Chemical assay confirms high-grade uranium
Released
Released
Announcement PDF
ASX Release 17 September 2025
CHEMICAL ASSAYS CONFIRM CONTINUOUS, HIGH-GRADE
URANIUM MINERALISATION AT OASIS
Highlights
Laboratory chemical analysis from diamond drill-hole 25GRV002, Greenvale’s second drillhole completed at the Oasis Uranium Project, has returned a significant high-grade uranium
intercept of:
8m @ 2,125ppm U3O8 from 84m down-hole, including:
5m @ 3,263ppm U3O8 from 84m.
The chemical assays correlate well with previously reported spectral gamma logs for hole
25GRV002, providing further evidence that radiometric disequilibrium is not likely to be an
issue at the Oasis deposit.
The mineralisation in drillhole 25GRV002 is structurally-controlled, being hosted in the same
chlorite-biotite schist shear zone as that identified in the first drill-hole 25GRV001.
Geological observations during drilling also identified minor outcrops of the same,
radiometrically anomalous granitic gneiss and chlorite-biotite schist along an approximately
north-south trend from the main mineralised area.
This provides strong indications that the mineralisation continues along strike, which will be
followed up in future work programs planned for the next quarter.
Greenvale Energy Limited ASX: GRV (“Greenvale” or “the Company”) is pleased to announce
chemical assay results from the second drill hole from its maiden drilling program at the Oasis
Uranium Project in Queensland, Australia. The chemical assays have confirmed a thick, highgrade uranium intercept, with further assays pending.
Although the assays are only from the second hole drilled in the program, the results from drillhole 25GRV002 provide strong indications that high-grade uranium starts near-surface and
continues down-dip. The geological host is confirmed as being the chlorite-biotite schist shear
zone, confirming structural controls on the mineralisation and further validating historical
interpretations of the deposit.
Greenvale CEO Alex Cheeseman said:
"The second set of chemical assay results further reinforces our confidence in the significant
potential of the Oasis Project, with the strong correlation between the spectral gamma logging
results and the high-grade chemical assays representing an excellent outcome.
“With the maiden drill program now completed, we are looking forward to receiving the remaining
assay results and data, which will provide vital inputs for the next stage of project development.
Our immediate focus will be the development of a geological model with concurrent planning of
a trenching program that will support the development of future drill targets.”
Interactive Investor Hub - Engage directly with the Company through our Investor hub, you can ask questions,
review comments and get direct access to the Company – follow the link greenvaleenergy.com.au/announcements
Greenvale Energy Limited
ABN 54000743555
Perth: Level 1, 1 Alvan St, Subiaco, 6008
W: greenvaleenergy.com
E: admin@greenvaleenergy.com.au
Brisbane: Suite 5-Level 12, 10 Market St, Brisbane 4000
Page | 1
Greenvale Energy Limited ASX Release
Drill Program Overview
Greenvale’s drill program commenced on 22 July 2025 with clearing access tracks and drill pads,
with drilling commencing on 27 July 2025. A total of 12 drill-holes were completed, with the
program comprising a combination of Reverse Circulation (RC) pre-collars and diamond core
tails. Drilling concluded at the end of drill-hole 25GRV012 on 8 September 2025, with a total of
1,804.2 drilled metres.
Over the period 14-15 August 2025, the first six drill-holes were logged using a spectral gamma
probe, which provides continuous down-hole measurements of natural radioactivity and
enables the estimation of equivalent uranium grades (eU₃O₈). All eU₃O₈ values will be confirmed
through chemical assay. The Company plans to complete spectral gamma logging for drill-holes
25GRV007-25GRV012 in the coming weeks.
A plan map of completed and pending drill-holes and cross-section reference is provided in
Figure 1, with the corresponding cross-section of the first three drill holes shown in Figure 2. Full
details of drill-holes completed can be seen in Appendix 1, with full exploration results provided
as Appendix 2 and Appendix 3.
Section line
Figure 1: Drill-hole locations for Greenvale’s maiden drill program at Oasis
Page | 2
Greenvale Energy Limited ASX Release
Figure 2: Cross-section through drill-holes 25GRV01 and 25GRV02 (with chemical assay),
25GRV03 (spectral gamma) and historical drill-hole OMRC001
Oasis Project Overview
The Oasis Uranium Project (EPM 27565) covers an area of 90km² in North Queensland, 250km
west of Townsville and 50km west of the town of Greenvale, entirely within the Lynd Station
pastoral lease.
Page | 3
Greenvale Energy Limited ASX Release
Uranium mineralisation is hosted in structurally controlled, deformed granite intrusives and
high-grade metamorphics, with the main Oasis structure striking north–south and dipping 60–70°
west.
Historical exploration by Esso in the 1970s, followed by Glengarry and Mega Uranium in the early2000’s established the geological framework and confirmed the presence of uranium
mineralisation.
Beyond the Oasis deposit itself, the Company has had early-stage success in following-up
regional radiometric targets, with rock chip results returning grades of up to 187.4ppm uranium 1.
With the Oasis deposit showing initial similarities to an Alaskite deposit, (uranium mineralisation
being concentrated in a shear zone and potentially related to intrusives), the Company is
encouraged by the potential to make a world-class Alaskite-style discovery, similar to the
Rossing deposit in Namibia.
Figure 3: Drilling operations at Oasis
Next Stage of Work
The Oasis drilling program has now been completed, with a total 1,804.2 metres drilled across
twelve holes. Processing of the drill core is ongoing, with the collection of detailed, systematic,
geological logging, geotechnical and structural measurements.
The immediate objective is to build comprehensive geological models for Oasis, which will be
utilised to plan the next phase of drilling. Assay results from the completed holes will be reported
as they become available.
Concurrent planning for the conduct of a trench sampling across the northern and southern
strike extensions of the deposit is ongoing, with work expected to commence in Q4.
The results from this drilling program will directly inform future exploration efforts.
1
Refer to ASX Announcement Maiden drill program makes strong progress at Oasis Uranium Project released 27 August 2025
Page | 4
Greenvale Energy Limited ASX Release
Authorised for release
This announcement has been approved for release by the Board of Directors.
For further information please contact
Alex Cheeseman
CEO
E: admin@greenvaleenergy.com.au
Nicholas Read
Read Corporate
E: nicholas@readcorporate.com.au
M: +61(0)419 929 046
About Greenvale Energy Limited
Greenvale is an ASX-listed exploration company with a portfolio of projects that will support a sustainable,
low-carbon future. The Company has early-stage uranium exploration projects in the Northern Territory,
the Oasis advanced-exploration project in Queensland and the Alpha Torbanite and Geothermal projects
in Queensland. The Company believes the best way to create long-term shareholder value is by investing
in exploration, to make discoveries and grow its resource-base.
Forward Looking Statements
This announcement may contain certain forward-looking statements and projections. Such forward
looking statements/projections are estimates for discussion purposes only and should not be relied upon.
Forward looking statements/projections are inherently uncertain and may therefore differ materially from
results ultimately achieved. The Company does not make any representations and provides no warranties
concerning the accuracy of the projections and disclaims any obligation to update or revise any forwardlooking statements/projects based on new information, future events or otherwise except to the extent
required by applicable laws. While the information contained in this report has been prepared in good faith,
neither the Company nor any of its directors, officers, agents, employees or advisors give any
representation or warranty, express or implied, as to the fairness, accuracy, completeness or correctness
of the information, opinions and conclusions contained in this announcement.
Competent Persons Statement
The information in this announcement that relates to exploration results is based on information compiled
by Dr. Simon Beams who is a Member of AusIMM (Member #107121), and a Member of the Australian
Institute of Geoscientists (Member #2689). Dr Beams is a full-time employee of Terra Search Pty Ltd and
has sufficient experience which is relevant to the style of mineralisation under consideration to qualify as
a Competent Person as defined in the 2012 Edition of the “Australian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves”. Dr Beams consents to the inclusion in the announcement
of the matters based on his information in the form and context in which it appears.
Page | 5
Greenvale Energy Limited ASX Release
Appendix 1 – Drillhole Collars
Hole ID
Easting
MGA Z55
Northing
MGA Z55
25GRV01
25GRV02
25GRV03
25GRV04
25GRV05
25GRV06
25GRV07
25GRV08
25GRV09
25GRV10
25GRV11
25GRV12
230701
230653
230593
230677
230698
230683
230688
230685
230682
230656
230540
230548
7918839
7918843
7918845
7918784
7918722
7918994
7919025
7919024
7918939
7918867
7918910
7918963
* = metres above sea level
RL
m.a.s.l.*
535
535
535
535
535
534
533
533
534
535
535
535
Mag
Azi
091°
092°
075°
090°
090°
090°
090°
049°
102°
091°
092°
092°
Inc
-61
-60
-80
-60
-60
-60
-60
-61
-61
-61
-70
-70
TD
Status
(m)
63.7 Drilled
112 Drilled
301 Drilled
103 Drilled
106 Drilled
99.6 Drilled
120 Drilled
127 Drilled
92.7 Drilled
99.6 Drilled
310 Drilled
271 Drilled
Page | 6
Greenvale Energy Limited ASX Release
Appendix 2 – Hole 25GRV02 Sample Laboratory Chemical Assay Results
From
To
U
U3O8
(m)
(m)
(ppm)
(ppm)
5420907
84
85
2755.39
3249.16
25GRV02
5420908
85
86
1281.54
1511.19
25GRV02
5420909
86
87
5876.5
6929.57
25GRV02
5420910
87
88
2785.98
3285.23
25GRV02
5420911
88
89
1135.06
1338.46
25GRV02
5420913
89
90
161.25
190.15
25GRV02
5420914
90
91
236.89
279.34
25GRV02
5420915
91
92
182.17
214.81
Hole ID
Samples
25GRV02
Page | 7
Greenvale Energy Limited ASX Release
Appendix 3 – JORC Code, 2012 Edition Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Sampling
techniques
•
•
•
•
Commentary
Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma sondes,
or handheld XRF instruments, etc). These examples should not be
taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation may be required, such as
where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
Drill samples were taken from the core section of diamond drill holes, pre-collared
with Reverse Circulation percussion drilling (RC). Triple tube HQ diamond drilling
was utilised, half core samples were collected on a 1m basis. Samples were
photographed, half-cored, and despatched to an external lab by an external
contractor.
Drilling
techniques
•
Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
9 core holes were drilled at -60°, 2 at 70° and 1 drilled at -80° from surface using
reverse circulation drilling until core point was reached. Then HQ drilling methods
employed, using triple tube chrome barrel and orientation tool. Hole depths ranged
from 66.33m to 309.85m.
Drill sample
recovery
•
Method of recording and assessing core and chip sample recoveries
and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain
of fine/coarse material.
Chip samples were collected at approximately 1m intervals. All chip samples were
geologically logged and photographed. All drill samples were collected and stored in
sample trays at Terra Search storage facility.
•
•
Core recovery was recorded for all drill runs and documented in a Geotechnical log
for each hole. The Triple Tube technology and procedure ensured core recoveries
were excellent throughout the hole. Core was marked up in metre lengths and
reconciled with drillers core blocks. An orientation line was drawn on the core.
Core sampling was undertaken by an experienced operator who ensured that half-
Page | 8
Greenvale Energy Limited ASX Release
Criteria
JORC Code explanation
Commentary
core was sawn up with one side consistently sent for analysis and the other side
was consistently retained for archive purposes. The orientation line was
consistently preserved.
An unbiased, consistent half-core section was submitted for the entire hole, based
on continuous 1m sampling. The entire half core section was crushed at the lab and
then split, the representative subsample was then finely ground, and a
representative unbiased sample was extracted for further analysis.
Logging
•
•
•
Sub-sampling
techniques and
sample
preparation
•
•
•
•
•
•
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate Mineral
Resource estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the relevant intersections logged.
Chip samples were collected every metre, geologically logged and photographed.
All core was collected, measured, geologically logged and photographed.
Geological logging was carried out by well-trained/experienced geologist and data
entered via a well-developed logging system designed to capture descriptive
geology, coded geology and quantifiable geology. All logs were checked for
consistency by the Principal Geologist. Data captured through Excel spread sheets
and Explorer 3 Relational Data Base Management System. A geotechnical log was
prepared.
Logging was qualitative in nature. A detailed log was described based on visual
observations. A comprehensive Core photograph catalogue was completed with full
core dry, full core wet and half core wet photos taken of all cores.
The entire length of all drill holes has been geologically logged.
Drill holes 25GRV01, 25GRV02, 25GRV03, 25GRV04, 25GRV05 and 25GRV06 have
been geophysically logged with the following suite of tools run including Density,
Calliper, Verticality/Deviation, Gamma, Spectral Gamma and ATV Acoustic Scanner.
The remaining drill holes will be geophysically logged at the end of the drill program.
The calibration of the geophysical tools was conducted by the geophysical
logging company engaged in the project at the time.
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material
Half-core samples were sawn up on a diamond saw on a metre basis at Terra
Search facility in Townsville, QLD and submitted to Intertek Adelaide for
preparation and analysis.
The above techniques are of a high quality, and appropriate for the nature of
mineralisation anticipated.
Radiometric data is collected every metre of the RC and core holes to be checked
and correlated against any lab data for U, Th, K. Similarly portable XRF (PXRF) data
is collected on a 1m basis from RC bulk sample and from 3m drill cuttings (sludge
samples) from the core sections. The latter sampling provides a qualitative check
on U, Th, K contents on a broader 3m scale. In addition, downhole radiometric
Page | 9
Greenvale Energy Limited ASX Release
Criteria
JORC Code explanation
being sampled.
Commentary
probe data has been collected which is providing additional validation of the
appropriateness of sample size.
The standard 2kg -5kg sample is more than appropriate for the grainsize of the rocktypes and the sub-microscopic uranium minerals and sulphide grainsize. The
sample sizes are considered to be appropriate to represent the style of the
mineralisation, the thickness and consistency of the intersections.
Quality of assay
data and
laboratory tests
•
•
•
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or
total.
For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
Preparation of rock chip and core samples involves crushing splitting and grinding
at Intertek/Genalysis lab Townsville. Higher grade uranium assays are analysed at
Intertek in Adelaide. The total amount of economic metals and pathfinder elements
tied up in sulphides and oxides such as U,Th,Cu, Pb, Zn, Ag, As, Mo, Bi, S is
captured by the 4-acid digest method ICP finish. Mass spectrometry (MS) ensures
low level detection and REE are also captured. This is regarded as a total digest
method and is checked against QA-QC procedures which also employ these total
techniques. Major elements which are present in silicates, such as K, Ca, Fe, Ti, Al,
Mg are also digested by the 4 acid digest Total method.
The techniques are entirely appropriate for a schistose, micaceous mineralised
structure such as Oasis, hosted in primarily a granitic / metamorphic terrane.
The economically important elements in these deposits are contained in both
resistate minerals and sulphides which are almost entirely liberated by 4 acid
digest, all gold is determined with a classic fire assay. Samples were assayed for
gold using the 50g fire assay method.
Downhole probing was completed by a spectral gamma tool which is a down-hole
logging device that measures natural radiation in the rocks to help identify their
mineral content. By analysing the energy spectrum of gamma rays, the tool can
distinguish between key elements such as uranium, potassium and thorium, but
still only provides an equivalent uranium value.
This method provides a reliable way to estimate uranium content in drill holes,
which should then be confirmed by chemical assays, and may give early
indications of mineralisation.
Radiometric disequilibrium occurs when the uranium parent isotope is gained or
lost during geological processes, disrupting the balance between parent and
daughter isotopes. Historical work at Oasis indicates this is not a significant issue,
with good correlation reported between chemical and radiometric grades. Recent
drilling results from holes 25GRV01 and 25GRV02 are providing good confirmation
that this is true.
Page | 10
Greenvale Energy Limited ASX Release
Criteria
JORC Code explanation
Commentary
QAQC samples are monitored on a batch‐by‐batch basis, Terra Search has well
established sampling protocols including blanks (both coarse & pulped), certified
reference material (CRM standards) Terra Search quality control included
determinations on certified OREAS samples interspersed at regular intervals
through the sample suite of the commercial laboratory batch.
Standards are checked on receipt of results. Within the drill core results that have
been returned to date are found to be within acceptable tolerances. Laboratory
assay results for these quality control samples are within 5% of accepted values.
Verification of
sampling and
assaying
•
•
•
•
The verification of significant intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
Sample intervals to be assigned a unique sample identification number prior to
sample despatch.
Significant intersections are verified by Terra Search Pty Ltd, independent
geological consultants who geologically supervised the drilling. Validation is
checked by comparing assay results with logged mineralogical intervals that are
diagnostic of the mineralization e.g. chlorite schist, with quartz veins, minor
sulphide and accompanied by high radiometric counts. These intervals have a
close correlation historically with high U grades.
Although holes have not been directly twinned, the holes drilled by GRV to date
pass close enough to earlier drill holes, logged geology and radiometric anomalism
is entirely consistent with previous results. Lab assay results from recent drilling
are awaited.
Data is collected by qualified geologists and experienced field technicians and
entered into Excel spreadsheets. Data is imported into database tables from the
Excel spreadsheets with validation checks set on different fields. Data is then
checked thoroughly by the Principal Geologist for errors. Accuracy of drilling and
rock chip data is then validated when imported into MapInfo.
Location and analysis data are then collated into a single Excel spreadsheet.
Data is stored on servers in The Company’s office (GRV) and also with Terra Search
Consultants. There are regular backups and archival copies of the database made.
Data is validated by long-standing procedures within Excel Spreadsheets and
Explorer 3 data base and spatially validated within MapInfo GIS.
No adjustments are made to the Commercial lab assay data. Data is imported into
the database in its original raw format.
Page | 11
Greenvale Energy Limited ASX Release
Criteria
JORC Code explanation
Location of data
points
•
•
•
Data spacing
and distribution
•
•
•
Commentary
Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations used
in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Drill collar has been determined using DGPS with location reported in MGA Zone
55. Expected location accuracy of +/- 0.5m
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
Whether sample compositing has been applied.
At the Oasis prospect, previous drilling program drill spacing between section lines
is tight in the order of 25m or so spaced diamond core, RC percussion, and open
hole percussion holes. Holes have been drilled in fences along section lines with
collars generally 50m or less apart. Variously positioned over an area of 200m x
200m. Down hole sample spacing is in the order of 1m which is appropriate for the
style of the deposit and sampling procedures.
Down hole surveys were conducted on all holes using a Reflex Gyro. Surveys were
generally taken every 30m downhole, dip, magnetic azimuth were recorded
No sample compositing has been applied. All GRV sampling is of 1m downhole
samples of half core.
Orientation of
data in relation
to geological
structure
•
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
Geological control of the Oasis structure containing uranium mineralisation is very
well established from previous historical work dating back to the 1970’s with Esso,
followed up in 2008 with modern exploration by Glengarry and Mega Uranium. The
uraniferous Oasis structure is broadly north – south striking and dipping 60 to 70
degrees to the west. This structural attitude has been confirmed by 2025 Greenvale
drilling. The orientation of the 2025 drilling is entirely appropriate for this structure,
and the recent holes are intersecting the mineralisation at predicted intervals and
at right angles to strike. True thickness of the structure will be determined when all
the appropriate geochemical and geological, structural data is assembled. No
sampling bias has been introduced by the drilling direction.
Sample security
•
The measures taken to ensure sample security.
Chain of custody was managed by Terra Search Pty Ltd. Core trays were freighted in
sealed & strapped pallets from site where they were dispatched by Terra Search.
The core was processed and sawn in Terra Search’s Townsville facilities and halfcore samples were delivered by Terra Search to Intertek/Genalysis laboratory
Townsville lab.
Audits or
reviews
•
The results of any audits or reviews of sampling techniques and data.
No audits have been conducted.
•
Page | 12
Greenvale Energy Limited ASX Release
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Mineral
tenement and
land tenure
status
•
•
Exploration
done by other
parties
•
Commentary
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
EPM27565 was granted to Remlain Pty Ltd in Feb 2021. In Jan 2025, the mineral
permit was acquired by Greenvale Utilities which is a 100% subsidiary of Greenvale
Energy Ltd. The current 5-year term expires on 23rd Feb 2027.
Acknowledgment and appraisal of exploration by other parties.
Previous exploration summary reported in ASX releases dated 13th January 2025.
Historical exploration summary reported in ASX releases dated 13th Jan 2025:
The Oasis deposit and associated regional uranium anomalism are contained
within EPM 27565 which covers 53 subblocks over an area of 90 km2 and located
250 km west of Townsville and 50 km west of Greenvale in FNQ. The project area is
located entirely within the Lynd Station pastoral land.
Previous exploration at Oasis has been conducted by multiple companies: notably
Anglo American 1973-1974; Esso 1977-1979; Glengarry 2005-2006; Mega
Georgetown 2007-2010; Maverick Exploration 2021-2024. Major activities include
Airborne radiometrics, aero-magnetics, geological prospecting, geological
mapping, trenching, soil sampling, auger drilling, track etch surveying, ground
magnetics, ground radiometric surveying, diamond core , open hole percussion
and reverse circulation drilling.
Any previous exploration results for work completed by Greenvale is available on
the Company website.
Geology
•
Deposit type, geological setting and style of mineralisation.
Structurally controlled uranium mineralization hosted in complexly deformed
granite dominated intrusives and high grade metamorphics
Drill hole
Information
•
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
Provided in the body of this report as Appendix 1.
Page | 13
Greenvale Energy Limited ASX Release
Criteria
Data
aggregation
methods
JORC Code explanation
•
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from the
understanding of the report, the Competent Person should clearly
explain why this is the case.
•
In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used for
such aggregation should b
Share your feedback