Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
30 July 2024
JUNE 2024 QUARTERLY REPORT
STRATEGIC ADJUSTMENTS AT ALPHA AND GEORGINA
BRING NEW OPPORTUNITIES FOR GROWTH
Highlights
Alpha Torbanite Project, QLD (100%-owned):
•
Product analysis by Technix, Greenvale’s bituminous product advisor,
indicates that additional work is required to achieve a premium C170
bitumen product certification.
•
The project parameters are being re-evaluated to address these issues and conserve
cash, with the Scoping Study suspended while this work is completed.
•
The University of Jordan, which completed the highly successful Test Program 3,
has been re-engaged to commence Test Program 5.
West Walker Helium Project, NT: for the Ambient Noise Tom
•
Farm-In Agreement completed to acquire a 75% interest in EP145, with Ministerial
Consent received.
•
$100,000 co-funding grant awarded by the Northern Territory Government for the
upcoming 2D seismic survey.
•
Preparations advanced to commence the Wild Horse 2D seismic program, targeting
high-potential helium, hydrogen, and hydrocarbon resources. The exact timetable
can be set once all relevant approvals are received
•
6-month extension of EP145 applied for with the NT Government.
Georgina Basin IOCG Project, NT (20%-owned): continued for the Ambient Noise Tom
•
Sale of the remaining 20% interest in the Georgina Basin IOCG Project to Astute
Metals completed, with a further 5 million ASE shares received and potential for an
additional 5 million shares based on project milestones
•
Greenvale divested its shareholding in Astute subsequent to quarter-end, boosting
its cash position by $1,530,000.
Corporate:
•
Experienced executive Mr John W Barr appointed as Non-Executive Director, further
strengthening the Greenvale board.
•
18.5 million fully-paid ordinary shares issued to Pioneer Resource Partners, LLC,
reducing the loan facility by $1 million.
•
After the end of the quarter the 2023 R&D grant was received amounting to $0.83 million.
The 2024 grant will be applied for shortly.
GREENVALE
ENERGY
LIMITED
1
Projects
Alpha Project, Queensland
Background
The Company’s 100%-owned Alpha Torbanite Project is located approximately 50km south of
the town of Alpha in Central Queensland. The Alpha torbanite deposit consists of two seams,
an upper seam of mostly lower-grade mineralisation with an average thickness of 1.12m and
a lower seam containing lenses of torbanite up to 1.9m thick. The Project has been subjected
to extensive exploration and laboratory testing since its initial discovery in 1939.
During 2019, SRK Consulting Pty Ltd (“SRK”) was engaged to reassess the project’s
commercialisation strategy. SRK’s report set out a potential new development strategy based
on the production of a diversified suite of value-added products. SRK noted that, in contrast
with typical oil shale deposits, the Alpha torbanite deposit is exceptionally high-grade,
containing up to 650 litres of hydrocarbons per tonne of torbanite, and can produce high-value
bitumen products.
The upper and lower bituminous shales also produce similar products, albeit at lower yields of
110-140 litres per tonne. Additionally, the torbanite and bituminous shales can deliver highquality value-added products through appropriate investment in processing infrastructure.
SRK was engaged to undertake a staged work program to assist in evaluating the project's
commercial viability.
Activities during the June Quarter
During the Quarter, Greenvale completed most of the key workstreams required to deliver
the Scoping Study. However, after receiving the results of product identification and
certification test work from Technix, the Company’s bituminous product advisor, the decision
was made to suspend the Scoping Study to address the issues identified by Technix.
The test work completed by Technix was designed to determine the potential of the Alpha
Project to produce a premium-grade C170 bitumen product. Analysis of bulk samples from
Alpha indicated that, while the shale extract could be used for manufacturing standard or
modified types of bitumen, it did not meet the stringent specifications required for the premium
C170 bitumen product.
The outcomes of Technix’s work indicate that additional work is required to increase the
viscosity and elasticity of the final product to meet the premium-grade standards.
The decision to pause the Scoping Study will allow Greenvale to conserve cash, re-evaluate
key aspects of the proposed development pathway and focus on addressing the issues
identified by Technix in a cost effective manner.
Subsequent to quarter-end, the Company announced that it has re-engaged the University of
Jordan to commence Test Program 5 (see ASX announcement, 17 July 2024). The University
of Jordan is a world-class institution with significant expertise in geotechnical/chemical
engineering, liquefaction studies and bituminous products and previously undertook the highly
successful Test Program 3.
Test Program 5 is designed to be a lab-scale trial using a blend of the three ply’s, Cannelite
L1, Torbanite LT and Cannelite L2 (L1, LT and L2).
The aim is to take the blended core samples, vary the reaction conditions of temperature and
GREENVALE
ENERGY
LIMITED
2
pressure to maximise the asphaltene yield, and then using different catalysts to enhance the
quality of the asphaltene for its viscosity and penetration.
Significant outcomes from Test Program 5 will be reported to the market as they become
available.
West Walker Helium Project, Northern Territory
Background
Greenvale Energy holds a 75% interest in EP145 in the Amadeus Basin. The Amadeus Basin
is considered one of the most prospective onshore areas in the Northern Territory for both
conventional and unconventional oil and gas and hosts the producing Mereenie and Palm
Valley fields.
The Basin has some of the highest concentrations of helium globally, as well as confirmed
hydrogen accumulations. Successful helium wells have been drilled along the margins of the
Amadeus Basin at Mt Kitty 1 and Magee 1. The existing pipeline infrastructure to the Australian
East Coast provides an opportunity for early commercialisation.
EP145 contains the West Walker anticline, which hosts Ordovician through to Neoproterozoic
stratigraphy with prospective targets at multiple levels over 30km in length. The significance of
the geology is its proximity to the nearby Mereenie oil and gas field, which produce from the
Ordovician Pacoota Sandstone unit.
Two wells have been drilled on the anticline. The first, West Walker-1, tested the western end
of the feature. Drilled on sparse seismic data in 1982, it flowed wet gas to the surface at a rate
of 3.5MMscf/d from the Pacoota Sandstone, the main producing reservoir in the Mereenie and
Palm Valley Fields. A follow-up well, Tent Hill-1, was drilled in 1984 to the south-east on the
same anticline. Oil was observed seeping from cores, but the well was not tested.
Reprocessing of vintage seismic data shows that both wells were drilled off-structure; West
Walker-1 was drilled downdip of the main closure, and Tent Hill-1 did not penetrate the target
sandstone within closure.
More recent technical work has highlighted the potential for helium and hydrogen in addition
to hydrocarbon resources. As a result, Mosman Oil & Gas reported the following "Best
Estimate" Prospective Resource Estimate for EP145 in October 2022: 440 billion cubic feet of
total gas, including an estimated 26.4 billion cubic feet of helium and 26.4 billion cubic feet of
hydrogen.
Activities during the June Quarter
During the Quarter, Greenvale successfully completed the Farm-In Agreement to acquire a
75% interest in EP145. This milestone was achieved following the receipt of Ministerial
Consent on 29 April 2024, satisfying all conditions of the agreement with Mosman Oil and Gas.
The completion of this transaction allowed Greenvale to fully assume operational control and
initiate plans for the Year 3 Work Program.
The Company has been awarded a $100,000 co-funding grant from the Northern Territory
Government. This grant was part of Round 17 of the NTGS Geophysics and Drilling
Collaborations program. The funding is earmarked for an initial seismic line in EP145, which
forms a key part of the upcoming 2D seismic survey scheduled to commence in August.
This survey, named the Wild Horse 2D seismic program, aims to gather vital data to help map
the geological structures and de-risk future exploration activities targeting helium, hydrogen,
GREENVALE
ENERGY
LIMITED
3
and hydrocarbon resources.
The seismic survey is designed to image basement reflectors thought to be as deep as 5km
below sea level, which is essential for identifying prospective targets and guiding drilling efforts.
This data acquisition is expected to provide a high-quality dataset that will significantly enhance
Greenvale’s ability to explore the ultra-high-grade helium potential of the EP145 permit.
The Company been advised that, due to the upcoming Northern Territory elections, the NT
Government will go in caretaker mode from 1 August 2024 until the election is completed and
the new Government is sworn in by the Administrator. During this period, the Government
assumes a “caretaker” role and avoids making major decisions which could potentially impact
approval decisions for Environmental Management Plans under assessment.
Greenvale has therefore applied to the NT Government to extend the current permit year
commitments by six months to allow for the completion of the planned 2D seismic and to keep
the permit in good standing.
While the upcoming Wild Horse 2D seismic program at the West Walker Project is scheduled
to commence in the September Quarter, there is potential for it to be delayed due to the
upcoming NT elections.
This phase of exploration involves using advanced seismic technology to image the geological
structures beneath the Earth's surface. The program parameters have been meticulously
designed to optimally image the basement reflectors, which are thought to lie as deep as 5km
below sea level.
By accurately mapping these deep structures, Greenvale aims to de-risk future exploration
activities targeting the Neoproterozoic sediments and basement structures.
Utilising 2D seismic technology provides several key benefits for the West Walker Project. This
method involves sending sound waves into the ground and recording the waves that are
reflected back to the surface. These reflections help create a detailed image of the subsurface
geology.
For Greenvale, the primary advantage of this approach is the ability to identify and map
potential hydrocarbon traps and other geological features with greater precision. This highquality dataset will be invaluable for generating prospective targets, evaluating resources, and
guiding the identification of valid drill targets in EP145.
GREENVALE
ENERGY
LIMITED
4
Figure 1: West Walker Helium Project Proposed 2D Seismic Survey lines
Georgina Basin IOCG Project, Northern Territory
Background
The Georgina Basin Project is owned by Knox Resources Pty Ltd (Knox), a company which is
20% owned by Greenvale and 80% owned by Astute Metals NL (ASX: ASE). As part of its
ownership of Knox, the Company is required to contribute to the funding of its share of Knox’s
future costs.
Greenvale is entitled to a 2% net smelter royalty (Royalty) for all Iron Oxide Copper Gold
(IOCG) product exploited in the future from the existing tenements owned by Knox.
During the Quarter, the Company completed the sale of its remaining 20% in Knox Resources
to Astute Metals (see below). Greenvale received 5 million fully-paid ordinary shares in Astute
Metals, with the potential for an additional 5 million shares contingent upon achieving specific
project milestones within the next four years. These milestones include:
1. A discovery at the Georgina Project defined as a drill-hole intersecting either:
a. 100m at 1% Copper (Cu) or an equivalent grade, provided a minimum
intersection grade of 1% Cu (e.g., 10m @ 10% Cu, 50m @ 2% Cu); or
b. 100m at 1.3g/t gold (Au) or an equivalent grade, provided a minimum
intersection grade of 1.3g/t Au (e.g., 10m @ 13g/t Au, 50m @ 2.6g/t Au).
2. The 100% sale of Knox or the Georgina Project to a third party by Astute Metals;
GREENVALE
ENERGY
LIMITED
5
3. The preparation of a Mineral Resource Estimate in accordance with JORC Code
guidelines for any tenement area within the Georgina Project, including those currently
under application.
As a result of this transaction, Greenvale's shareholding in Astute Metals increased to 12.27%,
representing 51 million fully paid ordinary shares. Additionally, Greenvale retained a 2% net
smelter royalty (NSR) over the Georgina Project, providing ongoing exposure to the project's
future upside.
The divestment has improved the Company’s liquidity and eliminated the ongoing expenditure
requirements associated with holding the project at an asset level. This strategic shift allows
Greenvale to reallocate resources and management focus towards its more promising assets
and towards business development activities.
Corporate Activities
The Quarter saw Greenvale undertake several strategic corporate activities aimed at improving
the Company’s overall financial position and in supporting key projects.
Sale of 20% shareholding in Knox
As set out above, Greenvale successfully completed the sale of its remaining 20% interest in the
Georgina Basin IOCG Project to Astute Metals for the amount of $1,530,000 after the end of the
quarter. This divestment improved the Company’s liquidity of its investment and eliminates the
ongoing expenditure requirements associated with holding the IOCG project, allowing Greenvale
to reallocate resources and management focus towards its more promising assets and business
development activities.
R&D Tax Incentive Rebate
Greenvale received a $0.83 million R&D Tax Incentive Rebate for the 2023 financial year
(Rebate). The Rebate relates to eligible R&D activities conducted on the Company’s Alpha
Torbanite Project in Queensland.
The Australian Government’s R&D Tax Incentive Program provides companies with a tax
offset for eligible R&D activities. The funds received under the R&D Tax Incentive will be used
by the Company for:
• To progress the development pathway for the Alpha Project, which includes
conducting additional test work to upgrade the Alpha shale extract to a premium C170
bitumen product; and
• Targeting additional growth and business development opportunities to add to the
Company’s current portfolio.
Greenvale will make a similar application for the R&D tax incentive rebate for eligible work
conducted on Alpha Torbanite project for the financial year 2024.
Reduction of the loan to Pioneer Resources Partners LLC (Pioneer)
Greenvale issued 18.5 million fully-paid ordinary shares to Pioneer as partial repayment of its
loan facility. This reduced the face value of the loan from $3.28 million to $2.28 million.
Additionally, the Company announced a Share Purchase Plan (SPP) to raise further funds.
However, due to uncertain market conditions and a recent decline in the Company’s share price,
the Board decided to withdraw the SPP.
GREENVALE
ENERGY
LIMITED
6
Completion of the acquisition of the West Walker Helium Project
In alignment with its strategic focus, Greenvale completed the Farm-In Agreement to acquire a
75% interest in EP145, part of the West Walker Helium Project, following receipt of Ministerial
Consent. This acquisition positions Greenvale to lead exploration activities targeting helium,
hydrogen, and hydrocarbons in the highly prospective Amadeus Basin.
Board appointment
The Company also strengthened its Board by appointing Mr. John W Barr as a Non-Executive
Director. Mr. Barr brings over 25 years of experience in resource business start-ups and
corporate advisory. His extensive background includes roles as Executive Chairman of Mosman
Oil and Gas and Chairman of TNG Limited and Thor Mining PLC.
Mr. Barr's knowledge in capital raisings, mergers and acquisitions, and compliance with
corporate and stock exchange requirements is expected to significantly enhance the Board's
capabilities as Greenvale progresses its business development strategy in new energy minerals.
ASX Additional Information
The Company provides the following information pursuant to ASX Listing Rule requirements:
1.
ASX Listing Rule 5.3.1:
Exploration and Evaluation Expenditure during the Quarter was $1,072,682. Full details
of exploration activity during the June 2024 Quarter are set out in this report.
Below is the breakdown of the expenditure incurred:
Table 1 Analysis of exploration expenditure
Property
Nature of expenses
Amount ($)
Alpha Project
Alpha Testwork
410,176
Drilling costs
13,530
Geology and geophysics
40,392
Mining administration and environmental
compliance cost
190,683
Rents and rates
Subtotal – Alpha Project
755
655,536
Geothermal Project
GREENVALE
ENERGY
Compensation and Native Title
Mining administration and environmental
compliance cost
2,887
Subtotal – Geothermal Project
6,217
LIMITED
3,330
7
Hydrogen and Helium
Drilling costs
198,413
Acquisition cost (Farm-In)
Mining administration and environmental
160,000
compliance cost
8,970
Rents and rates
43,546
Subtotal – Alpha Project
410,929
Total Exploration costs
1,072,682
2.
ASX Listing Rule 5.3.2:
The Company confirms that there was no mine production and development activities
for the Quarter.
3.
ASX Listing Rule 5.3.5: Payment to directors, related parties of the Company
and their associates during the quarter was $160,600 in cash.
The Company advises that this relates to remuneration of Directors only. Please see
the Remuneration Report in the Company’s Prospectus for further details on Directors’
Remuneration. Set out below is the following additional information in relation to the
cash flow statement:
Table 2 Director’s remuneration
Name of Director
Neil Biddle
Nature of Payment
Amount ($)
33,300
Elias (Leo) Khouri
Ongoing Director fees, including superannuation
entitlements
Ongoing Director fees
John Barr
Ongoing Director fees
2,300
Mark Turner
Ongoing Director fees, including superannuation
entitlements
Total Director Remuneration
87,500
GREENVALE
ENERGY
LIMITED
37,500
160,600
8
Authorised for Release
This announcement and the accompanying Appendix 5B have been approved by the
Board for release.
Contact
For further details, contact:
Mark Turner, CEO, 0459 519 999
Media Inquiries:
Nicholas Read – Read Corporate
Nicholas@readcorporate.com.au
Mobile: 0419 929 046
GREENVALE
ENERGY
LIMITED
9
Tenements
In accordance with Listing Rule 5.3.3, Greenvale provides the following Information concerning its
exploration licences:
Tenement Details
Alpha Project, Queensland
Tenement
%age Ownership
MDL 330
100%
EPM 27718
100%
Owned by
Alpha Resources Pty Ltd
Alpha Resources Pty Ltd
Geothermal Project, Queensland
Tenement
%age Ownership
Of Applicant
EPM 28265
100%
EPM 28266
100%
EPM 28487
100%
EPM 28488
100%
EPM 28489
100%
EPG 2019
100%
EPG 2020
100%
EPG 2021
100%
EPG 2022
100%
EPG 2023
100%
EPG 2024
100%
EPG 2025
100%
Status
Current to 31 January 2027
Current to 14 February 2026
Applicant
Status
Alpha Resources Pty Ltd
Alpha Resources Pty Ltd
Greenvale Energy Ltd
Greenvale Energy Ltd
Greenvale Energy Ltd
Alpha Resources Pty Ltd
Alpha Resources Pty Ltd
Alpha Resources Pty Ltd
Alpha Resources Pty Ltd
Greenvale Energy Ltd
Greenvale Energy Ltd
Greenvale Energy Ltd
Under Application
Under Application
Current to 29 August 2027
Current to 29 August 2027
Under Application
Under Application
Under Application
Withdrawn
Withdrawn
Under Application
Under Application
Under Application
Hydrogen and Helium, Northern Territory
Tenement
%age Ownership
Owned by
EP 145
80%
Greenvale Gas Pty Ltd
Status
Current to 21 August 2026
•
Mining tenements acquired during the quarter and their location: Nil.
•
Mining tenements disposed during the quarter and their location: Nil.
•
The beneficial percentage interests held in farm-in or farm-out agreements at the end
of the quarter: At the end of the quarter, the Company holds an exclusive right to acquire
up to 80% of the legal and beneficial interest in the exploration licence EP145 (owned
by Mosman Oil & Gas), located in the Northern Territory.
•
The beneficial percentage interests in farm-in or farm-out agreements acquired or
disposed of during the quarter: During the quarter, the Company acquired the exclusive
right to acquire up to 80% of the legal and beneficial interest in the exploration licence EP145
(owned by Mosman Oil & Gas), located in the Northern Territory.
GREENVALE
ENERGY
LIMITED
10
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Greenvale Energy Ltd
ABN
Quarter ended (“current quarter”)
54 000 743 555
30 June 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
(a) exploration & evaluation
Year to date
(12 months)
$A’000
(9)
(89)
(285)
(1,119)
98
103
-
464
(196)
(641)
(1,072)
(3,026)
(b) development
(c) production
(d) staff costs
(e) administration and corporate costs
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Government grants and tax incentives
1.8
Other (provide details if material)
1.9
Net cash from / (used in) operating
activities
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) exploration & evaluation
(e) investments
(f)
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
16
25
(1,056)
(3,001)
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (provide details if material)
2.6
Net cash from / (used in) investing
activities
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2
Proceeds from issue of convertible debt
securities
3.3
Proceeds from exercise of options
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
3.5
Proceeds from borrowings
-
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (provide details if material)
3.10
Net cash from / (used in) financing
activities
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
2,778
5,168
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(196)
(641)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(1,056)
(3,001)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
-
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
-
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Year to date
(12 months)
$A’000
-
-
1,526
1,526
Current quarter
$A’000
Previous quarter
$A’000
5.1
Bank balances
1,526
560
5.2
Call deposits
-
2,218
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,526
2,778
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
90
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
71
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
More information concerning the breakdown of the above payments to directors and their related parties can be
found within the accompanying Quarterly Activities Report.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
7.1
Loan facilities
7.2
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
3,000
-
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
3,000
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
3,000
(a) Loan facilities – directors
The Company announced on 20 October 2022 that it had received a letter of support
from its directors for $3.00 million. The letter of support is to provide an unsecured
loan to the Company, with the following terms:
•
interest at 12.00% per annum; and
•
to be repaid at the earlier of the next capital raising (including an offer entitlement) or
18 months from when the final drawdown has been made by the Company.
(b) Facility – Pioneer Resources LLC
The Company has a facility with an institutional investor, Pioneer Resources LLC for
$4.320 million (inclusive of a premium paid). This facility was fully drawn at 31 March
2023.
The facility is repayable by way of issue of ordinary shares in the Company, unless
Greenvale otherwise elects to repay the facility in cash. For the purposes of
Greenvale’s Appendix 5B, the proceeds from this facility have been reflected as debt
and not equity, as it represents the form of the proceeds received. However, given
that the substance of the of the facility is/will be in the form equity, it has not been
shown as part of the financing facilities under Response 7 above.
8.
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(1,072)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(1,268)
8.4
Cash and cash equivalents at quarter end (item 4.6)
1,526
8.5
Unused finance facilities available at quarter end (item 7.5)
3,000
8.6
Total available funding (item 8.4 + item 8.5)
4,526
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
3.56
(196)
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer:
Not applicable, as Item 8.7 is greater than 2 quarter.
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer:
Not applicable, as Item 8.7 is greater than 2 quarter.
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer:
Not applicable, as Item 8.7 is greater than 2 quarter.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
30 July 2024
Authorised by: The Board of Directors of Greenvale Energy Ltd
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement
Share your feedback
Discover