Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX Release 31 October 2025
Interactive Investor Hub - Engage directly with the Company through our Investor hub, you can ask questions, review
comments and get direct access to Management – follow the link greenvaleenergy.com.au/announcements
Greenvale Energy Limited ABN 54000743555 W: greenvaleenergy.com E: admin@greenvaleenergy.com.au
Perth: Level 1, 1 Alvan St, Subiaco, 6008 Brisbane: Suite 5-Level 12, 10 Market St, Brisbane 4000 Page | 1
SEPTEMBER 2025 QUARTERLY ACTIVITIES REPORT
DRILLING AT OASIS DELIVERS HIGH-GRADE RESULTS, WITH CLEAR
POTENTIAL FOR FUTURE GROWTH AND SCALE
Greenvale Energy Limited ASX: GRV (“Greenvale” or “the Company”) is pleased to report on its
activities for the quarter ended 30 September 2025 (“the Quarter”).
During the Quarter, Greenvale’s core focus was on the completion of its maiden drill program at
the Oasis Uranium Project in Queensland. Field work was also conducted in the NT, with a major
expansion of tenure at the Douglas River Project. Test Program 7 for the Alpha Torbanite Project
also continued to advance.
Highlights
▪ Greenvale’s maiden drilling program at Oasis was completed during the Quarter, with
multiple high-grade uranium intercepts.
▪ Chemical assay and downhole spectral gamma logging confirmed high-grade
mineralisation including:
Drill hole 25GRV001 with 9m @ 758ppm U3O8 from 40m downhole, including:
- 1m @ 1,637ppm U3O8 from 40m downhole; and
- 1m @ 1,466ppm U3O8 from 47m down hole.
Drill hole 25GRV002 with 8m @ 2,125ppm U3O8 from 84m downhole, including:
- 5m @ 3,263ppm U3O8 from 84m downhole; and
- 1m @ 6,929.57ppm U3O8 from 86m downhole.
Drill hole 25GRV003 with 4.7m @ 786ppm eU3O8 from 279.1m downhole, including:
- 0.7m @ 1,733ppm eU3O8 from 279.3m downhole; and
Drill hole 25GRV004 with 2.1m @ 1,638ppm eU3O8 from 77.1m downhole, including:
- 0.6m @ 3,841ppm eU3O8 from 78.1m downhole.
▪ Chemical assays from the remaining Oasis drillholes (drill holes 3-12) and downhole
gamma logs (drill holes 7-12) are expected in the December Quarter.
▪ Two additional Exploration Licence Applications acquired at the Douglas River
Uranium Project in the NT, increasing Greenvale’s tenure in the highly prospective Pine
Creek Region to ~1,216km2
.
Greenvale Energy Limited ASX Release
Page | 2
Operational Activities
Oasis Uranium Project (100%) – EPM 27565, Queensland
During the Quarter, Greenvale successfully completed its maiden drilling program at the Oasis
Uranium Project in north-west Queensland. The program represented the first modern drilling at
the project in over 15 years and delivered a transformational outcome for Greenvale’s uranium
portfolio.
Drilling commenced on 27 July 2025 following site establishment and the clearing of access
tracks. The program comprised a total of twelve holes for 1,804 metres of combined Reverse
Circulation (RC) and diamond core drilling, designed to:
▪ Confirm historical uranium intercepts within the main Oasis deposit;
▪ Test for extensions of mineralisation along strike; and
▪ Test for extensions of mineralisation at depth.
All results will be incorporated into a geological model to support future drill target development
and possible future resource calculations.
Drilling was completed safely and on schedule under stable ground conditions, with no
reportable incidents recorded.
Mid-program, an initial round of spectral gamma logging and acoustic televiewer imaging was
conducted across the initial sequence of diamond holes. Drill core samples from early holes
(25GRV01 and 25GRV02) were submitted to Intertek Adelaide for chemical analysis.
The program’s remaining holes were designed to progressively step-out to the north and south of
the known mineralisation and to test the system at depth. Downhole geophysical logging of the
remaining holes is scheduled for completion at the beginning of the December Quarter, with core
still being processed and sampled at the end of this reporting period. The program concluded in
the first week of September, with all major equipment demobilised and cleared from the project
site by 9 September.
Exploration Results and Interpretation
The maiden drill program confirmed multiple zones of high-grade uranium mineralisation within
a chlorite-biotite-schist shear zone, hosted by foliated granitic gneiss and high-grade (i.e., high
formation pressure/temperature) metamorphics. Key chemical assay and spectral gamma
results released during the Quarter are detailed in Table 1. An image of the very-high-grade drill
hole 25GRV002 is provided in Figure 1.
These excellent early results confirm mineralisation continuity along strike and down-dip to
depths exceeding 300m, with the system remaining open in all directions.
Strong correlation between spectral gamma and chemical assays also confirmed overall
radiometric equilibrium, enhancing confidence in down-hole logging as a reliable predictive tool
for future resource modelling.
Greenvale Energy Limited ASX Release
Page | 3
Table 1 – Previously Reported Exploration Results from Oasis Uranium Project
Hole ID
Downhole Spectral Gamma Intercepts
(500ppm cutoff)
Chemical Assay Intercepts
From
(m)
To
(m)
Thickn
ess (m)
Avg. eU
(ppm)
Avg.
eU3O8
(ppm)
From
(m)
To
(m)
Thickn
ess (m)
Avg. U
(ppm)
Avg. U3O8
(ppm)
25GRV01
40.8 41.3 0.5 2407.63 2839.07 40 41 1 1388.78 1637.65
45 45.1 0.1 1062.14 1252.48 45 46 1 243.85 287.55
46.1 46.4 0.3 1608.48 1896.72 46 47 1 916.53 1080.77
48 48.8 0.8 1669.1 3934.41 48 49 1 786.46 927.39
52.5 52.7 0.2 1222.3 1441.34 52 53 1 553.49 652.68
25GRV02
84.1 85.4 1.3 2218.86 2616.48
84 85 1 2755.39 3249.16
85 86 1 1281.54 1511.19
86 88.6 2.6 2503.02 2951.56
86 87 1 5876.5 6929.57
87 88 1 2785.98 3285.23
25GRV03
279.3 280.1 0.8 1470.59 1734.12 Assays Pending
282.7 283.1 0.4 1142.14 1346.81 Assays Pending
283.3 283.6 0.3
1280.80
3
1510.32 Assays Pending
25GRV04
63.6 63.7 0.1 1076.08 1268.91 Assays Pending
78 78.7 0.7
2944.90
7
3472.63 Assays Pending
78.9 79.1 0.2 1069.53 1261.19 Assays Pending
25GRV05 No intervals above 500ppm eU Assays Pending
25GRV06
89.3 89.6 0.3 546.489 644.42 Assays Pending
90 90.4 0.4
755.230
3
890.57 Assays Pending
25GRV07 Pending Assays Pending
25GRV08 Pending Assays Pending
25GRV09 Pending Assays Pending
25GRV10 Pending Assays Pending
25GRV11 Pending Assays Pending
25GRV12 Pending Assays Pending
Figure 1 – Core from drill hole 25GRV002 with very high-grade interval @ 6,929.57ppm U3O8
from 86m downhole.
Greenvale Energy Limited ASX Release
Page | 4
Regional Sampling and Broader Potential
In addition to the drilling program, the Company also completed reconnaissance mapping and
sampling during the Quarter targeting radiometric and magnetic anomalies that extend beyond
the Oasis deposit. A total of 33 rock-chip samples were collected from granitic outcrops,
returning 16 samples of >10ppm U, and five samples of >30ppm U. The standout result of
187.4ppm U from a diorite dyke, located 4.5km north-east of the deposit, strongly supports the
interpretation of a broader mineralised system.
These results indicate clear regional extension potential, with uranium anomalism occurring in
multiple granite-hosted targets within the broader tenement as can be seen in Figure 2.
Figure 2 - Simplified regional geology, underlying interpreted mineralisation trends (yellow
boxes), structural elements and anomalous rock-chip sample locations.
The results at the Oasis deposit and broader regional targets firmly establish the Oasis Uranium
Project as a high-quality, advanced exploration asset. The combination of high-grade chemical
assays correlating with spectral gamma data, along with radiometric anomalies and sampling
results coincident with the right structural and geological setting, provides a robust foundation
for the next phase of exploration and project development.
Northern Territory Uranium Projects
Elkedra Project (80%) – EL33756
During the Quarter, work programs at the Elkedra Project centred on planning and refinement of
future fieldwork plans. Sentinel-2 remote sensing data was procured with detailed analysis
pending.
Greenvale Energy Limited ASX Release
Page | 5
Douglas River Project (80%) – EL33670, ELA 33900, ELA34114 and ELA34157
During the Quarter, the Company executed an amendment to its existing Douglas River
Acquisition Agreement with Gempart (NT) Pty Ltd, securing two additional Exploration Licence
Applications (ELAs), ELA34114 and ELA34157.
Greenvale’s total land position is now approximately 1,216km2
across the Pine Creek Region –
one of the world’s most significant uranium and gold provinces. The geological setting indicates
the potential for shallow, sandstone-hosted and unconformity type uranium deposits such as
Patronus Resources’ Thunderball deposit, seen in relation to the expanded Douglas River Project
in Figure 3.
Figure 3 – Douglas River Project area and proximal Uranium deposits
Greenvale Energy Limited ASX Release
Page | 6
Henbury Project (80%) – EL33637 and EL33638
During the Quarter, the Company undertook a detailed review of the 2024 airborne magnetics/
radiometric survey results. Sentinel-2 multispectral data was also acquired, revealing multiple
potentially uranium-related gas anomalies coincident with geophysical features, favourable
geology and structural relationships.
A total of 21 individual exploration target areas were highlighted for an initial field program
designed for geological reconnaissance and ground truthing the coincident anomalies. Detailed
and structured ground radiometric, portable XRF data and some geological mapping were
completed over priority targets as seen in Figure 4. A quartz pebble conglomerate was mapped
to the south of Target 2, coincident with anomalous ground radiometric readings.
Data is currently being analysed to determine the next steps at Henbury.
Figure 4 – Henbury Project Priority Target Areas for completed field work
Tobermorey Project (80%) – EL33621 and EL33692
During the Quarter, following initial exploration assessment, the Company made the decision to
withdraw from its acquisition agreement with Gempart (NT) Pty Ltd relating to the Tobermorey
Project (EL33621 and EL33692).
Greenvale Energy Limited ASX Release
Page | 7
Alpha Torbanite Project (100%) – MDL 330 and EPM27718, Queensland
During the Quarter, the Company progressed its technical development of the Alpha Torbanite
Project through Test Program 7 (TP7), currently contracted to Monash University.
The first phase of TP7 centres on the procurement and modification of Monash’s liquefaction
laboratory test apparatus to enable it to achieve the necessary test conditions.
Therehavebeen ongoingdelays with theprocurement aspectsof TP7,whichare part of Monash’s
scope of works and beyond the Company’s control.
During the Quarter, the Company engaged a Perth-based Process Engineering consultant to
support the progression of TP7 and broader development activities relating to the Alpha Project.
Process engineering efforts have centred on comprehensive documentation of conditions being
utilised for TP7 to ensure repeatability. Engineering discussions have also expanded with NZ-
based Techix who are being more actively engaged int eh development of th processing solution
for the Alpha Project.
Geothermal Projects
Millungera Basin (100%) – EPG 2023, EPG 2024 and EPG 2025 - Queensland
No work was undertaken on the Millungera Basin tenements during the Quarter. During the
Quarter, the Company was granted EPG 2023 with an initial term expiring 18 September 2030.
Longreach (100%) – EPG 2029 Queensland
No work was undertaken on EPG 2029 during the Quarter. During the Quarter, the Company was
granted EPG 2029 with an initial term expiring 7 July 2030.
Schedule of Tenements
The Company’s tenement schedule is provided in Appendix 1.
ESG and Sustainability
During the Quarter, Greenvale continued to engage with a number of the Traditional Owners
across the Company’s uranium exploration portfolio, along with landowners/pastoralists for the
Oasis and Henbury Projects. The Company maintained regular dialogue with the Queensland
Department of Natural Resources and Mines, Manufacturing and Regional and Rural
Development regarding the progression of its Geothermal Exploration Permits leading to the
successful grant of the EPGs.
Finance
Cash Position
The Company held cash and cash equivalents of approximately AUD$2.0 million (unaudited) at
30 September 2025.
Greenvale Energy Limited ASX Release
Page | 8
Exploration Expenditure
During the Quarter, the Company invested approximately AUD$693,000 in exploration and
evaluations activities across its project portfolio, approximately 95% was focused on uranium
exploration, with expenditure principally allocated to drilling and drilling related costs at the
Oasis Uranium Project.
R&D Expenditure
The Company is currently preparing its R&D claim for FY24/25 and expect to lodge the claim in
the coming weeks. The Company expects 43.5% of its R&D-based expenditure to be returned
under the R&D tax incentive program. To date the Company has received over $3M under the R&D
tax incentive program.
Other Disclosure
As disclosed under item 6 in the Appendix 5B, the Company made payments to related parties
for a total consideration of AUD$35,000. This consideration relates to payments attributable to
routine Director fees including statutory superannuation.
The Company maintains a Director-provided finance facility, the facility remains undrawn, the
Company ended the Quarter with zero debt.
The Company confirms that there was no mine production nor mine development activities for
the Quarter.
Corporate Activity
During the Quarter, the Company continued its active shareholder and investor engagement,
presenting at the Resources Rising Stars Twilight Series conferences in Sydney and Melbourne,
as well as the annual Resources Rising Stars conference on the Gold Coast. Recorded copies of
the presentations are available on the Company website. The Company also presented at the
RIU Uranium investor day in Perth.
Greenvale encourages all shareholders and potential investors to register their details on the
Greenvale InvestorHub/website to be kept fully informed of the Company’s progress and
activities.
AGM
Subsequent to the end of the Quarter, the Company advised that its Annual General Meeting
would be held on 10 November 2025 in Brisbane, all materials for the AGM will be available on
the Company’s website.
Capital Structure
At the end of the Quarter, the Company had 545,123,344 shares on issue, and 21,750,000
performance rights on issue.
Greenvale Energy Limited ASX Release
Page | 9
Key ASX Announcements during the Quarter
Maiden Drill Program Commences at Oasis Uranium Project dated 28 July 2025
Resource Rising Stars Twilight Series Presentation dated 29 July 2025
Significant Expansion of Douglas River Uranium Project dated 8 August 2025
Strong Start to Maiden Drill Program at Oasis dated 27 August 2025
Commencement of Henbury Field Program dated 1 September 2025
High-grade Uranium from Drilling at Oasis dated 4 September 2025
Chemical Assay confirms High-grade Uranium dated 17 September 2025
RRS Gold Coast Presentation dated 18 September 2025
All announcements are available at: greenvaleenergy.com.au/announcements
Authorised for release
This announcement has been approved for release by the Board of Directors.
For further information please contact
Alex Cheeseman Nicholas Read
CEO Read Corporate
E: admin@greenvaleenergy.com.au E: nicholas@readcorporate.com.au
M: +61(0)419 929 046
About Greenvale Energy Limited Greenvale is an ASX-listed exploration company with a portfolio of projects that will
support a sustainable, low-carbon future. The Company has greenfield, uranium exploration projects in the Northern
Territory, the high-grade Oasis Uranium project in Queensland and the Alpha Torbanite project in Queensland. The
Company believes the best way to create long-term shareholder value is by investing in exploration, to make
discoveries and grow its resource-base.
Compliance Statement This announcement contains information on the Oasis, Douglas River, Henbury and Alpha
projects, extracted from ASX market announcement dated 28 July 2025, 8 August 2025, 27 August 2025, 1 September
2025, 4 September 2025 and 17 September 2025 reported in accordance with the 2012 JORC code and available for
viewing at greenvaleenergy.com.au/announcements. The Company confirms that it is not aware of any new
information or data that materially affects the information included in any original announcement and that all material
assumptions and technical parameters underpinning the estimates in the original market announcement continue to
apply and have not materially changed.
Forward Looking Statements This announcement may contain certain forward-looking statements and projections.
Such forward looking statements/projections are estimates for discussion purposes only and should not be relied
upon. Forward looking statements/projections are inherently uncertain and may therefore differ materially from
results ultimately achieved. The Company does not make any representations and provides no warranties concerning
the accuracy of the projections and disclaims any obligation to update or revise any forward-looking
statements/projects based on new information, future events or otherwise except to the extent required by applicable
laws. While the information contained in this report has been prepared in good faith, neither the Company nor any of
its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to the
fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
announcement.
Greenvale Energy Limited ASX Release
Page | 10
Appendix 1 – Schedule of Tenements at 30 September 2025
Alpha Project, Queensland
Tenement Owned by Status
Acquired
Interest during
Quarter
Disposed
Interest during
Quarter
Interest at end of
Quarter
MDL 330 Alpha Resources Pty Ltd Current to 31 January 2027 - - 100%
EPM 27718 Alpha Resources Pty Ltd Current to 14 February 2026 - - 100%
Geothermal Project, Queensland
Tenement Applicant Status
Acquired
Interest during
Quarter
Disposed
Interest during
Quarter
Interest at end of
Quarter
EPG 2023 Greenvale Energy Ltd Current to 18 September 2030 - - 100%
EPG 2024 Greenvale Energy Ltd Under Application - - 100%
EPG 2025 Greenvale Energy Ltd Under Application - - 100%
EPG 2029 Greenvale Energy Ltd Current to 7 July 2030 - - 100%
Uranium Project, Queensland
Tenement Owned by Status
Acquired
Interest during
Quarter
Disposed
Interest during
Quarter
Interest at end of
Quarter
EPM 27565 Greenvale Utilities Pty Ltd Current to 23 February 2027 - - 100%
Tenement Applicant Status
EPM 29203 Greenvale Utilities Pty Ltd Under Application - - 100%
Uranium Projects, Northern Territory
The Company holds an exclusive right to acquire up to 80% of the legal and beneficial interest in the Northern Territory Uranium
Projects under is Farm-in Agreement with Gempart (NT) Pty Ltd
Tenement Owned by Status
Acquired
Interest during
Quarter
Disposed
Interest during
Quarter
Interest at end of
Quarter
EL 33670 Greenvale Utilities Pty Ltd Current to 19 May 2030 - - 80%
EL 33756 Greenvale Utilities Pty Ltd Current to 26 September 2030 - - 80%
EL 33637 Greenvale Utilities Pty Ltd Current to 14 April 2030 - - 80%
EL 33638 Greenvale Utilities Pty Ltd Current to 14 April 2030 - - 80%
EL 33621 Greenvale Utilities Pty Ltd Current to 14 April 2030 - 80% 0
EL 33692 Greenvale Utilities Pty Ltd Current to 11 August 2030 - 80% 0
Tenement Applicant Status
ELA 33900 Greenvale Utilities Pty Ltd Under Application - - 80%
ELA 34157 Greenvale Utilities Pty Ltd Under Application 80% - 80%
ELA 34114 Greenvale Utilities Pty Ltd Under Application 80% - 80%
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Greenvale Energy Ltd
ABN Quarter ended (“current quarter”)
54 000 743 555 30 September 2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
1. Cash flows from operating activities
1.1 Receipts from customers
1.2 Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs
(e) administration and corporate costs (402) (402)
1.3 Dividends received (see note 3)
1.4 Interest received 14 14
1.5 Interest and other costs of finance paid
1.6 Income taxes paid
1.7 Government grants and tax incentives
1.8 Other (provide details if material)
1.9 Net cash from / (used in) operating activities (389) (389)
2. Cash flows from investing activities
2.1 Payments to acquire or for:
(a) entities
(b) tenements (47) (47)
(c) property, plant and equipment
(d) exploration & evaluation (693) (693)
(e) investments
(f) other non-current assets
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
2.2 Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
2.3 Cash flows from loans to other entities
2.4 Dividends received (see note 3)
2.5 Other (provide details if material)
2.6 Net cash from / (used in) investing activities (740) (740)
3. Cash flows from financing activities
(1)
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
3.3 Proceeds from exercise of options
3.4 Transaction costs related to issues of equity
securities or convertible debt securities (1)
3.5 Proceeds from borrowings
3.6 Repayment of borrowings
3.7 Transaction costs related to loans and
borrowings
3.8 Dividends paid
3.9 Other (provide details if material)
3.10 Net cash from / (used in) financing activities (1) (1)
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
2,118 2,118
4.2 Net cash from / (used in) operating activities
(item 1.9 above)
(389) (389)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(740) (740)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
(1) (1)
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
4.5 Effect of movement in exchange rates on cash
held
- -
4.6 Cash and cash equivalents at end of period 989 989
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 589 118
5.2 Call deposits 400 2,000
5.3 Bank overdrafts
5.4 Other (provide details)
5.5 Cash and cash equivalents at end of quarter
(should equal item 4.6 above)
989 2,118
6. Payments to related parties of the entity and their associates Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their associates
included in item 1
35
6.2 Aggregate amount of payments to related parties and their associates
included in item 2
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an explanation
for, such payments.
More information concerning the breakdown of the above payments to directors and their related parties can be
found within the accompanying Quarterly Activities Report.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities 1,000 -
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities 1,000 -
7.5 Unused financing facilities available at quarter end 1,000
7.6 Include in the box below a description of each facility above, including the lender, interest rate,
maturity date and whether it is secured or unsecured. If any additional financing facilities have
been entered into or are proposed to be entered into after quarter end, include a note
providing details of those facilities as well.
(a) Loan facilities – directors
The unsecured at-call loans to the Company from related parties, with the following terms:
• interest at 15.00% per annum; and
• once drawn, to be repaid at the earlier of the next capital raising (including an offer
entitlement) or 18 months from when the final drawdown has been made by the Company.
At the end of the quarter and as at the date of this report the facility is undrawn.
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (389)
8.2 (Payments for exploration & evaluation classified as investing activities)
(item 2.1(d))
(693)
8.3 Total relevant outgoings (item 8.1 + item 8.2) (1,082)
8.4 Cash and cash equivalents at quarter end (item 4.6) 989
8.5 Unused finance facilities available at quarter end (item 7.5) 1,000
8.6 Total available funding (item 8.4 + item 8.5) 1,989
n/a
8.7 Estimated quarters of funding available (item 8.6 divided by item
8.3)
1.84
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”. Otherwise, a
figure for the estimated quarters of funding available must be included in item 8.7.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: The Company will continue to closely monitor the available funding and will adjust its
operating activities and exploration expenditure as required.
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it believe that they will
be successful?
Answer: The Company regularly assess opportunities and timing to raise capital to continue to
undertake its exploration activities. The Company and its Directors have a successful track
record of raising capital to ensure business continuity.
8.8.3 Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: Yes, refer 8.8.2
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1 This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2 This statement gives a true and fair view of the matters disclosed.
Date: 31 October 2025
Authorised by: The Board of Directors of Greenvale Energy Ltd
(Name of body or officer authorising release – see note 4)
Notes
1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that
wishes to disclose additional information over and above the minimum required under the Listing Rules is encouraged to do so.
2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows
apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by
ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4. If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the [name of
board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a disclosure committee,
you can insert here: “By the Disclosure Committee”.
5. If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out
as complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial records
of the entity have been properly maintained, that this report complies with the appropriate accounting standards and gives a true
and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a sound system of risk
management and internal control which is operating effectively.