ALPHA TORBANITE PROJECT – UPDATE
TEST PROGRAM 5 DELIVERS POSITIVE RESULTS, WITH
STRONG BITUMEN RECOVERY AND IMPROVED
VISCOSITY
Key Points:
•
Liquefaction Test Program 5 successfully completed by The University of
Jordan (UofJ).
•
Test Program 5 was aimed at improving the viscosity of the final bitumen
product to determine the potential to deliver a premium-grade C170 product
from the Alpha Project.
•
Results indicate that, with further fine-tuning of experimental parameters, a
viscosity in the range of C170 asphalt could be achieved with Alpha ore.
Greenvale Energy Limited (ASX: GRV, “Greenvale” or “the Company”) is pleased to report
positive outcomes from Liquefaction Test Program 5 for its 100%-owned Alpha Torbanite
Project in Queensland.
Liquefaction Test Program 5 was undertaken by the University of Jordan (UofJ), a worldclass institution with significant expertise in geotechnical/chemical engineering,
liquefaction studies and bituminous products.
Test Program 5 was designed to examine the issues raised in Test Program 4 (see ASX
Announcement 26 June 2024), which found that, while the shale extract from Alpha could
be used for manufacturing standard or modified types of bitumen, it did not meet the
stringent specifications required to deliver a premium C170 bitumen product. The main
issues identified were the viscosity of product and the lack of elasticity.
Test Program 5 – Overview
Test Program 5 comprised a small, laboratory-scale trial using a blend of the three
formations that make up the Alpha orebody, Cannelite L1, Torbanite LT and Cannelite L2
(L1, LT and L2).
The test program took the blended core samples, varied the reaction conditions of
temperature and pressure to maximise the asphaltene yield, and then used different
catalysts to enhance the quality of the asphaltene for its viscosity and penetration.
A wide range of experimental variables was explored to determine the ideal conditions
for maximising both the quantity and quality of bitumen produced.
REGISTERED OFFICE:
Level 6, Suite 606 10 Market Street, Brisbane, Queensland 4000
+61 7 3212 6299 | admin@greenvaleenergy.com.au | www.greenvaleenergy.com.au
ABN
54
000
743
555
These variables included the effect of pressure variations, which were tested at 5, 9, and
up to 10.7 MPa starting hydrogen overpressure. In addition, the influence of temperature
was carefully examined at 400°C, 425°C and 450°C.
The role of catalysts, or the lack thereof, was another significant factor investigated to
assess their impact on the liquefaction process and the resulting bitumen yield.
The test program determined that the optimal conditions to achieve maximum yield of
bitumen materials, including asphaltenes and pre-asphaltenes, exceeding 30 wt% was at
a temperature of 400°C and the highest pressure. Introducing catalysts (specifically iron
and tin) enhanced the conversion process, increasing pre-asphaltene content under
optimal conditions.
Product characteristics varied with changes in experimental conditions; asphaltene
content remained consistently high, and the density of bitumen materials showed minimal
variation. Viscosity increased with pressure, though measurements were limited by
sample size and solvent dilution. Due to sample sizes being too small the penetration tests
couldn’t be carried out and these tests will now be conducted when larger bulk samples
are produced.
According to UofJ, the results indicate that, with further experimental investigation,
including fine-tuning experimental parameters – particularly pressure, temperature, and
catalyst selection – it could achieve a viscosity in the range of C170 asphalt.
UofJ has recommended producing bulk samples under varied reaction conditions after
catalyst optimisation to facilitate a more comprehensive study of bitumen properties,
specifically viscosity.
The Greenvale Board will fully evaluate the full results of Test Program Five to determine
the next steps for the Alpha Project.
Management Comment
Greenvale Chief Executive Officer Mark Turner said: “These are encouraging results from
small-scale lab testing that confirm the potential to achieve good recovery of bitumen
products with improved viscosity.
“We will now work with the University of Jordan to determine the next steps, which may
include progressing to a bulk testwork program.”
Authorised for Release
This announcement has been approved by the Board for release.
For further information please contact:
Investors: Mark Turner, CEO and Executive Director
Media: Nicholas Read
Engage and Contribute: Investor Hub
GREENVALE
ENERGY
LIMITED
P +61 (0) 459 519 999
P +61 (0) 419 929 046
2
Greenvale Energy Interactive Investor Hub
Engage with Greenvale directly by asking questions, watching video summaries and
seeing what other shareholders have to say about this, as well as past announcements.
Join our Investor Hub
Visit http://investorhub.greenvaleenergy.com.au/welcome
Competent Person’s Statement:
The information in this report that relates to Exploration Results (Liquefaction Testwork 5 and
yield data) is based on information reviewed by David Cavanagh, a Competent Person who is
a Member of The Australasian Institute of Mining and Metallurgy AusIMM Member number
112318. David Cavanagh is a full-time employee of Core Resources.
David Cavanagh has sufficient experience that is relevant to the style of mineralisation and
type of deposit under consideration and to the activity being undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’.
David Cavanagh consents to the inclusion in the report of the matters based on his information
in the form and context in which it appears.
GREENVALE
ENERGY
LIMITED
3
Appendix 1: Liquefaction Test Program 5 Results
Trial number
Sample name
Blend (no catalyst)
Catalyst
Reaction temperature °C
Initial
Gas Pressure MPa
After
Maximum
Conversion yield (wt%)
Gas yield wt%
Hexane (wt %)
Soluble wt%
Toluene (wt %)
Soluble wt%
THF (wt %)
Soluble wt%
Carrier
7.1
17.0
6.0
69.1
8.3
48.4
2.0
10.4
7.8
0.7
1.1
5.0
5.0
8.7
9.4
8.9
10.0
18.0
6.9
7.9
12.1
14.1
17.0
20.5
20.3
26.4
6.5
1.2
1.0
4.5
3.9
6.0
8.1
7.6
8.4
3.6
12.8
14.8
28.0
27.6
32.0
32.9
34.0
2.3
1.0
0.8
0.2
0.2
0.1
0.0
0.2
2.2
3.0
9.8
11.1
13.0
14.7
16.5
15.3
0.1
0.0
1.0
0.8
1.0
2.0
1.4
0.7
0
1
2
3
4
5
6
7
8
GM 21
GM 21
GM 21
GM 21
GM 21
GM 21
GM 21
GM 21
" Blank"
-
33.3
8.2
11.1
15.1
15.9
17.8
16.3
17.4
17.5
9
GM 14
-
10.7
26.0
9.3
49.0
18.3
1.0
29.2
1.8
10
GM 14
Fe2O3
9.8
24.0
8.8
56.6
24.3
0.2
30.0
2.1
11
GM 14
Sn
10.2
24.0
8.6
23.5
0.6
28.1
5.2
12
13
14
15
16
17
18
19
GM 21
GM 21
GM 21
GM 21
GM 21
GM 21
GM 21
GM 21
-
1.3
5.4
5.1
8.5
9.0
9.9
10.1
9.2
12.0
18.4
17.7
22.2
22.0
26.7
26.0
24.0
1.2
4.0
3.6
6.1
7.5
9.3
8.5
7.7
57.4
17.0
32.9
33.1
36.1
37.6
45.8
46.1
51.3
13.4
22.7
19.7
20.4
20.5
21.6
21.6
27.6
0.2
0.3
0.1
1.4
0.1
0.1
0.1
0.2
4.7
10.1
13.4
15.3
16.3
23.5
22.9
23.2
0.1
0.3
0.1
1.4
0.7
0.9
1.2
0.7
20
GM 14
-
9.1
28.0
7.5
58.1
37.7
0.8
20.3
0.2
GREENVALE
ENERGY
LIMITED
400
425
450
4
Appendix 2: Summary of calorific value of residues and asphaltene (SARA), density and viscosity of
bitumen
Reaction conditions
Temperature (°C)
Pressure (MPa)
Asphaltenes (wt%) ASTM D3279
5
94.8
0.878
23.9
11
9
83.2
0.860
22.5
139
Max.
87.6
0.845
21.0
426
5
89.9
0.892
23.7
9
9
94.6
0.875
22.3
221
Max.
91.3
0.873
20.8
494
400
425
Bitumen density g/mL at 25 C Calorific value (MJ/Kg) ASTM D240
Viscosity at 60 C (Pa.s)
400oC 5 Mpa results based on average of trials 3&4 (sample GM-21)
400oC 9 Mpa results based on average of trials 7&8 (sample GM-21)
400oC 9 Mpa results based on average of trial 9 (10.7 MPa starting overpressure) (sample GM-14)
425oC 5 Mpa results based on average of trials 13&14 (sample GM-21)
425oC 9 Mpa results based on average of trials 15&16 (sample GM-21)
425oC 9 Mpa results based on average of trial 17&18 (10 MPa starting overpressure) (sample GM-21)
GREENVALE
ENERGY
LIMITED
5
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Sampling techniques
Nature and quality of sampling (e.g., cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such as
downhole gamma sondes, or handheld XRF instruments,
etc.). These examples should not be taken as limiting the
broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done; this
would be relatively simple (e.g., ‘reverse circulation drilling
was used to obtain 1 m sample from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases, more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.,
submarine nodules) may warrant disclosure of detailed
information.
Drilling techniques
GREENVALE
Commentary
The samples refer to in this announcement were taken from the 2021 partly
cored (4C – 100mm diameter) hole drilling program on a nominal 250 x 250m
grid for the purpose of obtaining torbanite and cannel coal quality samples
from the Upper and Lower seams.
Refer to ASX Announcement date – 9 March 2022.
Drill type (e.g., core, reverse circulation, open-hole hammer, Not applicable to this announcement
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g.,
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit, or other type, whether core is
oriented and if so, by what method, etc.).
ENERGY
LIMITED
6
Criteria
JORC Code explanation
Drill sample recovery
Method of recording and assessing core and chip sample Not applicable to this announcement
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
Logging
Whether core and chip samples have been geologically and Not applicable to this announcement
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core
(or costean, channel, etc.) photography.
The total length and percentage of the relevant intersections
logged.
GREENVALE
ENERGY
LIMITED
Commentary
7
Criteria
JORC Code explanation
Sub-sampling techniques
If core, whether cut or sawn and whether quarter, half or all 8 Core samples from different holes in total have been prepared and
held as sub 200 micron by ply.
core taken.
If non-core, whether riffled, tube sampled, rotary split, etc. Subsamples have been cut from the separate sub 200 micron samples of each
ply which have been held in refrigeration for test program 5 including samples
and whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness to University of Jordan. Only 2 core samples were used as part of test program
5 GM 14 and GM 21.
of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is representative
of the in situ material collected, including for instance results
for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
and sample preparation
Quality of assay data and
laboratory tests
Verification of sampling
and assaying
Location of data points
GREENVALE
Commentary
The nature, quality and appropriateness of the assaying and Test Program 5 involved repeating the tests conducted on core material in test
laboratory procedures used and whether the technique is program 4 but only for the blends of L1, LT, L2
considered partial or total.
A detailed range of tests have been performed to understand the core material
For geophysical tools, spectrometers, handheld XRF and liquefaction tests using oil and water-based carriers have been conducted
instruments, etc., the parameters used in determining the on the subsamples using standardised test procedures.
analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
Refer to ASX Announcement date – 13 March 2024.
Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision
have been established.
The verification of significant intersections by either Torbanite and cannel coal quality results were verified by experienced SRK
independent or alternative company personnel.
personnel before inclusion in the geological model and resource estimate and
The use of twinned holes.
representative samples provided.
Documentation of primary data, data entry procedures, data Core samples from 8 wells has now been used from Greenvale storage sites
verification, data storage (physical and electronic) protocols. and split by Greenvale contractors, prepared as sub 200 micron for each ply
Discuss any adjustment to assay data.
and held in closed labelled plastic bags and stored in a freezer.
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings and
other locations used in Mineral Resource estimation.
ENERGY
LIMITED
The wells chosen are 9, 14, 21, 28 for the initial work and further
supplemented by wells 19, 128, 137, 138.
8
Criteria
JORC Code explanation
Specification of the grid system used.
Quality and adequacy of topographic control.
Commentary
Well
Easting
Northing
9
482757
7333602
14
482872
7333231
21
483334
7332843
28
483813
7332150
19
482251
7332674
128
484816
7331276
137
480843
7332637
138
481532
7333468
There is high confidence in the location of data points associated with this
announcement.
Refer to ASX Announcement date – 27 December 2023.
Data spacing and
Data spacing for reporting of Exploration Results.
The wells were chosen to span the resource and intersect both seams and all 4
Whether the data spacing, and distribution is sufficient to ply.
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
distribution
Orientation of data in
relation to geological
structure
Sample security
GREENVALE
Whether the orientation of sampling achieves unbiased All drill holes were drilled at 90° to the surface and are assumed to be vertical.
sampling of possible structures and the extent to which this is Downhole verticality survey is available for all drill holes.
known, considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed and
reported if material.
The measures taken to ensure sample security.
ENERGY
LIMITED
Samples have been stored in dedicated freezers from the time the sample was
acquired.
9
Criteria
JORC Code explanation
Commentary
Sample transfer documents have been provided by the core holding laboratories
and have been prepared to sub 200 microns and stored separately in labelled
plastic bags in a Freezer.
Audits or reviews
GREENVALE
The results of any audits or reviews of sampling techniques
and data.
ENERGY
LIMITED
No audits have been undertaken.
10
Section 2 Reporting of Exploration Results
(Criteria listed in section 1 also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral tenement and land Type, reference name/number, location and ownership MDL 330 is held by Alpha Resources Pty Ltd, a subsidiary of Greenvale Energy
tenure status
including agreements or material issues with third parties Limited. MDL 330 was first granted on 1 February 2002. An application for a
such as joint ventures, partnerships, overriding royalties, renewal for an additional 5-year term was submitted in July 2021 and approved
native title interests, historical sites, wilderness or national in July 2022. The current 5-year term expires on 31 January 2027.
park and environmental settings.
MDL 330 covers an area of 1,904.5 ha.
The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to
operate in the area.
Exploration done by other
Acknowledgment and appraisal of exploration by other
parties.
Refer to ASX Announcement – 9 March 2022 and 13 November 2023.
parties
Geology
Deposit type, geological setting and style of mineralisation.
The Alpha deposit lies within the axis of the Glen Avon Syncline, a southwest
plunging fold structure that occurs on the eastern flank of the Galilee Basin.
The deposit is part of the Permian Colinlea Sandstone, which contains 150 m of
cross-bedded sandstones with minor conglomerates, siltstones and
mudstones.
The geology of the deposit consists of an Upper and Lower seam of cannel coal
with a torbanite lens present in the lower seam.
The Colinlea Sandstone is thought to be a lower delta plain deposit with the
coal deposited in swamps and shallow lakes in this near shore environment.
The torbanite is thought to have been deposited from algae in a lacustrine
environment when water entering the system held little sediment or organic
material.
Drill hole Information
A summary of all information material to the understanding Not applicable to this announcement
of the exploration results including a tabulation of the
following information for all Material drill holes:
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
dip and azimuth of the hole
GREENVALE
ENERGY
LIMITED
11
Criteria
JORC Code explanation
Commentary
downhole length and interception depth
hole length.
If the exclusion of this information is justified on the basis that
the information is not Material and this exclusion does not
detract from the understanding of the report, the Competent
Person should clearly explain why this is the case.
Data aggregation methods
In reporting Exploration Results, weighting averaging Liquefaction tests are being conducted using samples from each seam, and
techniques, maximum and/or minimum grade truncations blend samples representing the seams within a given borehole. The blend
(e.g. cutting of high grades) and cut-off grades are usually samples are prepared in portions relative to the thickness of each seam within
Material and should be stated.
a specific borehole.
Where aggregate intercepts incorporate short lengths of
high-grade results and longer lengths of low-grade results,
the procedure used for such aggregation should be stated and
some typical examples of such aggregations should be shown
in detail.
The assumptions used for any reporting of metal equivalent
values should be clearly stated.
Relationship between
These relationships are particularly important in the reporting Not applicable to the announcement
of Exploration Results.
If the geometry of the mineralisation with respect to the drill
hole angle is known, its nature should be reported.
If it is not known and only the downhole lengths are reported,
there should be a clear statement to this effect (e.g. ‘down
hole length, true width not known’).
mineralisation widths and
intercept lengths
Diagrams
Appropriate maps and sections (with scales) and tabulations Not applicable to the announcement
of intercepts should be included for any significant discovery
being reported These should include, but not be limited to a
plan view of drill hole collar locations and appropriate
sectional views.
Balanced reporting
Where comprehensive reporting of all Exploration Results is Not applicable to the announcement
not practicable, representative reporting of both low and high
GREENVALE
ENERGY
LIMITED
12
Criteria
JORC Code explanation
Commentary
grades and/or widths should be practiced avoiding misleading
reporting of Exploration Results.
Other substantive
exploration data
Further work
GREENVALE
Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological Tests have been undertaken at 400C, 425C, 450C and 5, 9 and up to 10.7 MPa
observations; geophysical survey results; geochemical survey starting hydrogen overpressure. Sample sizes are approximately 10 grams and
results; bulk samples – size and method of treatment; 2 wt % catalyst also added, in 30 grams of carrier oil with residence time of 60
metallurgical test results; bulk density, groundwater, minutes generally (after target temperature reached). Full tables of test program
geotechnical and rock characteristics; potential deleterious or 5 results are shown in Appendix 1 & 2
contaminating substances.
Also Refer to ASX Announcement – 17 May 2023
The nature and scale of planned further work (e.g. tests for Bulk testwork is being considered to further optimize results and measure
lateral extensions or depth extensions or large-scale step-out bitumen properties.
drilling).
.
Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future
drilling areas, provided this information is not commercially
sensitive.
ENERGY
LIMITED
13
Share your feedback
Discover