with data
analysis and geochemical interpretation supporting the need for a future follow up field program
focussed on sampling.
Alpha Torbanite Project
The Alpha Torbanite Project is located ~50 km south of Alpha in central Queensland, it is one of
Australia’s only significant torbanite deposits. The project hosts a JORC Code 2012 compliant
Inferred Mineral Resource Estimate of ~28 million tonnes of torbanite and cannelite. Alpha is
positioned to deliver a domestic source of bituminous products that are currently almost entirely
imported into Australia — a market with >870,000 km of sealed roads and annual bitumen
consumption in excess of 1 Mt. The unique geology and high hydrocarbon content makes Alpha
a compelling opportunity to become Australia’s only end-to-end producer of sustainable
bitumen products.
Greenvale Energy Limited Half-Year Ended, 31/12/2025 Page | 8
ASX:GRV
Principle effort during the Period centred on Test Program 7 (TP7), which is aimed at scaling
laboratory process parameters verified in the previously completed TP6 and producing a bulk
bitumen sample for independent certification. In December, Greenvale announced successful
completion of the first two milestones of TP7, being replication of optimal TP6 process controls,
and successful scale-up from a 100ml pressure vessel (TP6) to a 4-litre autoclave (TP7),
representing a 40-times volumetric increase.
Key operating parameters include:
• Controlled temperature ramp to 400°C at ~10°C/minute;
• One-hour hold at peak temperature;
• Peak reaction pressures of ~29 MPa;
• Oxygen-free environment via gas purge and hydrogen pressurisation; and
• Zinc identified as optimal catalyst for conversion to asphaltene-rich product.
Specialist induction heating, cooling and control systems were designed, procured and
commissioned to enable scale-up. The subsequent phase of TP7 (bulk sample production)
commenced in December 2025 and continued into the new calendar year.
Millungera Basin Geothermal Project
During the Period Greenvale was granted geothermal exploration permits EPG 2023 (Julia Creek), EPG
2024 (Lara Downs) and EPG 2025 (Ouchy), each with five-year terms – expiring in 2030. Furthermore
Greenvale executed a Farm-in Agreement with SRL Hot Rocks Pty Ltd, a wholly owned subsidiary of
Sunrise Energy Metals (ASX: SRL), to advance the Millungera Basin Geothermal Project. Under the
Farm-in Agreement, SRL Hot Rocks is to sole-fund $5 million in exploration and development
expenditure over two phases - Phase 1 requires $2M expenditure over three years; Phase 2 requires
$3M expenditure over two years. Upon completion, an 80/20 Joint Venture (SRL-Hot
Rocks/Greenvale) may be formed.
AUDITORS DECLARATION
The lead auditor’s independence declaration has been received under section 307C of the
Corporations Act 2001 and is included within this financial report on page 9.
This report is signed in accordance with a resolution of the Board of Directors.
Neil Biddle
Chairman
Dated this 13th day of March 2026
RSM Australia Partners is a member of the RSM network and trades as RSM. RSM is the trading name used by the
members of the RSM network. Each member of the RSM network is an independent accounting and consulting firm
which practices in its own right. The RSM network is not itself a separate legal entity in any jurisdiction.
RSM Australia Partners ABN 36 965 185 036
Liability limited by a scheme approved under Professional Standards Legislation
RSM Australia Partners
Level 7, 1 Martin Place
Sydney
NSW 2000
Australia
T +61 (02) 8226 4500
F +61 (02) 8226 4501
rsm.com.au
AUDITOR’S INDEPENDENCE DECLARATION
As lead auditor for the review of the financial report of Greenvale Energy Limited for the half year ended 31
December 2025, I declare that, to the best of my knowledge and belief, there have been no contraventions of:
(i) the auditor independence requirements of the Corporations Act 2001 in relation to the review; and
(ii) any applicable code of professional conduct in relation to the review.
RSM AUSTRALIA PARTNERS
Cameron Hume
Partner
Sydney, NSW
Dated: 13 March 2026
Page | 9
Greenvale Energy Limited Half-Year Ended, 31/12/2025 Page | 10
ASX:GRV
COMPETENT PERSONS STATEMENTS
The information in this report that relates to:
The information in this announcement, as it relates to exploration results, interpretations and
conclusions, is based on information reviewed by Mr Mark Biggs, who is an independent technical
adviser to Greenvale Energy Ltd and is a Member of the Australasian Institute of Mining and
Metallurgy (AusIMM, #10788). Mr Biggs is a Director of ROM Resources Consultant to the Company,
and has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration, and to the overseeing of activities being undertaken to qualify as a Competent Person
(as defined in the JORC 2012 edition of the “Australasian Code for Reporting of Mineral Resources and
Ore Reserves”. Mt Biggs consents to the inclusion of this information in the form and context in which
it appears.
The information in this announcement, as it relates to exploration results, interpretations and
conclusions, is based on information reviewed by Ms Asha Rao who is Technical Advisor to Greenvale
Energy Ltd and is a Member of both the Australasian Institute of Mining and Metallurgy (AusIMM,
#228188) and the Australian Institute of Geoscientists (AIG, #6925). Ms Rao is a Consultant to the
Company, and has sufficient experience that is relevant to the style of mineralisation and type of
deposit under consideration, and to the overseeing of activities being undertaken to qualify as a
Competent Person (as defined in the JORC 2012 edition of the “Australasian Code for Reporting of
Mineral Resources and Ore Reserves”. Ms Rao consents to the inclusion of this information in the form
and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the
information included in the Mineral Resource Estimate dated 13 November 2023 (previously 9 March
2022) as announced to the ASX on that date and which is available at www.greenvaleenergy.com.au
The Company confirms that in relation to the Alpha Torbanite Project Mineral Resource Estimate, all
material assumptions and technical parameters underpinning the estimate continue to apply and have
not materially changed when referring to its resource announcement made on 13 November 2023
(previously 9 March 2022).
Greenvale Energy Limited Half-Year Ended, 31/12/2025 Page | 11
ASX:GRV
CONDENSED CONSOLIDATED STATEMENT OF PROFIT OR LOSS
AND OTHER COMPREHENSIVE INCOME FOR THE HALF-YEAR
ENDED 31 DECEMBER 2025
Note Half-Year Ended
31 Dec 2025
$
Half-Year Ended
31 Dec 2024
$
Continuing operations
Interest income 19,189 9,155
Gain on disposal of investments - 153,000
Other income - 268,851
Total revenue 19,189 431,006
Administrative expenses (336,556) (267,770)
Amortisation and depreciation (3,407) (34,890)
Directors and employees (207,801) (126,880)
Consultancy and legal expenses (53,784) (117,966)
Compliance and regulatory fees - (41,324)
Exploration expenses (21,690) -
Impairment of exploration and evaluation - (175,345)
Gain on settlement of financial liability - 210,866
Loss on disposal of royalty rights - (127,586)
Loss on investment (9,655) -
Marketing expenses (72,323) (52,221)
Share-based payments expense 8 (132,381) (42,011)
Total expenses (837,597) (775,127)
Loss before income tax (818,408) (344,121)
Income tax expense/revenue - -
Loss for the period from continuing operations (818,408) (344,121)
Discontinued operations
Loss for the period from discontinued
operations
- -
Loss for the period attributable to the owners of
Greenvale Energy Limited
(818,408) (344,121)
Other comprehensive income
Loss on the revaluation of equity instruments
(at fair value) - -
Total comprehensive income/(loss) for the
period
(818,408) (344,121)
Earnings per share for loss from continuing operations attributable to the owners of Greenvale Energy Limited
Basic income/(loss) per share (cents (0.15) (0.07)
Diluted income/(loss) per share (cents) (0.15) (0.07)
The Statement of Profit or Loss and Other Comprehensive Income is to be read in conjunction with the attached notes
to the financial Statements.
Greenvale Energy Limited Half-Year Ended, 31/12/2025 Page | 12
ASX:GRV
CONDENSED CONSOLIDATED STATEMENT OF FINANCIAL
POSITION AS AT 31 DECEMBER 2025
Note As at
31 Dec 2025
$
As at
30m June 2025
$
Current Assets
Cash and cash equivalents 1,778,911 2,118,463
Trade and other receivables 3 553,563 154,880
Other assets 7,356 25,812
Total Current Assets 2,339,830 2,299,155
Non-Current Assets
Exploration and evaluation 4 8,947,183 7,794,216
Plant and equipment 17,829 21,236
Investments 5 36,207 45,862
Total Non-Current Assets 9,001,220 7,861,314
Total Assets 11,341,049 10,160,469
Current Liabilities
Trade and other payables 6 281,215 266,592
Total Current Liabilities 281,215 266,592
Total Liabilities 281,215 266,592
Net Assets 11,059,835 9,893,877
Equity
Issued capital 36,796,975 34,928,940
Reserves 7 256,650 1,704,484
Accumulated losses 8 (25,993,790) (26,739,546)
Total Equity 11,059,835 9,893,877
The Statement of Financial Position is to be read in conjunction with the attached notes to the financial statements.
Greenvale Energy Limited Half-Year Ended, 31/12/2025 Page | 13
ASX:GRV
CONDENSED CONSOLIDATED STATEMENT OF CHANGES IN
EQUITY FOR THE HALF-YEAR ENDED 31 DECEMBER 2025
Issued Capital
$
Reserves
$
Accumulated
Losses
$
Total
Equity
$
Balance at
1 July 2024 30,230,108 4,555,339 (26,508,830) 8,276,617
Loss after income tax for the
period
- - (344,121) (344,121)
Total comprehensive loss for
the period - - (344,121) (344,121)
Transactions with Owners in
their Capacity as Owners
Contributions of equity, net of
transaction costs 394,332 - - 394,332
Transfer of share option
reserve 1,884,500 (1,884,500)
Expired options - (3,396,361) 3,396,361 -
Disposal of Investments - 2,257,038 (2,257,038) -
Equity settled employee
payments expense - 42,011 - 42,011
Balance at
31 December 2024 32,508,940 1,573,527 (25,713,628) 8,368,839
Issued Capital
$
Reserves
$
Accumulated
Losses
$
Total
Equity
$
Balance at
1 July 2025 34,928,940
1,704,484 (26,739,546) 9,893,877
Loss after income tax for the
period
- - (818,408) (818,408)
Total comprehensive loss for
the period - - (818,408) (818,408)
Transactions with Owners in
their Capacity as Owners
Contributions of equity, net of
transaction costs 1,851,985 - - 1,851,985
Transfer of share option
reserve 16,050 (16,050) - -
Expired options - (1,564,164) 1,564,164 -
Equity settled employee
payments expense - 132,381 - 132,381
Balance at
31 December 2025 36,796,975 256,650 (25,993,790) 11,059,835
The Statement of Changes in Equity is to be read in conjunction with the
attached notes to the financial statements
Greenvale Energy Limited Half-Year Ended, 31/12/2025 Page | 14
ASX:GRV
CONDENSED CONSOLIDATED STATEMENT OF CASH FLOWS FOR
THE HALF-YEAR ENDED 31 DECEMBER 2025
Note Half-Year Ended
31 Dec 2025
$
Half-Year Ended
31 Dec 2024
$
Cash Flows from Operating Activities
Payments to suppliers and employees (665,250) (842,644)
Interest received 19,189 9,155
Grants received - 851,242
Net Cash Used in Operating Activities (646,062) 17,753
Cash Flows from Investing Activities
Payments for exploration expenditure (1,498,731) (633,461)
Proceeds from sale of investment - 1,530,000
Payment/(refund) of tenement bonds (46,744) 25,124
Payments for plant and equipment - (23,123)
Net Cash Used in Investing Activities (1,545,475) 898,540
Cash Flows from Financing Activities
Proceeds from issue of shares 1,896,896 -
Payments for share issue expense (44,911) -
Loan repayment - (2,000,000)
Net Cash Provided by Financing Activities 1,851,985 (2,000,000)
Net Decrease in Cash Held (339,552) (1,083,707)
Cash at the beginning of the financial year 2,118,463 1,523,781
Cash At the End of the Half-Year 1,778,911 440,074
The Statement of Cash Flows is to be read in conjunction with the attached notes to the financial statements.
Greenvale Energy Limited Half-Year Ended, 31/12/2025 Page | 15
ASX:GRV
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
1. STATEMENT OF MATERIAL ACCOUNTING POLICIES
Greenvale Energy Limited is a Company domiciled in Australia. This interim financial report of the
consolidated entity is for the half-year ended 31 December 2025.
BASIS OF PRESENTATION
The half-year financial report is a general-purpose financial report prepared in accordance with
the requirements of the Corporations Act 2001, Australian Accounting Standard AASB 134:
Interim Financial Reporting, Australian Accounting Interpretations and other authoritative
pronouncements of the Australian Accounting Standards Board. Compliance with AASB 134
ensures compliance with IAS 34 ‘Interim Financial Reporting’.
The half-year financial report does not include full disclosures of the type normally included in
an annual financial report. Therefore, it cannot be expected to provide a full understanding of the
financial performance, financial position and cash flows of the consolidated entity as in the full
financial report.
It is recommended that this half-year financial report be read in conjunction with the annual
financial report for the year ended 30 June 2025 and any public announcements made by
Greenvale Energy Limited during the half-year in accordance with continuous disclosure
requirements arising under the Corporations Act 2001.
The accounting policies adopted are consistent with those of the previous financial year and
corresponding half-year reporting period.
NEW AND REVISED ACCOUNTING REQUIREMENTS
The consolidated entity has adopted all of the new or amended Accounting Standards and
Interpretations issued by the Australian Accounting Standards Board ('AASB') that are mandatory
for the current reporting period. The adoption of these new or amended Accounting Standards
and Interpretations did not have a material impact to the financial statements.
Certain new accounting standards and interpretations have been published that are not
mandatory for 31 December 2025 reporting periods and have not been early adopted by the
Group. The Group's assessment of the impact of these new or amended Accounting Standards
and Interpretations, most relevant to the Group, are set out below.
AASB 18 Presentation and Disclosure in Financial Statements
This standard is applicable to annual reporting periods beginning on or after 1 January 2027 and
early adoption is permitted. The standard replaces AASB 101 'Presentation of Financial
Statements', with many of the original disclosure requirements retained and there will be no
impact on the recognition and measurement of items in the financial statements. But the
standard will affect presentation and disclosure in the financial statements, including
introducing five categories in the statement of profit or loss and other comprehensive income:
operating, investing, financing, income taxes and discontinued operations. The standard
introduces two mandatory sub-totals in the statement: 'Operating profit' and 'Profit before
financing and income taxes'. There are also new disclosure requirements for 'management-
Greenvale Energy Limited Half-Year Ended, 31/12/2025 Page | 16
ASX:GRV
defined performance measures', such as earnings before interest, taxes, depreciation and
amortisation ('EBITDA') or 'adjusted profit'. The standard provides enhanced guidance on
grouping of information (aggregation and disaggregation), including whether to present this
information in the primary financial statements or in the notes. The consolidated entity will adopt
this standard from 1 July 2027 and it is expected that there will be a significant change to the
layout of the statement of profit or loss and other comprehensive income.
GOING CONCERN
The financial statements have been prepared on the going concern basis, which contemplates
continuity of normal business activities and the realisation of assets and settlement of liabilities
in the normal course of business.
As disclosed in the financial statements, the Group recorded a net loss of $818,408, net
operating cash outflow of $646,062, and the Group had cash of $1,778,911.
The ability of the Group to continue as a going concern is principally dependent upon the
following conditions:
• the ability of the Group to successfully raise capital, as and when necessary;
• the successful lodgement of future R&D rebates;
• the ability to complete successful exploration and subsequent exploitation of the areas
of interest; and
• reducing its working capital expenditure as and when necessary.
The Directors have concluded that as a result of the requirement to raise funds in the future, there
exists a material uncertainty that may cast significant doubt regarding the Group's ability to
continue as a going concern and therefore, the Group may be unable to realise its assets and
discharge its liabilities in the normal course of business. Nevertheless, after taking into account
the Board’s expectation of successfully raising further capital, the directors have a reasonable
expectation that the Company will have adequate resources to fund its future operational
requirements and for these reasons they continue to adopt the going concern basis in preparing
the financial report.
Should the Group be unable to continue as a going concern, it may be required to realise its
assets and extinguish its liabilities other than in the ordinary course of business, and at amounts
that differ from those stated in the financial report. This financial report does not include any
adjustments relating to the recoverability and classification of recorded asset amounts or the
amounts or classification of liabilities and appropriate disclosures that may be necessary should
the Group be unable to continue as a going concern.
2. SEGMENT REPORTING
Identification of Reportable Segments
The Company has identified its operating segments based on the internal reports that are
reviewed and used by the Board of Directors (chief operating decision makers) in assessing
performance and determining the allocation of resources. The Company is managed on the basis
of its development and exploration, and with the addition of the uranium projects during the
current reporting period, the Board have now identified two segments being the Alpha Project in