Alpha Test Program Advances to next phase
Released
Released
Announcement PDF
ASX Release 8 April 2026
Interactive Investor Hub - Engage directly with the Company through our Investor hub, you can ask questions, review
comments and get direct access to the Company – follow the link greenvaleenergy.com.au/announcements
Greenvale Energy Limited ABN 54000743555 W: greenvaleenergy.com E: admin@greenvaleenergy.com.au
Perth: Level 1, 1 Alvan St, Subiaco, 6008 Brisbane: Suite 5-Level 12, 10 Market St, Brisbane 4000 Page | 1
ALPHA PROJECT TEST PROGRAMADVANCES TO NEXT PHASE
AMID TIGHTENING BITUMEN MARKET CONDITIONS
Greenvale Energy Limited ASX: GRV (“Greenvale” or “the Company”) is pleased to report further
positive progress with the current phase of test work for its Alpha Torbanite Project in
Queensland, with the successful completion of Test Program 7 (TP7), Milestone 3. TP7 contract
work with Monash University has now concluded and initial product samples have been
dispatched to Technix in New Zealand, where preliminary assessment work has commenced.
The Alpha Project hosts an Inferred Mineral Resource Estimate of 28Mt of combined Torbanite
and Cannelite for a total of 27.7 million barrels of synthetic oil equivalent1
, reported in
accordance with the JORC Code 2012 Edition.
Greenvale Managing Director Alex Cheeseman said:
“With Milestone 3 of TP7 now complete, we are excited that the next phase of this test program
is underway with Technix engaged and undertaking a hands-on analysis of the initial samples, in
order to determine the best way forward.
“This program marks the culmination of several years work on the Alpha Project, and coincides
with a time when Australian Federal and State Governments – and the population in general – are
1
Refer to ASX Announcement 51% Increase in Alpha resource substantially expands project scale and potential released
13 November 2023
Highlights
Alpha Test Program 7 (TP 7), Milestone 3 has been successfully completed, marking
the conclusion of the pressure leach liquefaction (bulk sample) production.
Bulk sample production consistently achieved conversion rates and recovery of
primary materials consistent with the optimal results achieved in previous test work
programs.
Preliminary samples have been dispatched to Technix in New Zealand for product
characterisation and initial assessment, providing a clear pathway for downstream
refinement/modification and certification.
TP7 has the single aim of producing a bituminous product from Greenvale’s Alpha
Project that can be independently certified to C-170 specification.
With its 28Mt Resource – providing 27.7 million barrels of synthetic oil equivalent –
Alpha is a highly strategic project, especially at a time when Australia remains
dependent on international supply of oil and oil-derived products (including bitumen).
Greenvale Energy Limited ASX Release
Page | 2
heavily focused on the country’s strategic energy/infrastructure needs and our current reliance
on imports is becoming an issue of national importance.
“At the moment, Australia is totally reliant on imported fuel and bitumen for our roads. Against
that backdrop, Alpha has the potential to become the single largest domestic supplier of bitumen
into the Australian market, where independent experts are predicting up to 50% rise in bitumen
price2
.”
TP7 - Milestone 3: Production runs
TP7 Milestone 3 comprised the delivery of repeat production runs to produce a bulk sample for
downstream processing/modification and independent certification.
TP7 bulk leach runs utilised drill core GM12C from the LT seam of the Alpha Project. The sample
was pulverised and sieved to a P80 of 200µm, with oversize removed to ensure particle size
uniformity. A homogeneous blend was prepared and used across all production runs to maintain
repeatability and consistent feedstock quality.
Each run employed approximately 400 g (dry basis) of GM12C, ~10 g of zinc acetate (Zn (AcO)₂)
as catalyst, and ~1,200 g of toluene as solvent.
The reactor was pressurised with hydrogen to 90 bar (cold), and reactions were conducted under
controlled conditions using induction heating. Initial runs evaluated retention times of 60 and 30
minutes at target conditions, achieving stable operation at approximately 400 °C and 26 MPa.
These parameters are consistent with those established during TP7 Milestone 2 and prior TP6
test work.
Milestone 3: Production run behaviour and yield
Figure 1 and Figure 2 below show the temperature and pressure profiles for all Milestone 3
production runs, demonstrating consistent pressure trends across all runs.
Manual heating control was adopted to ensure that target temperatures were met. An exception
was observed in run MS3-7, where the temperature overshot to 436 °C, leading to reduced
Toluene Soluble (TS) yield.
Installation of the new impeller resulted in a slight increase in reaction pressure, indicating
enhanced formation of lower molecular weight products.
Analysis of the one-hour reaction data showed that system pressure stabilised after
approximately 30 minutes, suggesting that the reaction was largely complete within this period.
Based on this observation, the reaction time was reduced to 30 minutes for subsequent runs
(MS3-5 to MS3-10) without adversely impacting process performance.
2
Source – Australian Flexible Pavement Association Industry Statement Global Bitumen Supply Chain Disruption March 2026
Greenvale Energy Limited ASX Release
Page | 3
Figure 1 – Milestone 3 Production run temperature profiles
Figure 2 – Milestone 3 Production run pressure profile
Greenvale Energy Limited ASX Release
Page | 4
Milestone 3: Yield performance and operating conditions
The table below summarises the Toluene Soluble (TS), Toluene Insoluble (TIN), estimated gas
yield, overall recovery and TS density. Under optimal conditions—characterised by no system
leaks, stable temperature control, and the use of the new impeller (runs MS3-9 and MS3-10)—TS
yields of approximately 35 wt% were achieved.
Table 1 – Summary of Hydrogenation production runs
No clear correlation was observed between TS yield and either reaction time or target
temperature within the range of 400–410 °C. However, temperature excursions, such as the
overshoot to 436 °C in run MS3-7, were found to negatively impact TS yield.
As advised in ASX announcement Test program 7 – Milestone 3 sample production update
released 6 March 2026, production run 1 remains a statistical outlier and deemed not
representative.
Milestone 3: Viscosity enhancement
The viscosity of five TS samples taken from run MS3-10 was measured after applying different
post-treatment methods. These included direct collection after toluene removal, additional
rotary evaporation, oven drying at 105 °C under nitrogen for varying durations, and
dichloromethane (DCM) treatment followed by drying. Each method resulted in varying degrees
of mass loss due to removal of volatile components.
The removal of volatiles has been seen as a key process step to support C-170 certification, this
is a primary function of the initial assessment work being undertaken by Technix.
Initial results from viscosity enhancement work completed by Monash university were promising,
with all data provided to Technix to support their initial assessment.
Technix Initial Assessment
Technix of New Zealand has now commenced product characterisation of samples from MS3
production runs six and seven. Technix will focus on key technical parameters of the product,
completing several tests internally and with third party providers.
Greenvale Energy Limited ASX Release
Page | 5
Testing will include but is not limited to flash point assessment, boiling point distribution,
viscosity assessments, penetration testing, chemical assay, durability and density
assessments.
Each test/assessment will act as a technical gate to progress through, the data derived from the
initial assessment will allow Technix to determine the best refinement/additive solution for the
TP7 bulk sample to enable product modification and then certification.
Authorised for release
This announcement has been approved for release by the Board of Directors.
For further information please contact
Alex Cheeseman Nicholas Read
Managing Director Read Corporate
E: admin@greenvaleenergy.com.au E: nicholas@readcorporate.com.au
M: +61(0) 485 603 120 M: +61(0)419 929 046
About Greenvale Energy Limited
Greenvale is an ASX-listed exploration company, committed to building a portfolio of projects that will
support the need for clean energy and critical infrastructure. The Company is building a large land holding
in the world-class Pine Creek region of the Northern Territory, and also owns the advanced, high-grade
Oasis Uranium Project in Queensland. The Company has additional new-energy/forward facing projects
including the strategically significant Alpha Project. Greenvale’s projects are all aligned with the global
need for reliable, sustainable, low-emissions energy and supply chains. The Company believes the best
way to create long-term shareholder value is by investing in exploration, to make discoveries and grow its
resource-base.
Competent Person Statement
The information in this announcement, as it relates to exploration results, interpretations and conclusions,
is based on information reviewed by Mr Mark Biggs, who is an independent technical adviser to Greenvale
Energy Ltd and is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM, #10788). Mr
Biggs is a Director of ROM Resources Consultant to the Company, and has sufficient experience that is
relevant to the style of mineralisation and type of deposit under consideration, and to the overseeing of
activities being undertaken to qualify as a Competent Person (as defined in the JORC 2012 edition of the
“Australasian Code for Reporting of Mineral Resources and Ore Reserves”. Mt Biggs consents to the
inclusion of this information in the form and context in which it appears.
Previously Reported Information
This document contains information relating to the Mineral Resource Estimate for the Alpha Project, which
is extracted from the Company’s ASX Announcement 51% Increase in Alpha resource substantially
expands project scale and potential released 13 November 2023 and reported in accordance with the 2012
JORC Code and available for viewing at greenvaleenergy.com.au. The Company confirms that it is not
aware of any new information or data that materially affects the information included in the original
announcement and that all material assumptions and technical parameters underpinning the Mineral
Resource Estimate continue to apply and have not materially changed.
Forward Looking Statements
This announcement may contain certain forward-looking statements and projections. Such forward
looking statements/projections are estimates for discussion purposes only and should not be relied upon.
Forward looking statements/projections are inherently uncertain and may therefore differ materially from
results ultimately achieved. The Company does not make any representations and provides no warranties
Greenvale Energy Limited ASX Release
Page | 6
concerning the accuracy of the projections and disclaims any obligation to update or revise any forward-
looking statements/projects based on new information, future events or otherwise except to the extent
required by applicable laws. While the information contained in this report hasbeenprepared in good faith,
neither the Company nor any of its directors, officers, agents, employees or advisors give any
representation or warranty, express or implied, as to the fairness, accuracy, completeness or correctness
of the information, opinions and conclusions contained in this announcement.
Greenvale Energy Limited ASX Release
Page | 7
Appendix 1 – Sample Details
Table A1-1, below, lists the origin data for the test sample.
Table A1-1: Borehole Data Details for Composite Test Sample
Hole ID Sample ID Easting Northing RL
Total
Depth
(m)
Azimuth (°)
Inclination
(°)
Depth
From
(m)
Depth
To (m)
Interval
(cm)
Seam
GM11C GM11C3 481332 7333200 447 45 0 -90 37.53 37.73 20 LT
GM12C
GM12C5 +
C6
481867 7333226 440 33 0 -90
22.09 22.75 66
LT/L2
GM12C 25.07 25.30 23
GM13C GM13C5 482325 7333171 445 25 0 -90 17.47 17.74 27 LT
GM57C GM57C3 482346 7332917 443 37.7 0 -90 24.72 25.22 50 LT
GM72C GM72C3
483103 7331906 446 42.7 0 -90
36.00 36.08 8 LT
GM72C GM72C4 36.08 36.21 13 LT
GM73C GM73C3
483605 7331921 461 49.05 0 -90
39.40 39.60 20 LT
GM73C GM73C4 39.60 39.75 15 LT
GM78C GM78C3 482041 7333418 445 27 0 -90 18.37 18.71 34 LT
GM80C GM80C4
482545 7333400 452 25 0 -90
16.43 16.49 6 LT
GM80C GM80C5 16.49 16.93 44 LT
GM81C GM81C3 482840 7333389 465 37 0 -90 26.92 27.56 64 LT
Total 390
Note: all coordinates are provided in GDA2020, zone 55
Greenvale Energy Limited ASX Release
Page | 8
Appendix 2 - JORC Code, 2012 Edition – Table 1 Report
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples
should not be taken as limiting the broad meaning of
sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been done
this would be relatively simple (e.g. ‘reverse circulation
drilling was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fire assay’).
In other cases, more explanation may be required, such
as where there is coarse gold that has inherentsampling
problems. Unusual commodities or mineralisation
types (e.g. submarine nodules) may warrant disclosure
of detailed information.
Samples for metallurgical testing (Test Program 7) were
selected from 2023 exploration drilling, specifically HQ
core as outlined in Appendix 1 (Table A1-1).
Details of the drilling program been provided in previous
ASX releases in October 2023 and May 2025.
Standard drilling and core techniques were employed in
generally shallow holes drilled vertically.
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (e.g. core diameter, triple or standard tube,
depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
Standard RAB and diamond HQ coring rigs were utilised.
Drill sample
recovery
• Method of recording and assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximise sample recovery and
ensure representative nature of the samples.
• Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
All core selected from testing was from boreholes with
core recovery >90%.
Logging • Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining
studies and metallurgical studies.
• Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
• The total length and percentage of the relevant
intersections logged.
Detailed logging was not undertaken at the site but later
after sample delivery to the lab. Logging was to the Coal
Log V2 standard.
Whereas previously outcrop sampling of material has
only been used for sighter testing; with all Mineral
Resource estimation, mining, and metallurgical studies
to be developed based evaluation of the core sample
material.
Photographic records have been taken which shows
each horizon sampled and the weight of samples taken
from each sample location has been recorded.
Sub-sampling
techniques and
sample
preparation
• If core, whether cut or sawn and whether quarter, half or
all core taken.
• If non-core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
The bulk sample was taken in substantial quantities of
about 20 kilograms and of both torbanite and cannel
coal portions of the 63mm core. Samples were held by
Stratum and Subsampling for this exercise was
undertaken by Stratum Laboratories.
Greenvale Energy Limited ASX Release
Page | 9
Criteria JORC Code explanation Commentary
• Quality control procedures adopted for all sub-
sampling stages to maximise representivity of samples.
• Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size
of the material being sampled.
Splits of approximately 400 grams were cut from
subsamples obtained from Stratum splits of the subcrop
samples. Smaller samples were used in the program to
facilitate subsequent processing in the laboratory.
The splits were pulverised to sub 200 microns
undertaken immediately prior to the tests being
conducted.
Subsamples were cut and placed under nitrogen and
forwarded to Melbourne for the test program at the
Melbourne University.
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (i.e.
lack of bias) and precision have been established.
The subsamples had been held in refrigeration below
zero in sealed bags.
Post pulverization the samples held under nitrogen
overpressure until used.
A range of tests were conducted on the carrier oil and the
sample types to ensure the program could be
meaningfully executed. Subsequent tests were then
undertaken to a standard set of procedures. In all 19
tests were conducted to establish the set of 12 test
result sets.
Laboratory tests were conducted based on standard
analytical techniques such as TGA, Proximate and
Ultimate.
Verification of
sampling and
assaying
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
• Discuss any adjustment to assay data.
The samples derived from the core have been observed
by multiple personnel including Engineers, Geologists
and Greenvale employees have been involved in the
sample acquisition.
Location of data
points
• Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches, mine
workings and other locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
The samples taken are described in Table A1-1 in
Appendix 1. Coordinate system MGA55 GDA94 datum is
expected to be accurate to +/- 30m.
Data spacing
and distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient
to establish the degree of geological and grade
continuity appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and classifications
applied.
• Whether sample compositing has been applied.
Not relevant for this discussion of metallurgical testing.
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
this is known, considering the deposit type.
• If the relationship between the drilling orientation and
the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
Not relevant for this discussion of metallurgical testing.
The deposit strikes at 300 degrees with gentle dips to the
south and southwest. The intersecting boreholes were
planned as vertical.
Sample security • The measures taken to ensure sample security. Sampleshavebeenstoredindedicatedfreezers fromthe
time the sample was acquired and after sample
Greenvale Energy Limited ASX Release
Page | 10
Criteria JORC Code explanation Commentary
preparation.
Chain of custody was managed by ALS.
Samples have been transported in sealed bags, from
ALS Brisbane to Monash University in Melbourne.
Audits or
reviews
• The results of any audits or reviews of sampling
techniques and data.
No audits or reviews have been conducted.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and ownership
including agreements or material issues with third
parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
• The security of the tenure held at the time of reporting
along with any known impediments to obtaining a
licence to operate in the area.
MDL 330 is held by Alpha Resources Pty Ltd, a subsidiary
of Greenvale Energy Limited. MDL 330 was first granted
on 1 February 2002. An application for a renewal for an
additional 5-year term was submitted in July 2021 and
approved in July 2022.
The current 5-year term expires on 31 January 2027.
MDL 330 covers an area of 1,904.5 Ha.
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by other
parties.
Historically there has been exploration carried out over
85 years since the 1940’s. The various titles have been
held by Alpha Resources since 2002.
Table A2-1 lists the various explorers:
Geology • Deposit type, geological setting and style of
mineralisation.
The Alpha deposit lies within the axis of the Glen Avon
Syncline, a southwest plunging fold structure that
occurs on the eastern flank of the Galilee Basin.
The deposit is part of the Permian Colinlea Sandstone,
which contains 150 m of cross-bedded sandstones with
minor conglomerate, siltstones, and mudstones.
The Geology of the deposit consists of an Upper and
Lower seamof cannel with atorbanite lens present inthe
Lower seam.
The Colinlea Sandstone is thought to be a lower delta
plain deposit with the coal deposited in swamps and
shallow lakes in this near shore environment. The
torbanite is thought to have been deposited from algae
in a lacustrine environment when water entering the
system held little sediment or organic material.
Greenvale Energy Limited ASX Release
Page | 11
Criteria JORC Code explanation Commentary
Drill hole
Information
• A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material
drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above
sea level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the
basis that the information is not Material and this
exclusion does not detract from the understanding of
the report, the Competent Person should clearly explain
why this is the case.
See Table A1-1 in Appendix 1, which includes all relevant
new drill hole information and seam intercepts.
All Greenvale and IMC exploration holes have been
either traditional theodolite or DGPS surveyed with
stated accuracies of 0.1m in X & Y and 0.2m in Z.
Top of coal depths are accurate to 0.1m and interpreted
from chip logs / core logging and downhole geophysics,
where carried out.
Where available verticality was loaded, and the holes
were modelled accounting for any inclination. An
alternative model was generated treating all holes as
vertical.
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade
truncations (e.g. cutting of high grades) and cut-off
grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of
high-grade results and longer lengths of low-grade
results, the procedure used for such aggregation should
be stated and some typical examples of such
aggregations should be shown in detail.
• The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Torbanite and cannel coal horizons were modelled
separately and not aggregated.
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important in the
reporting of Exploration Results.
• If the geometry of the mineralisation with respect to the
drill hole angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are
reported, there should be a clear statement to this
effect (e.g. ‘down hole length, true width not known’).
All drill holes were drilled at 90° to the surface and
although some verticality logs are available, the deposit
was modelled where holes are assumed to be vertical.
Downhole verticality survey is available for all drill
holes.
Seam intercepts are recorded on a downhole basis.
Downhole geophysical logs were used to confirm the
seam intercepts and thicknesses.
As the deposit is gently dipping and drill holes are
generally shallow, the downhole seam thickness will
approximate the true thickness of the coal.
Diagrams • Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should
include but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
All appropriate diagrams have been released in
preceding ASX Releases in March 2023 and May 2025
Balanced
reporting
• Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration
Results.
All available data for the Torbanite area has been
collated and reported.
This release contains all relevant information.
Other
substantive
exploration data
• Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
GEOLOGY
The updated interpretation is predominantly based on
the 2023 and 2021 drilling results.
Limited historical drill hole information was used to
supplement the 2021 and 2023 drilling and support the
continuity of the Upper and Lower seams outside the
Greenvale Energy Limited ASX Release
Page | 12
Criteria JORC Code explanation Commentary
substances. bounds of the MDL area.
METALLURGY
Pressure Leach Program – TP7 Update & Process
Direction
TP7 has now confirmed that operating at 410°C with 30-
minute retention, under hydrogen at 80 bar and total
reaction pressure of 26 MPa (260 bar), using zinc acetate
catalyst and toluene solvent, delivers ~99% conversion
of Torbanite into pressure leach liquefaction solution.
Solvent recovery has been validated at ~98.9%, placing
the process in a strong position to eliminate alternative
catalysts and THF solvent pathways, allowing full focus
on the streamlined toluene-based route.
The hydrofoil-type impeller mixing configuration has
proven effective, with pressure-temperature behaviour
closely matching the predictedpressure leachcurve and
demonstrating consistent solution chemistry.
All TP7 samples tested to date are non-blended single LT
core material, predominantly shale with high
hydrocarbon ratios and lower sulphides. This pre-leach
control strategy was implemented to minimise post-
leach volatile variability from blends and to target C170
compliance.
For C-170 compliance under AS/NZS requirements, the
program has focused on Asphaltene characterisation,
generating:
• TS (Toluene Solubles)
• TIN (Toluene Insolubles)
• TP7 Bulk leach runs have consistently
achieved:
• TS yield: 32–36%
• TIN yield: ~63%
• Overall torbanite recovery: ~99%
• Gas yield: 1.2–1.4%
The low gas yield remains under review. Even if resolved,
achieving historical 18–20% gas yields (as per TP6) is
unlikely to materially alter TS/TIN distribution, as both
primary and secondary shale cracking reactions are
completing within the 30-minute retention window.
Increased gas production would likely extend in-reactor
residence behaviour rather than significantly impact
conversion efficiency. A scope gap allowance can be
evaluated during pilot-stage pre-feasibility.
Blending between L1, L2, LT, and LU will need to be
modelled based on PU analysis data post completion of
C-170 certification.
An NMR test (not TGA) confirmed that detected volatiles
are predominantly DMB (Dimethylbenzene/Xylene type
compounds) rather than residual toluene from the TS
fraction.
DCM (Dichloromethane) washing has been adopted as a
substitute for Heptane/Hexane following removal of the
THF pathway in TP7 milestone 3. The prior THF route
demonstrated significant viscosity increase in the TS
Greenvale Energy Limited ASX Rele