SEPTEMBER 2026 QUARTERLY ACTIVITIES REPORT
Continued momentum at the Thunderball Uranium Project, growing the
exploration pipeline and securing funding to progress key targets.
Greenvale Energy Limited ASX: GRV (“Greenvale” or “the Company”) is pleased to report on its
activities for the September 2026 Quarter (“the Quarter”), during which the Company
substantially expanded and advanced its uranium exploration pipeline in the Pine Creek region
of the Northern Territory.
Results from the high-resolution airborne survey completed late in the June quarter were used to
inform a focused ground program across EL 34157 and EL 33670, with the work progressively
confirming new prospects, refining the geological model and identifying targets for future drill
testing.
Highlights
Airborne radiometric survey identified 13 priority uranium targets at the
Thunderball Uranium Project, including four anomalies associated with primary
regional structures. A subsequent project-wide geophysical review defined a major
NW–SE trending structure and six additional targets, further expanding the
exploration pipeline .
Follow-up field mapping and sampling confirmed the historical Spectre Prospect and
defined the new Wildcard South and Powers Prospects. This work upgraded
several airborne anomalies into field-supported exploration prospects and validated
the Company’s systematic use of airborne geophysics to refine ground-based
exploration.
The Powers Prospect was expanded into a large potential paleochannel target
extending over approximately 9km strike and up to 400m width. The scale and
continuity of the interpreted channel provide a substantial corridor for further
exploration, with permitting underway for future drill testing.
A successful placement raised approximately A$3.25 million, before costs, and
strengthened the Company’s balance sheet, with proceeds principally directed
towards continued exploration at the Thunderball Uranium Project and Greenvale’s
broader Northern Territory uranium portfolio.
Alpha Test Program 7 moved into its final phase following completion of the
Technix scope, with SAMI Bitumen Technologies commissioned under an expanded
program. SAMI will assess blending and modification options, product performance
and potential compliance pathways as the Company advances its evaluation of
Alpha-derived material for paving-grade bitumen applications.
Greenvale Energy Limited ASX Release
Page | 2
Results from the Quarter continued to validate Greenvale's staged exploration strategy. Airborne
radiometrics initially defined 13 priority anomalies on EL34157, with field mapping, ground
geophysics and sampling then confirming the Spectre, Wildcard South and Powers prospects.
Subsequent geophysical integration then extended the opportunity set into EL33670.
The resulting exploration pipeline now includes the 9km-long Powers paleochannel target,
uranium-anomalous breccia associated with an interpreted splay from the Hayes Creek Fault,
and six additional targets aligned with a newly interpreted regional structure.
The Company also strengthened its funding position through a A$3.25 million placement and
continued to progress the proposed acquisition of uranium rights over the Pine Creek Uranium
Project from Patronus Resources Ltd. Outside of uranium, the Alpha Project moved into the final
phase of Test Program 7 with SAMI Bitumen Technologies.
Operational Activities
Thunderball Uranium Project – EL 34157, EL 33670, ELA 34114 and ELA 33900, Pine Creek
Region, Northern Territory
In July, Greenvale reported the results of the 4,313 line-kilometre airborne magnetics and
radiometrics survey completed over EL 34157. The close-spaced survey, flown on 100m line
spacing at a nominal height of 50m, materially improved the resolution of previous (regional)
datasets and identified 13 priority uranium anomalies designated DR1 to DR13.
Four anomalies are clustered around the Hayes Creek Fault Zone (a major regional structure
associated with high-grade uranium deposits including Thunderball and Bella Rose). The
strongest anomaly, DR6, was located near the historical Spectre Prospect.
Figure 1 – Uranium targets across the southern portion of the Thunderball Uranium Project
Greenvale Energy Limited ASX Release
Page | 3
The survey also outlined a potential paleochannel feature on the western side of EL 34157 and
identified a group of eastern anomalies associated with the Depot and Stray Creek Sandstones
and mapped Cullen Supersuite Granites. These geological relationships support the potential for
more than one uranium deposit style across the project area.
A field crew mobilised in mid-July to map outcropping geology, investigate the airborne
anomalies and collect physical samples. Ground-based assessment used an RS-125
scintillometer and portable XRF to identify areas warranting independent laboratory analysis.
Initial work confirmed three priority prospect areas. At Spectre, mapping refined an anomalous
area approximately 170m wide and 340m long. Approximately 800m south-south-west of the
prospect, the team identified a 20m-wide iron-rich cataclastic limestone breccia striking north-
east to south-west. Its orientation suggested a possible structural connection to the Hayes Creek
Fault and strengthened the interpretation that the fault system may have acted as a pathway for
uranium-bearing fluids.
At Wildcard South, fieldwork mapped an anomalous area approximately 1km wide and 1.4km in
strike length, coincident with the southern extension of the historical Wildcard Prospect. At
Powers North, ground readings confirmed the radiometric signature of the western paleochannel
target. Together, these results validated the progression from remote sensing and airborne
geophysics to focused ground investigation.
Follow-up mapping during August materially expanded the Powers Prospect. The field team
traced the north-south trending radiometric response over approximately 9km of strike and up to
400m in width. Ground radiometric responses were generally three to four times the local
background and correlated with mapped limestone and calcrete-rich cover. The response
increased where transported surface material was removed, supporting the interpretation of a
potential calcrete-hosted system developed near the top of a paleochannel.
Figure 2 – Uranium Prospects developed from greenfield exploration during the Quarter
Greenvale Energy Limited ASX Release
Page | 4
The scale, continuity and shallow geological setting provide an opportunity for cost-efficient first-
pass drill testing. Greenvale commenced the permitting and approvals process for future
exploratory drilling and continued planning a close-spaced airborne electromagnetic survey to
improve understanding of channel geometry and basement architecture.
Figure 3 – Field team member collecting samples at the Powers Prospect
Project Wide Geophysical Review and Additional Targets
During the Quarter, the Company commissioned an independent review of the southern portion
of the project, integrating government, historical and Company-acquired magnetic, radiometric,
gravity and electromagnetic datasets across EL 33670. The review identified a major NW-SE
trending structure, parallel to the geological contact between the Pine Creek Orogen and the
overlying Daly and Birrindudu basins. The feature may represent a graben-forming structure
capable of creating pathways and depositional sites for uranium-bearing fluids.
Ground follow-up confirmed six additional project-level targets on EL 33670, which displayed
consistent anomalous field responses and were associated with mapped limestones and minor
granite outcrop. Samples were collected for independent analysis, with assay results pending.
Assay Validation and Structural Model
The first assay results from the field program confirmed uranium anomalism across the Daly
Basin sediments. Wildcard South returned a peak surface assay of 51ppm U. Results from
Powers were anomalous relative to the local background and remained consistent with the
interpreted cover setting, while assays from the Spectre area supported the field geophysical
observations.
Greenvale Energy Limited ASX Release
Page | 5
Surface assays of up to 21ppm U were also returned from the first breccia exposure south-east
of Spectre. In September, a second anomalous breccia exposure was mapped to the north-
north-east with additional samples collected for assay. The two occurrences are interpreted to
lie on a fault splay that may intersect the Hayes Creek Fault approximately 1.5km east of Spectre.
This interpretation provides a defined structural corridor for further mapping and sampling and
strengthens the exploration model for fault-controlled fluid movement and trapping.
Figure 4 – Regional geology map of the Thunderball Uranium Project with confirmed
Uranium Prospects and targets.
Pine Creek Uranium Project Acquisition
The proposed acquisition of uranium rights over the Pine Creek Uranium Project from Patronus
Resources Ltd remains a key strategic priority. During the Quarter, Greenvale and Patronus
agreed to amend the timetable for satisfaction of the remaining conditions. Greenvale has
completed all of its individual requirements, while the parties continue to progress third-party
approvals and the formal Uranium Rights Agreement.
Greenvale Energy Limited ASX Release
Page | 6
The strategic rationale remains unchanged – completion will combine the Pine Creek uranium
rights, including the high-grade Thunderball Deposit and multiple known advanced prospects,
with Greenvale's adjoining Douglas River tenure to establish a continuous uranium exploration
footprint of approximately 2,500km2
. The significant exploration tenure with known high-grade
uranium occurrences will establish Greenvale as a dominant figure for Australin-based uranium
exploration.
Native Title and Land Access – The tenement application process (to convert ELA to EL) has
involved ongoing Native Title consultations and the formal National Native Title Tribunal (NNTT)
process with the Northern Land Council (NLC) and, in particular, the communities of the
Wagiman, Waral and Jawoyn Peoples.
During the Quarter, the Company continued direct negotiations with the NLC outside of the NNTT
process to address the granting of ELA 34114. These negotiations were ongoing at Quarter-end.
Oasis Uranium Project (100%) – EPM 27565 and EPM 29203, Queensland
During the Quarter, EPM 29203 was granted for an initial term of 5 years, with the first period
expiring 13 September 2031. In September 2025, the Company acquired Sentinel-2 multispectral
imagery which covered the immediate region surrounding the original Oasis tenement1
. The data
revealed multiple gas anomalies that correlated with previous exploration results and both
mapped and interpreted structures.
From this initial prospectivity analysis, a total of nine targets were identified within EPM 27565.
These targets appear to be aligned on northeast-southwest striking trends (see Figure 5), which
also appear to extend into the newly granted EPM 29203.
The combination of geological, geophysical and geochemical anomalism in the region of the two
Oasis tenements predominantly coincides with mapped occurrences of Mywyn Granite, an S-
type granite interpreted to be Mesoproterozoic in age (ca. 1550Ma) intruding into the older
country rocks of the Palaeoproterozoic-aged (~1670 – 1695Ma) Einasleigh Metamorphics (Bain &
Draper, 1997; Geoscience Australia, 2012; Terra Search, 2024). Analysis of magnetics data at
Oasis had earlier identified multiple, broadly N-S and NE-SW trending intersecting structures,
which themselves correlate with the mapped positions of the granite/metamorphic contacts.
The Mywyn Granite is one of the potential source rocks for the uranium at Oasis, later disrupted
by a younger intermediate and mafic dyke system. The heat from these intrusions either
remobilised the uraniferous fluids or transported the fluids further afield. Hydrothermal fluids
altered some of the schists, partially resulting in the formation of the chlorite which can be a
major reductant for uranium.
No material fieldwork was reported at Oasis during the Quarter as the Company prioritised its
active Northern Territory field program. Oasis remains an advanced, high-grade uranium asset
and an important part of Greenvale's portfolio. Planned regional mapping and sampling will be
scheduled having regard to access, seasonal conditions and the Company's broader exploration
priorities.
1
Refer to ASX Announcement Regional Discovery Potential Further Enhanced at the Oasis Uranium Project released 11 February
2026
Greenvale Energy Limited ASX Release
Page | 7
Figure 5 – Exploration results (rockchips / geochemical) overlying multispectral, structural
and magnetics data and interpretation.
Elkedra-Henbury Uranium Project (80%) – EL 33756, EL 33637 and EL 33638, Northern
Territory
No material fieldwork was completed at Elkedra-Henbury during the Quarter. At Quarter-end, the
Company was planning ground investigations of selected radiometric anomalies using the same
mapping, RS-125, portable XRF and physical sampling methodology applied at Thunderball. The
Company expects to undertake initial mapping and sampling at Elkedra and Henbury in the
December quarter.
Alpha Project (100%) – MDL 330 and EPM 27718, Queensland
Alpha Test Program 7 (TP7) advanced into its final phase during the Quarter. Technix concluded
its scope after assessing the use of its proprietary processing approach to blend and modify
Alpha-derived material toward the C-170 paving-grade bitumen specification. High-speed mixing
under pressure produced a more uniform material and increased viscosity, demonstrating the
importance of controlled high-shear processing, but the resulting material did not achieve the
required C-170 viscosity. The program identified adhesion and elasticity as the principal
remaining technical challenges and confirmed that the resin-to-asphaltene balance is a key
control on performance.
Subsequently, Greenvale commissioned SAMI Bitumen Technologies (SAMI) to undertake a
broader staged program covering residue preparation, detailed binder characterisation,
formulation development and, subject to successful intermediate results, compliance
assessment.
Greenvale Energy Limited ASX Release
Page | 8
SAMI will assess two principal pathways: blending Alpha-derived material with conventional
paving-grade bitumen, and modification using compatible additives and controlled laboratory
processing. The objective is to maximise the practical proportion of Alpha-derived material in a
compliant binder. C-170 remains the preferred target, although alternative AS 2008 paving-grade
specifications may be evaluated where technically and commercially appropriate.
The SAMI program is scheduled to commence following receipt of material from New Zealand
(which occurred after Quarter-end) and is forecast to take approximately six to eight weeks. The
Company expects the SAMI scope of work to be completed in the December quarter.
The Alpha Project remains strategically important given Australia’s reliance on imported crude-
oil-derived products, and the tightening domestic and global bitumen supply environment. The
Company will continue to update the market as the product development and certification
pathway advances.
Millungera Basin Geothermal Project (100%) – EPG 2023, EPG 2024 and EPG 2025 –
Queensland – Under Farm-out with Sunrise Energy Metals
The farm-out partner completed technical desktop work during the Quarter focused on data
preparation and target framing, including definition of the target criteria, loading available well
data, undertaking basic quality control and identifying material data gaps and limitations.
A geological model was developed, including seismic interpretation, tying available wells to the
seismic data, defining the fault framework and regional depth trends, and incorporating available
temperature indicators and geothermal gradients. This integrated model is intended to provide a
consistent subsurface framework for ranking prospective areas and defining the next phase of
technical work.
The project remains subject to the previously announced farm-in and future joint venture
pathway with SRL Hot Rocks Pty Ltd, a wholly owned subsidiary of Sunrise Energy Metals, with
Greenvale remaining free-carried during the farm-in phase.
Longreach Geothermal Project (100%) – EPG 2029 Queensland
Having successfully surrendered EPG 2029 in the previous quarter, the Company awaits return
of its environmental bond, which is expected in H2 CY2026.
Schedule of Tenements
The Company’s tenement schedule is provided in Appendix 1.
ESG and Sustainability
During the Quarter, Greenvale continued stakeholder engagement across its uranium
exploration portfolio, including daily engagement with key stakeholders in/around EL 34157
where the Company was active in the field.
The Company remains committed to safe, responsible and respectful exploration practices,
including engagement with Traditional Owners, pastoralists, landholders and relevant regulatory
authorities.
Greenvale Energy Limited ASX Release
Page | 9
Finance
Capital Raise
During the Quarter, the Company completed a placement of 98,484,848 new fully paid ordinary
shares at $0.033 per share, raising approximately $3.25 million before costs. The placement was
supported by institutional investors alongside existing shareholders. Director participation for
the placement was approved at a General Meeting held on 21 September 2026.
Cash Position
The Company held cash and cash equivalents of approximately $3.7 million (unaudited) at 30
September 2026.
Exploration Expenditure
During the Quarter, the Company invested approximately A$530K in exploration and evaluation
activities across its project portfolio. Approximately 78% related to uranium exploration.
R&D Expenditure and Tax Rebate
During the Quarter, A$85k was spent on R&D for the Alpha Project. The Company is in the process
of preparing the FY2026 R&D tax claim and expects to receive approximately $200,000 as an R&D
rebate. It is expected that these funds will be received in Q1 CY2027.
Other Disclosure
As disclosed under item 6 in Appendix 5B, the Company made payments to related parties for a
total consideration of A$130K. This consideration relates to payments attributable to routine
Director fees including statutory superannuation. The Company maintains a Director-provided
finance facility, which remains undrawn. The Company therefore ended the Quarter with zero
debt.
The Company confirms that there was no mine production nor mine development activities for
the Quarter.
Corporate Activity
Marketing
During the Quarter the Company was involved in a number of dedicated marketing efforts
including presenting at the JMM Noosa Mining Conference lunch, an Investor pitch on the eve of
the Diggers and Dealers conference, a project update at the Mining the Territory conference and
the annual RRS Gold Coast investor conference.
Mergers and Acquisitions
The Company continues to receive inbound proposals for a range of projects and reviews each
opportunity on a case-by-case basis. Any M&A activity is currently centred on the Company’s
intent to establish itself as a dominant uranium explorer in the Pine Creek Region of the Northern
Territory.
Greenvale Energy Limited ASX Release
Page | 10
General Meetings
The Company held a General Meeting on 24 August 2026 to approve the issue of consideration
shares to Patronus Resources Ltd. The Company also held a General Meeting on 21 September
2026 to ratify the issue of Placement Shares and approve the issue of Placement Options as well
as the issue of shares and options to Directors. All resolutions were passed on a poll.
The Annual General Meeting for the Company will take place on 23 November 2026, with a Notice
of Meeting issued after Quarter end.
Capital Structure
At the end of the Quarter, the Company had 688,190,133 shares, 15,500,000 performance rights
and 21,556,122 unlisted options (exercise price of $0.07 and expiry of 30 November 2026) on
issue.
Subsequent to the Quarter-end, the Company issued a further 4,545,455 shares relating to the
July Placement, 50,000,010 unlisted options (exercise price of $0.07 and expiry of 30 November
2028) and 15,909,091 unlisted options (exercise price of $0.07 and expiry of 30 November 2029).
Key ASX Announcements during the Quarter
Airborne Survey Delivers 13 Priority Uranium Targets at Thunderball dated 13 July 2026
Placement Secures Funding to Accelerate Uranium Exploration dated 28 July 2026
Initial Fieldwork Confirms New Priority Prospects at Thunderball dated 3 August 2026
Pine Creek Uranium Project Acquisition Update dated 21 August 2026
9km Uranium Paleochannel Target identified at Thunderball dated 1 September 2026
Alpha Test Program 7 Scope Increased dated 9 September 2026
RRS Gold Coast Investor Conference Presentation dated 9 September 2026
Additional Large Scale Uranium Targets Identified for Drill Testing dated 24 September 2026
All announcements are available at: greenvaleenergy.com.au/announcements
Authorised for release
This announcement has been approved for release by the Board of Directors.
For further information please contact
Alex Cheeseman Nicholas Read
Managing Director Read Corporate
E: admin@greenvaleenergy.com.au E: nicholas@readcorporate.com.au
M: +61(0) 485 603 120 M: +61(0)419 929 046
About Greenvale Energy Limited Greenvale is an ASX-listed exploration company, committed to building a
portfolio of projects that will support the need for clean energy and critical infrastructure. The Company
is building a large land holding in the world-class Pine Creek region of the Northern Territory, and also
owns the advanced, high-grade Oasis Uranium Project in Queensland. The Company has additional new-
energy/forward facing projects including the strategically significant Alpha Project. Greenvale’s projects
are all aligned with the global need for reliable, sustainable, low-emissions energy and supply chains.
Greenvale Energy Limited ASX Release
Page | 11
The Company believes the best way to create long-term shareholder value is by investing in exploration,
to make discoveries and grow its resource-base.
Compliance Statement This announcement contains information on the Oasis, Douglas River and Alpha
projects, extracted from ASX market announcements dated 11 February 2026, 26 February 2026, 6 March
2026, 15 June 2026, 13 July 2026, 3 August 2026, 1 September 2026, 9 September 2026 and 24 September
2026 reported in accordance with the JORC Code 2012 Edition and available for viewing at
greenvaleenergy.com.au/announcements. The Company confirms that it is not aware of any new
information or data that materially affects the information included in any original announcement and that
all material assumptions and technical parameters underpinning the estimates in the original market
announcement continue to apply and have not materially changed.
Forward Looking Statements This announcement may contain certain forward-looking statements and projections.
Such forward looking statements/projections are estimates for discussion purposes only and should not be relied
upon. Forward looking statements/projections are inherently uncertain and may therefore differ materially from
results ultimately achieved. The Company does not make any representations and provides no warranties concerning
the accuracy of the projections and disclaims any obligation to update or revise any forward-looking
statements/projects based on new information, future events or otherwise except to the extent required by applicable
laws. While the information contained in this report has been prepared in good faith, neither the Company nor any of
its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to the
fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
announcement.
Greenvale Energy Limited ASX Release
Page | 12
Appendix 1 – Schedule of Tenements at 30 September 2026
Alpha Project, Queensland
Tenement Owned by Status
Acquired
Interest during
Quarter
Disposed
Interest during
Quarter
Interest at end of
Quarter
MDL 330 Alpha Resources Pty Ltd Current to 31 January 2027 - - 100%
EPM 27718 Alpha Resources Pty Ltd Current to 14 February 2031 - - 100%
Geothermal Projects, Queensland
Tenement Owned by Status
Acquired
Interest during
Quarter
Disposed
Interest during
Quarter
Interest at end of
Quarter
EPG 2023 Greenvale Energy Ltd Current to 18 September 2030 - - 100%
EPG 2024 Greenvale Energy Ltd Current to 11 September 2030 - - 100%
EPG 2025 Greenvale Energy Ltd Current to 5 November 2030 - - 100%
Uranium Project, Queensland
Tenement Owned by Status
Acquired
Interest during
Quarter
Disposed
Interest during
Quarter
Interest at end of
Quarter
EPM 27565 Greenvale Utilities Pty Ltd Current to 23 February 2027 - - 100%
EPM 29203 Greenvale Utilities Pty Ltd Current to 13 September 2031 - - 100%
Uranium Projects, Northern Territory
The Company holds an exclusive right to acquire up to 80% of the legal and beneficial interest in the Northern Territory Uranium
Projects under is Farm-in Agreement with Gempart (NT) Pty Ltd
Tenement Owned by Status
Acquired
Interest during
Quarter
Disposed
Interest during
Quarter
Interest at end of
Quarter
EL 33670 Greenvale Utilities Pty Ltd Current to 19 May 2030 - - 80%
EL 34157 Greenvale Utilities Pty Ltd Current to 26 February 2032 - - 80%
EL 33756 Greenvale Utilities Pty Ltd Current to 26 September 2030 - - 80%
EL 33637 Greenvale Utilities Pty Ltd Current to 14 April 2030 - - 80%
EL 33638 Greenvale Utilities Pty Ltd Current to 14 April 2030 - - 80%
Tenement Applicant Status
ELA 33900 Greenvale Utilities Pty Ltd Under Application - - 80%
ELA 34114 Greenvale Utilities Pty Ltd Under Application - - 80%
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Greenvale Energy Ltd
ABN Quarter ended (“current quarter”)
54 000 743 555 30 September 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
1. Cash flows from operating activities
1.1 Receipts from customers - -
1.2 Payments for
(a) exploration & evaluation - -
(b) development - -
(c) production - -
(d) staff costs (116) (116)
(e) administration and corporate costs (416) (416)
1.3 Dividends received (see note 3) - -
1.4 Interest received 4 4
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other (provide details if material) - -
1.9 Net cash from / (used in) operating activities (528) (528)
2. Cash flows from investing activities
2.1 Payments to acquire or for:
(a) entities - -
(b) tenements (11) (11)
(c) property, plant and equipment (58) (58)
(d) exploration & evaluation (530) (530)
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
2.2 Proceeds from the disposal of:
(a) entities - -
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing activities (599) (599)
3. Cash flows from financing activities
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3,250 3,250
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(200) (200)
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other (provide details if material) - -
3.10 Net cash from / (used in) financing activities 3,050 3,050
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
807 807
4.2 Net cash from / (used in) operating activities
(item 1.9 above)
(528) (528)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(599) (599)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
3,050 3,050
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
4.5 Effect of movement in exchange rates on cash
held
- -
4.6 Cash and cash equivalents at end of period 2,730 2,730
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 128 403
5.2 Call deposits 2,602 404
5.3 Bank overdrafts - -
5.4 Other (provide details) - -
5.5 Cash and cash equivalents at end of quarter
(should equal item 4.6 above)
2,730 807
6. Payments to related parties of the entity and their associates Curren