Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
28 July 2023
QUARTERLY ACTIVITIES REPORT 30 JUNE 2023
STRONG PROGRESS ON ALPHA TORBANITE DEVELOPMENT
WITH OUTSTANDING RESULTS FROM TEST PROGRAM THREE
AND RESOURCE UPGRADE DRILLING UNDERWAY
Highlights
Alpha Torbanite Project, QLD (100%-owned):
•
Test Program Three completed with the following outstanding results:
o Maximum conversion of 67.30wt% achieved for the Cannel Coal
portion of the Alpha Resource, 65.87wt% conversion achieved for
the Torbanite portion and 66.32wt% conversion obtained for a
blended sample.
o 72% improvement achieved in the maximum conversions for
Cannel Coal from Test Program Two to Test Program Three.
o The majority of the samples tested in Program 3 had
asphaltene/pre-asphaltene contents exceeding 10wt%.
•
Test Program Four in progress, designed to improve on the conversions
demonstrated in Program Three, emphasising heavy oil and asphaltenes
yield enhancement.
•
Resource upgrade drilling commenced at the Alpha Project aimed at:
o Increasing the amount of geological, structural and technical data
to improve confidence levels in the current Inferred Resource and
calculate an Indicated Resource to support feasibility work;
o Targeting potential extensions of the deposit to the south and
west that have clear potential to grow the overall scale of the
Resource; and
o Providing important geotechnical data to facilitate mine design.
Geothermal Project – 100%-owned
• Greenvale partners with CeraPhi Energy to deliver an initial feasibility
study on the potential for geothermal power generation at Longreach in
Queensland.
• CeraPhi Energy has already commenced work on the feasibility study,
which is scheduled to be completed in approximately 12 weeks.
• Greenvale secures an option to utilise CeraPhi’s proprietary down-hole
patents for its ground-breaking closed-loop geothermal technology.
Greenvale Energy Ltd I ABN 54 000 743 555
Level 5/Suite 6 189 Kent Street SYDNEY NSW 2000
t:+61 2 8046 2792 | e: admin@greenvaleenergy.com.au | www.greenvaleenergy.com.au
•
•
The technology offers significant environmental benefits – no fracking &
no water use involved.
Connection inquiry submitted to Ergon Energy for potential geothermal
power plant at Longreach.
Georgina Basin IOCG Project, NT (20%-owned):
•
•
•
•
•
Mapping of sediment-hosted mineral systems by Geoscience Australia
sediment-hosted has highlighted the Ranken Project area as highly
prospective for clastic-dominated zinc-silver-lead deposits
Geophysical Gravity and HVSR Passive Seismic surveying commenced
and completed at Ranken Project, paving the way for initial Ranken drill
design.
Gravity and Passive Seismic surveys designed to identify zones of density
variation within prospective host rocks and establish depth of cover, to
identify drill targets.
Additional gravity data acquired to complement Co-Funded Ambient
Noise Tomography scheduled for Q3 2023
The Joint Venture Company was awarded two co-funding grants in the
Round of 16 of the NTGS (Northern Territory Geological Survey)
Geophysics and Drilling Collaborations program, for a combined grant
value of $261,106
Corporate:
• Greenvale maintains a substantial shareholding in Astute Metals NL.
Overview
During the 30 June 2023 Quarter, Greenvale Energy Limited (ASX: GRV) continued to make
strong progress with development studies for its 100%-owned Alpha Torbanite Project in
Queensland, substantially progressing the pivotal liquefaction test work phase and
successfully completing Liquefaction Test Program Three with highly encouraging results.
The Company remains on track to complete the final key inputs to the Alpha Pre-Feasibility
Study (PFS).
The results from Test Program Three confirmed that a maximum conversion of 67.30wt% was
achieved for the Cannel Coal portion of the Alpha Resource, 65.87wt% conversion was
achieved for the Torbanite portion of the Resource and 66.32wt% conversion was achieved
for a blended sample. These results, when compared to the maximum conversion rates
achieved in Test Programs One and Two, are outstanding and have significantly enhanced
the economic potential of the Alpha Project.
The Company also continued to advance its geothermal project, entering into a binding Heads
of Agreement (HOA) with internationally renowned geothermal consultancy and engineering
firm, CeraPhi Energy, to complete a feasibility study on the development of a geothermal
power plant at its Longreach Geothermal Project in North Queensland.
GREENVALE
ENERGY
LIMITED
2
In addition, Greenvale has a non-exclusive option to utilise CeraPhi’s CeraPhiWellTM
proprietary patents for its ground-breaking closed-loop geothermal technology. This initiative
is considered to be a major step toward unlocking the value that sits within Greenvale’s
geothermal project.
Greenvale owns a 20% interest plus a 2% royalty over the iron oxide copper gold (IOCG)
Georgina Basin Project in the Northern Territory with Astute Metals NL (ASX: ASE) (Astute).
During the quarter, considerable geophysics work was undertaken at the project to further
advance what is believed to be highly prospective discovery opportunity. Greenvale is also
the largest shareholder in Astute.
Astute undertook a capital raising at the beginning of the quarter to progress its growth
strategy, including a major ongoing lithium-in-clay exploration program in Nevada, progressing
its WA mineral sands asset and undertaking epxloration at the Georgina IOCG Project.
Projects
Alpha Project, Queensland
Background
The Alpha Torbanite Project is located approximately 50km south of the town of Alpha in
Central Queensland. The Alpha torbanite deposit consists of two seams, an upper seam of
mostly lower-grade mineralisation with an average thickness of 1.12m and a lower seam
containing lenses of torbanite up to 1.9m thick. The Project has been subject to extensive
exploration and laboratory testing since its initial discovery in 1939.
During 2019, SRK Consulting Pty Ltd (“SRK”) was engaged to reassess the project’s
commercialisation strategy. SRK’s report set out a potential new development strategy based
on the production of a diversified suite of value-added products. SRK noted that, in contrast
with typical oil shale deposits, the Alpha torbanite deposit is exceptionally high-grade,
containing up to 650 litres of hydrocarbons per tonne of torbanite, and can produce high-value
bitumen, light crude oil and activated carbon.
The upper and lower bituminous shales also produce similar products, albeit at lower yields of
110-140 litres per tonne. Additionally, the torbanite and bituminous shales can deliver highquality value-added products through appropriate investment in processing infrastructure.
SRK was engaged to undertake a staged work program to assist in evaluating the commercial
viability of the project.
Activities during the June Quarter
Laboratory liquefaction testing
During the quarter, the Company progressed critical liquefaction test work on bulk samples
from the Alpha Project. Outstanding results were received from Test Program Three which
again exceeded the Company’s expectations and further enhanced the potential of the Alpha
deposit to produce bitumen for the domestic market in Australia, helping to meet surging
demand from the infrastructure sector.
GREENVALE
ENERGY
LIMITED
3
The completion of Test Program Three paves the way for the immediate commencement of
Test Program Four, which will in turn underpin the completion of the Alpha Project PreFeasibility Study (PFS).
During Test Program Three, a maximum conversion of 67.30wt% was achieved for the Cannel
Coal portion of the Alpha Resource, 65.87wt% conversion was achieved for the Torbanite
portion of the Resource and 66.32wt% conversion was achieved for a blended sample. These
results, when compared to the maximum conversion rates achieved in Test Programs One
and Two, are outstanding and have significantly enhanced the economic potential of the Alpha
Project.
For the purposes of comparison, during Test Program Two a maximum conversion of
39.03wt% was achieved from a Cannel Coal sample, and a maximum conversion of 38.29wt%
from a Torbanite sample was achieved as part of Test Program One. This represents a 72%
overall improvement in the maximum conversions for Cannel Coal from Test Program
Two to Test Program Three.
Additionally, the majority of the samples tested in Program 3 had asphaltene/pre-asphaltene
contents exceeding 10wt%, regardless of the specific experimental conditions. Interestingly,
the Cannel Coal samples performed similarly to the Torbanite samples, particularly when the
experimental conditions were more severe.
Bituminous products typically contain 5-25% asphaltenes, with the asphaltenes blended with
heavy oil fractions in varying ratios to produce a wide variety of products. Theoretically, the
greater the amount of preserved asphaltenes, the greater the potential output of bituminous
products.
Greenvale’s technical consultants, PROCOM, have been integral in delivering these
outstanding results, having designed the laboratory program, conducted the data
interpretation and drafted the technical report. The lab work, under instruction from PROCOM,
was completed by the University of Jordan.
During Test Program Three, a total of 12 tests were conducted under differing experimental
conditions to determine the optimum process to improve the conversion of the Torbanite and
Cannel Coal, focusing on maximising the heavy fractions necessary for the production of
bituminous products.
The study evaluated the performance of four samples each of Cannel Coal, Torbanite, and a
1:2 blend of the two in line with the ratio across the deposit. Outcrop samples continued to be
used in this program to build from the knowledge base. The reaction tests were conducted at
higher temperature conditions (370oC – 400oC) compared to Test Programs 1 and 2.
The results demonstrate excellent progress in converting the samples into liquids at the
optimal temperature of 400oC.
GREENVALE
ENERGY
LIMITED
4
Table 1: Test Program 3 oil shale liquefaction results of conversion and yield products of oil shale samples
Oil Shale
Sample
Conversion
O+G
A+ PA
Residue
Seams
ID
(wt%)
(wt%)
(wt%)
(wt%)
Cannel Coal
3B1
51.95
38.71
13.24
48.05
Oil base, 0%catalyst, 400C
Torbanite
3F1
62.99
51.39
11.60
37.01
Oil base, 0%catalyst, 400C
3Blend1
66.32
53.94
12.39
33.68
Oil base, 0%catalyst, 400C
Cannel Coal
3B2
31.71
22.07
9.64
68.29
Water base, 0%catalyst, 400C
Torbanite
3F2
41.73
32.18
9.55
58.27
Water base, 0%catalyst, 400C
3Blend2
40.65
37.01
3.64
59.35
Water base, 0%catalyst, 400C
Cannel Coal
3B3
67.03
50.77
16.26
32.97
Oil base, 2%catalyst, 400C
Torbanite
3F3
65.87
52.85
13.02
34.13
Oil base, 2%catalyst, 400C
3Blend3
55.75
41.99
13.75
44.25
Oil base, 2%catalyst, 400C
Cannel Coal
3B4
38.87
28.92
9.95
61.13
Oil base, 2%catalyst, 370C
Torbanite
3F4
46.66
35.26
11.40
53.34
Oil base, 2%catalyst, 370C
3Blend4
41.09
30.64
10.45
58.91
Oil base, 2%catalyst, 370C
Blend
Blend
Blend
Blend
Experiment Conditions
The following summarises the key outcomes of the three test programs:
Test Program 1:
•
•
•
Torbanite 1F2 sample achieved a conversion of 38.3wt% at 345oC, starting hydrogen
pressure of 3500 kPa 1 and 2wt% catalyst. This conversion was almost twice as high as
the 20wt% conversion of the Torbanite 1F1 sample at 290oC, 1,750kPa starting
hydrogen pressure and 1.5wt% catalyst.
Cannel Coal 1B1 sample achieved 24.9wt% conversion at 340oC, 3,500 kPa initial
pressure and 1.5wt% catalyst.
Blend samples achieved conversions of 15.9wt% – 19.7wt%, with temperatures of
350oC and 340oC, respectively, and an initial pressure of 3,500 kPa.
Test Program 2:
•
•
•
Cannel Coal 2B1 sample achieved 32.7wt% conversion at 365oC, 3,500kPa and 3.4wt%
catalyst.
Cannel Coal 2B2 sample achieved 33.1wt% conversion at 365oC, 3,500 kPa and
2.5wt% of catalyst.
Cannel Coal 2B3 sample achieved 39.0wt% conversion at 365oC, 3,500 kPa and
6.1wt% of catalyst.
GREENVALE
ENERGY
LIMITED
5
Test Program 3:
•
•
•
•
Cannel Coal 3B1 sample of 52wt% conversion, Torbanite 3F1 sample of 63wt%
conversion and Blend 3Blend1 sample of 66.3wt% conversion at 400oC, in a carrier oil
and without catalyst.
Cannel Coal 3B2 sample of 31.7wt% conversion, Torbanite 3F2 sample of 41.73wt%
conversion and Blend 3Blend2 sample 40.7wt% conversion at 400oC, without catalyst
and water carrier.
Cannel Coal 3B3 sample of 67wt% conversion, Torbanite 3F3 sample of 65.9wt%
conversion and Blend 3Blend3 sample 55.8wt% conversion at 400oC, 2wt% catalyst and
oil as the carrier.
Cannel Coal 3B4 sample of 38.87% conversion, Torbanite 3F4 sample of 46.66%
conversion and Blend 3Blend4 sample 41.1wt% conversion at 370oC, 2wt% catalyst and
oil as the carrier.
Figure 1: A comparison of the maximum conversions achieved for cannel coal samples across the three
liquefaction test programs
Test Procedures
In the previous Test Programs One and Two, reactions were conducted in a 7-litre Parr
Reactor with a carrier oil volume ranging from 2 to 4 litres and shale weighing between 300
and 700 grams.
In the current Test Program 3, the liquefaction reactions were carried out in a 0.1-litre stirred
autoclave reactor. In a typical experiment, designated powdered shale ore samples, with or
without the iron-based catalyst, were mixed with the carrier, oil or water, and then charged
into the reactor. After loading, the reactor was first purged to replace air using, initially, nitrogen
followed by hydrogen, then pressurised with hydrogen to the required pressure at room
temperature.
GREENVALE
ENERGY
LIMITED
6
The charged autoclave reactor was heated to the desired temperature. Pressure in the reactor
rose with temperature. Once the target temperature was reached, the temperature was held
for 30 minutes before cooling commenced. At the end of each run, the reactor rig was cooled
to room temperature, and the samples were collected for subsequent laboratory tests.
No gas samples were taken under this testing program. A negligible amount of gas evolution
was detected from Test Programs 1 and 2, and the gas analyses did not vary substantially.
Results from this program also indicated little gas made and overall mass balance closure
better than +/- 2%. Further testing of the off-gas will be conducted in the yield tests conducted
on the core samples (Test Program Four).
For each experiment, the potential gas yield is estimated by the weight loss of the reactor and
contents before and after the reactions at room temperature and pressure.
Table 2: Summary of the experiment tests and conditions
Samples
Solid
Catalyst/Shale
Carrier
Temperature
Pressure
ID
(g)
wt%
Type
oC
Initial
(MPa)
Max
After
(MPa)
(MPa)
Cannel Coal (3B1)
10
0
Oil Base (30g)
400
7.74
16.9
6.71
Torbanite (3F1)
10
0
Oil Base (30g)
400
8.1
16.35
6.50
Blend (3Blend1)
10
0
Oil Base (30g)
400
7.11
16.97
6.00
Cannel Coal (3B2)
10
0
Water Base
(30g)
400
0.50
24.00
0.48
Torbanite (3F2)
10
0
Water Base
(30g)
400
1.01
25.90
0.99
Blend (3Blend2)
10
0
Water Base
(30g)
400
0.97
25.41
0.95
Cannel Coal (3B3)
10
2
Oil Base (30g)
400
8.66
17.75
5.7
Torbanite (3F3)
10
2
Oil Base (30g)
400
8.91
18.07
8.46
Blend (3Blend3)
10
2
Oil Base (30g)
400
8.97
17.96
7.97
Cannel Coal (3B4)
10
2
Oil Base (30g)
370
10.29
18.66
9.28
Torbanite (3F4)
10
2
Oil Base (30g)
370
9.35
16.57
8.16
Blend (3Blend4)
10
2
Oil Base (30g)
370
9.4
17.84
8.37
Next Steps
Overall, the liquefaction program has been extremely encouraging. The dataset from Test
Programs One, Two and Three will prove invaluable in evaluating the Alpha Resource for the
Pre-Feasibility Study. With the initial success of Programs One and Two, and encouraging
improvements from Test Program Three, attention now shifts to Test Program Four.
GREENVALE
ENERGY
LIMITED
7
As part of the upcoming testing program, the reported conversion under Test Program Three
will be experimentally improved, with the liquefaction tests conducted using Alpha core
samples. The reaction tests of the core samples will be systematically investigated under
various pressure, temperature, reaction time and catalyst concentration, in line with the
findings from Test Program Three. The liquefied products will be interpreted and reported to
the market in due course.
Test Program Four will be designed to improve on the conversions demonstrated in Program
Three, emphasising heavy oil and asphaltenes yield enhancement. Greenvale’s technical
team is confident that there is still scope for improvement. PROCOM has designed the Scope
of Work (SOP) that describes the experimental program and instructions for the upcoming
Test Program Four. In addition, the Core samples have also been prepared by the PROCOM
team and are readily available to initiate the liquefaction experiments.
Once Test Program Four has commenced, Greenvale expects to be in a better position to
determine the final delivery date of the Pre-Feasibility Study.
The significant improvements in conversions throughout the liquefaction program have
impacted multiple aspects of the PFS delivery. The continuous improvements and changes to
conversion conditions have resulted in significant changes to everything from mine planning
to process and plant design.
Drilling
During the quarter, the Company commenced the second phase of drilling at its 100%-owned
Alpha Torbanite Project (commencement date 28 June 2023). This phase of drilling will
comprise 25 HQ core holes and 15 open holes. The core holes are designed to increase the
size and confidence levels in the Alpha Mineral Resource (18.6Mt JORC Mineral Resource –
refer ASX announcement, 10 March 2022), including reported tonnages for the cannel coal in
both the Upper Seam and the Lower Seam.
The drilling program will also facilitate updated structural and geological modelling and provide
key geotechnical data for mine planning purposes, as well as for definitive process design
work. The open holes are designed to test the continuity of the Upper and Lower seams to the
south and to the west of the deposit within EPM 27718, potentially laying the foundations for
an increase in the overall size of the Resource.
The Program
Prior to the commencement of the drilling, the Greenvale field team prepared the site to
complete drill pad and access track preparation. BG Drilling has been engaged to complete
the 2,000m drill programme, which is expected to take approximately 55 days to complete.
This program will include down-hole geophysical surveying to map the continuity of the lenses
of torbanite and Upper and Lower cannel coal seams. The open hole drill logs and down-hole
data will be utilised to complete an updated structural and geological model.
GREENVALE
ENERGY
LIMITED
8
Figure 2: Alpha drill-hole locations
The core drilling undertaken in 2021 targeted areas where the torbanite lens was present in
the Lower Seam. This subsequent phase of drilling will target all areas where the Upper and
Lower seams are present, including areas that have not previously been cored.
After the drilling has been completed a laboratory analysis will be undertaken with the following
objectives:
•
•
•
•
•
•
Obtain additional coal quality samples from the Upper Seam as well as the Lower Seam
where the torbanite lenses are not present to increase confidence in coal quality in these
areas.
Determine coal quality parameters for the cannel coal.
Collect samples for mine design planning purposes.
Obtain samples for future coal quality testing.
Allow an updated Inferred Resource estimate to be completed.
Establish an Indicated Resource estimate.
GREENVALE
ENERGY
LIMITED
9
Figure 3: Summary of local seam geology in MDL 330
Geothermal Project, Queensland
Background
Greenvale and its wholly-owned subsidiary, Alpha Resources is the 100% owner of a number
of exploration licences in north Queensland of Geothermal energy projects. Geothermal
energy is the heat produced deep in the earth's core. Geothermal energy is regarded a clean,
renewable resource that can be harnessed for use as heat and electricity.
Activities during the June Quarter
During the quarter, the Company executed a binding HOA with internationally renowned
geothermal consultancy and engineering firm, CeraPhi Energy, to complete a feasibility study
on the development of a geothermal power plant at its Longreach Geothermal Project in North
Queensland.
GREENVALE
ENERGY
LIMITED
10
In addition to outlining the key terms of the feasibility study engagement, the HOA between
the two companies gives Greenvale a non-exclusive option to utilise CeraPhi’s CeraPhiWellTM
proprietary patents for its ground-breaking closed-loop geothermal technology.
Greenvale’s technical team sees the CeraPhiWellTM proprietary patents as integral to
unlocking the immense geothermal potential of its geothermal exploration permit application
areas, specifically those in Longreach and the exciting Millungera Basin region.
CeraPhiWell™’s proprietary patents pertain to the unique design and installation of a downhole heat exchanger system that innovatively employs existing technologies. This system
offers remarkable versatility, enabling the recovery of commercially viable heat energy from
the sub-surface in a wide range of locations. Furthermore, the CeraPhiWell™ serves as a
dependable contingency for wells that do not meet production expectations.
In line with this commitment, Greenvale has chosen Longreach as the pilot area for its
geothermal energy strategy and will partner with CeraPhi Energy to assess the effectiveness
of its proprietary patents for the CeraPhiWellTM down-hole heat exchanger system.
Greenvale is continuing to make significant inroads with its renewable energy strategy, with
EPG 2029 close to being awarded and plans to build Australia's first geothermal power station
in Longreach using CeraPhi Energy's closed-loop technology. This technology will enable
Greenvale to produce 24/7 baseload renewable energy with no groundwater usage, making it
an environmentally friendly and sustainable option.
Moreover, the Queensland State Government's recent takeover of the CopperString Project
is a positive development for Greenvale. The Project runs through Greenvale's EPG
applications in the Millungera Basin, putting the Company in a favourable position to pursue
geothermal opportunities in the area. The successful implementation of the Longreach Project
is expected to pave the way for a larger-scale geothermal energy plant in the Millungera Basin,
in line with the advancement of the CopperString Transmission Project.
Greenvale's innovative approach and the adoption of new technologies position it as a
significant challenger in the sustainable energy industry, with the potential to drive real change.
Full details of CeraPhi Energy can be found in ASX release dated 11 May 2023.
About CeraPhiWell™
The CeraPhiWell™ technology represents a breakthrough in closed-loop geothermal well
systems, utilising a specially selected fluid circulated down a closed-loop well via proprietary
systems that act as a down-hole heat exchanger.
Using proven oil and gas techniques and equipment to drill wells up to 5 kilometres deep,
higher temperatures can be accessed and brought to the surface. The required heat output
and the ground temperature gradient at the site determine the depth of the well.
Once installed and operational, the CeraPhiWell™ system requires minimal maintenance and
no further interventions. Notably, the system is fully sealed, with no interaction with belowground aquifers or permeable formations – and poses no potential hazard for unwanted
pollution. Unlike conventional geothermal projects, there is no need for fracking techniques,
which significantly reduces the risk of seismic events.
GREENVALE
ENERGY
LIMITED
11
These features of the CeraPhiWell™ technology greatly reduce the risk profile for geothermal
projects and increase confidence in their successful development and operation.
Geothermal Closed Loop Technology
Figure 42: CeraPhi Well co-axial down-hole heat exchanger system
Fluid is circulated through the system (blue) down to the heat exchanger (1) where
temperatures at the bottom of the well results in the conduction of thermal energy (red), which
is returned to the surface heat exchanger (2).
The thermal energy, in a controlled combination of pressure and temperature, is then routed
through the surface heat exchanger to another medium within the Organic Rankine Cycle
(ORC) plant. This energy expands into the ORC turbine (3), internally turning the generator to
produce electricity (4).
The hot fluid is then directed to the coolers (5), condensing into a cooler state and returning
to the surface heat exchanger (2), where the well circulation reheats it. Power is sent to the
substation (6) for transmission to the end user.
GREENVALE
ENERGY
LIMITED
12
The advantage of the Geothermal Closed-Loop Technology can also be found in the ASX
release dated 11 May 2023.
Ergon Connection Enquiry
In parallel with the engagement of CeraPhi Energy, Greenvale has also lodged a formal
connection enquiry with Ergon Energy regarding the potential for a geothermal energy plant
at Longreach.
Understanding the grid connection costs will allow Greenvale to assess the potential
commercial pathways available better if the Longreach permit proceeds to development.
The Greenvale team has also started investigating the possibility of private off-take partners
for any power generated at Longreach.
Relinquishment of Permits
Greenvale has decided to forego the extraction of sub-surface brines and associated
elements, including lithium, to focus exclusively on sustainable energy production as part of
its geothermal strategy. As a result, the Company has decided not to proceed with the
associated EPM applications and has relinquished the two permits that had been granted.
Additionally, after an internal review identified their limited geothermal potential, Greenvale
has withdrawn its EPG 2021 and EPG 2022 applications.
Moving forward, the Company will direct its resources towards two key projects: a small-scale
power generation initiative in Longreach and a potentially large-scale project in the Millungera
Basin. By focusing on sustainable energy production and utilising the latest technologies,
Greenvale is positioning itself as a leader in the drive towards a more sustainable and ecofriendly energy future.
Georgina Basin IOCG Project, Northern Territory
Activities during the June Quarter
Background
The Georgina Basin Project, owned by Knox Resources Pty Ltd (Knox), a company which is
20% owned by Greenvale. As part of its ownership of Knox, the Company is required to
contribute to the funding of its share of Knox’s future costs. Greenvale is entitled to a 2% net
smelter royalty (Royalty) for all Iron Oxide Copper Gold (IOCG) product exploited in the future
from the existing tenements owned by Knox.
Project Overview
Following is a brief overview of the Georgina Basin Project:
•
located in the highly prospective East Tennant province in the Northern Territory, the
Georgina Project comprises seven granted Exploration Licences and three under
application, for a combined total of approximately 4,500km2;
GREENVALE
ENERGY
LIMITED
13
•
the East Tennant province has been the subject of intense geoscientific investigation
by both Geoscience Australia and the Northern Territory Geological Survey for over
five years. Pre-competitive work undertaken as part of the Federal Government’s $225
million Exploring for the Future program (EFTF) included solid geology interpretation,
alteration proxy mapping and mineral prospectivity mapping for IOCG deposits; and
•
the collaborative MinEx CRC National Drilling Initiative, conducted in late 2020,
confirmed the highly prospective nature of the region by intersecting prospective host
rocks, IOCG-style alteration and sulphide mineralisation as part of a 10-hole program
at East Tennant.
IOCG deposits are typically large, economically attractive copper-gold deposits with some
smaller high-grade variants – most notably those at Tennant Creek. This style of deposit
contains elevated levels (10-60wt %) of the iron oxide minerals magnetite and hematite, which
gives rise to their (typically) elevated magnetic and gravity (density) properties.
Australian IOCG’s include the South Australian Olympic Dam, Prominent Hill, and
Carrapateena deposits, Ernest Henry in north-west Queensland, and the high-grade Northern
Territory Warrego and Juno deposits, located west of the Georgina Project at Tennant Creek.
Work During the Quarter
The following highlights occurred during the quarter:
During the quarter the Knox, commenced a gravity surveying across its highly prospective
Central Georgina Project tenement EL33375. The prospect-scale gravity survey is designed
to enhance gravity data resolution between recent drilling and previous National Drilling
Initiative drill-holes, as well as to align with coverage of the forthcoming Ambient Noise
Tomography (ANT) survey, which is one of two recently awarded Exploration Grants as part
of the NT Government’s Resourcing the Territory Geophysics and Drilling Collaborations
Program.
Figure 5. Georgina IOCG Project and general gravity survey Location
GREENVALE
ENERGY
LIMITED
14
Previous prospect-scale gravity surveying in this area, conducted by Greenvale (the previous
owner) resulted in the generation of three distinct IOCG targets, namely Banks, Leichhardt
West and Leichhardt East, all of which were drill tested in mid-late 2022. The drill-holes
intersected variably altered metasedimentary rocks, with assay results revealing significant
anomalism in copper, as well as uranium, silver and bismuth, which are known to be
associated with IOCG deposits.