Alpha Torbanite Project Update - Test Program Four
Released
Released
Announcement PDF
27 December 2023
ALPHA PROJECT DEVELOPMENT UPDATE
TEST PROGRAM FOUR DELIVERS FIRST INDICATION OF
BITUMINOUS PRODUCTS AS LICELLA COMPLETES
SUPERCRITICAL WATER PROGRAM
Significant milestones achieved as liquefaction test program nears completion
Key Points:
•
Technix, in collaboration with PROCOM, have provided an initial indication of
bituminous product potential from the bulk samples and this is considered to
be a highly significant development for the Alpha Torbanite Project.
•
LicellaTM supercritical water test program is now complete with results assisting
PROCOM and Monash University in their ongoing liquefaction test program.
•
Monash University program gathering momentum with 9 of 16 test runs now
complete and Test Program Four expected to be completed in early 2024.
Greenvale Energy Limited (ASX: GRV, “Greenvale” or “the Company”) is pleased to report
several positive developments and interim outcomes with the ongoing liquefaction test
program (Test Program Four) for its 100%-owned Alpha Torbanite Project in Queensland.
In a significant milestone for Test Program Four, Greenvale’s technical bitumen advisors,
Technix, have assessed the initial liquefaction bulk samples from PROCOM and separated
the remaining solids and the produced oil. Initial testing of that bulk oil indicates the potential
for the Alpha Project to supply bituminous products of commercial interest to market.
This is a highly significant development for the Project, noting that bitumen is generally
produced by blending suitable feedstock to achieve certain properties.
Technix has confirmed that the full range oil separated out from the bulk sample provided by
PROCOM has very promising properties. The asphaltene content of the produced oil extract
is higher than that of the standard bitumen at approximately 55% (55.3% heptane insoluble),
while the asphaltene content of standard bitumen is varies up to 25%.
Without any additives, the viscosity of the cannelite and torbanite extract from core samples
is similar to 60/70 penetration grade bitumen. However, the penetration is significantly less
and therefore the product is considered to be of high quality as a blend stock. With
respect to the Australian Standard, the crude extract classification assessed by Technix is
close to Class 600 bitumen, with its viscosity at 60C being slightly higher.
REGISTERED OFFICE:
Level 5, Suite 6 189 Kent Street, Sydney, New South Wales 2000 | GPO Box 2733, Sydney NSW 2001
+61 2 8046 2799 | admin@greenvaleenergy.com.au | www.greenvaleenergy.com.au
ABN
54
000
743
555
Class 600 bitumen refers to a specific grade of bitumen used for road construction and
pavement applications. The classification is determined based on various factors, including
penetration values, softening points and other rheological properties. These properties help in
specifying the suitability of bitumen for different climate conditions and road construction
requirements.
In general, higher-grade bitumen, such as Class 600, may attract a premium compared to
lower-grade bitumen such as Class 300. This premium is typically because higher-grade
bitumen often requires additional refining processes to meet specific performance
characteristics.
The observed extract requires further analysis and understanding of the blending potential
and/or the need for modification by Technix to satisfy the requirements of standard bitumen
used in road pavement applications. The early indications are extremely promising for a
high value product.
A second bulk sample was also prepared by PROCOM using an oil as carrier and
concentrating it over successive production batches. Analysis of this bulk sample at Technix
will begin in the New Year.
In addition to the study on bitumen properties from two bulk samples of products, a number of
other studies are focusing on the evaluation of Alpha drill core samples to establish whether
they will strongly convert to suitable oils under similar processing conditions to the successful
trials used in Test Programs 1 – 3 on outcrop samples. This work is being undertaken on both
oil and water as carriers for the liquefaction process. To date, the emphasis has been on the
use of water as the carrier.
LicellaTM has now completed its supercritical water program, marking another step forward in
Test Program Four under PROCOM direction. The information obtained from LicellaTM test
apparatus results has demonstrated the trends of increased conversion with Supercritical
density as reported in literature. Analysis of the results will providing sound input to the broader
based program being undertaken by Monash University to evaluate all the different seams in
four drill holes and optimise processing conditions.
Commenting on the latest advancements in Test Program Four, Greenvale CEO, Mark Turner,
said: “The news coming from both the Technix and Licella programs is highly positive and
moves us ever closer to the delivery of the maiden PFS for the Alpha Project.
“It is very exciting to have the first real indication of the potential commercial products that can
be produced from the Alpha Deposit. And while there is some way to go before, we have our
first bitumen certified, it is a big step in the right direction – a step towards eventual
commercialisation and achieving our goal of becoming Australia’s only end-to-end producer
of bituminous products.
“I would also like to thank the team at Licella for their work to date, investigating supercritical
water properties at different densities. Equipment limitations limited the supercritical density
to around 0.2 g/ml, with the high density of around 0.35g/ml being targeted in the Monash
University program. The results show good promise and directionally correlate with research
work by others which indicates further upside in yields and product type.
“Finally, with 9 out of 16 test runs now complete by Monash, I look forward to updating our
shareholders early in the New Year with the completion of Test Program Four.”
GREENVALE
ENERGY
LIMITED
2
Test Program 4 – Background:
Building on the successful outcomes of Test Program Three, which utilised outcrop samples,
Test Program Four has focused on investigating the liquefaction of drill core seams obtained
from the Alpha deposit. The ongoing testing involves a comprehensive array of studies being
coordinated by PROCOM and involving leaders in their respective fields. The program
encompasses diverse experiments being undertaken on core-derived samples, employing
liquefaction techniques with supercritical water (conducted by LicellaTM and Monash
University), liquefaction with oil as a carrier (performed by PROCOM and Monash University),
and bitumen assessments (carried out by Technix) on bulk samples generated by PROCOM
in a 7-litre Parr reactor using toluene and shale-derived oil as distinct carriers.
The primary aims of Test Program Four are threefold:
• First, to determine the experimental conditions that provide adequate production of
heavy oils (including, but not limited to, Pre-Asphaltene, Asphaltene and heavy oils
which can be utilized in making bitumen), understand the yield products generated and
the effectiveness of water as a carrier in oil shale liquefaction tests;
• Secondly, to use the results and insights from previous testing programs as a
benchmark to support the outcomes and enable comparisons between various
samples (outcrop and core of main seams); and
• Thirdly, to understand the heavy oils produced under different conditions to provide
market ready products.
The Alpha deposit consists of three major seams, with one Torbanite – LT seam located
between two Cannelite Coal seams, known as upper Cannel Coal – L1 and low Cannelite
Coal – L2. There is core available for the current programs from four drill holes available,
namely GM09CR, GM14C, GM21CR and GM28C (Figure 1).
Figure 1: Location of drill holes in deposit - Extract from SRK Consulting report.
GREENVALE
ENERGY
LIMITED
3
Technix Bitumen Assessment:
The recent tests conducted by Technix involved a 2.5L sample of cannelite and torbanite
processed extract derived by using toluene as the carrier for the Alpha Torbanite Project,
produced by PROCOM. The separation of derived oil from the carrier (toluene) and the
remaining reaction solids was comprehensive, involved homogenising the sample, heating,
filtration, toluene washes and separation of the remaining toluene solvent at 110°C, resulting
in a 100% heavy oil Alpha Shale derived extract.
Rigorous testing followed, encompassing dynamic viscosity, penetration, and asphaltene
content.
Test methods:
Dynamic viscosity: ASTM D2171 or equivalent Australian Standards
Penetration: ASTM D5. or equivalent Australian Standards
SARA Analysis: ASTM D3279 or equivalent Australian Standards
Results:
Results indicate a total residue of 900g after filtration (not fully dried) and a total crude extract
of 128g after solvent removal. Viscosity measurements at 60°C (887.00 Pas) and 135°C
(0.422 Pas). Penetration measured at 32 dmm, and Analysis showed 55.3% heptane insoluble
(asphaltene).
The above results are encouraging. However, toluene will not be used as a carrier in a
commercial plant, and it was used experimentally to allow easy separation of the produced
oils. Toluene will not play a role in the Alpha processing pathway on a large scale.
Consequently, the precise identification of products and determination of yields is not final but
directionally they a good indicative measure. The derived oil-based bulk sample analyses
which will soon follow will help close this loop.
Next Steps:
The second bulk sample will be separated and the oils analysed by Technix. This will require
a more involved separation procedure compared with the toluene-based product already
analysed. PROCOM has recommended distillation at atmospheric pressures and under
vacuum to split the oil carrier derived products. A vacuum cut at about 340C was suggested
to produce the base for bitumen analyses. Analysis of distillation products will provide insights
into the typical production process and will allow the evaluation of the heavier and the lighter
oils which can both be utilised in bitumen product formulations.
The methods used to separate out asphaltenes from the remaining shale solids will be
standardised according to good laboratory practices to ensure consistency in results and their
interpretation.
Additional analytical tests have been recommended, including TGA on liquid sample to provide
information on the oil components within a specific temperature range. TGA, Proximate and
Ultimate Analysis on the solids will identify any organic materials that may still be present and
further characterise the sample.
GREENVALE
ENERGY
LIMITED
4
LicellaTM Test Program:
Process:
The Licella Test Program was driven by PROCOM to better understand the impact of moving
from very small (0.1 litre) reactors (University equipment) to 2 litre. Licella has broad
experience in conducting such tests and was one of the main reasons they were chosen to
carry out this test program.
Borehole GM14 (see Figure 1) was selected for the experiments, with the objective of only
using one sample to investigate varying supercritical water densities. A proportioned-blended
sample, weighing 1kg, was cut from ground ore from the respective seams relative to the
thickness of the three seams of the Well 14. The refrigerated samples were initially prepared
by grinding the quartered core to approximately 200 microns, split, measured and blended.
The densities of the seams are assumed to be equal (SG range of 1.2 to 1.4) and so the
relative amounts of seams for a typical blend have been simplified to a direct relative
thickness. The utilisation of all three seams jointly would simplify mining and so it is assumed
for testing that the full face will be the typical feed to the processing plant.
Using this batch sample, only four (4) liquefaction runs were initially proposed at varying
supercritical densities as literature suggests improved yields at a critical density of about 0.35
g/ml. The study equipment is somewhat limiting and so only minor increments in density were
studied in this program however they were higher than precious test results from Test Program
3. Sufficient sample remains to undertake further tests if necessary to better understand the
seam. A suitable conversion >60% of the organic matter with over 20% to asphaltene or
materials which can be utilized in bitumen is the notional target.
The liquefaction reactions were carried out in a stirred batch autoclave reactor, with a capacity
of 2 litres. In a typical experiment, measured amounts of water and the powdered sample
(blend of L1, LT, L2) without catalyst were charged into the reactor for each run.
The reactor was purged and pressurized using nitrogen with the objective of achieving an
autogenic pressure of 220-250 bar at a desired temperature of 400 °C. The suggested initial
experimental pathway was to optimize and maximize the reactor fill volume to a safe level
such that a working pressure of 250 bar at 400 °C can safely be achieved (Table 2) under the
supercritical conditions.
Accordingly, the reactor was heated and the sample in the reactor stirred during the
experiment. Once the target temperature of 400oC is achieved, the temperature is then held
for around 30 minutes prior to cooling the system. For each test, the pressure and temperature
profiles were recorded during the experiments (Figures 6 – 9). After the cooling stage, gas
samples are taken, and the corresponding pressure and temperature were recorded and used
to estimate the gas evolution during the experiments.
The gas, liquid and solid products were separately collected for further analysis. In addition,
the cooling coil and stirrer of the rig system were rinsed with THF to dissolve any adherent
bio-oil and solids. The liquid/solid samples were held in suitable containers and dispatched to
Petrolab in SA, for further characterization. The gas sample was collected in a 3-litre canister
and sent to SGS lab in NSW for further analysis.
The liquefaction tests were conducted without using a catalyst on the basis of results from
previous tests using Outcrop material.
GREENVALE
ENERGY
LIMITED
5
Workflow:
The products from the autoclave reactor are a mixture of solids, water, oil and gas. Any heavy
oils produced tend to precipitate on the solids or adhere to the walls of the reactor as they are
not generally soluble in the water phase at normal conditions.
Figure 2 demonstrates the product analyses flowchart and analytical procedures. From each
test, a gas sample is preferably collected for GC analysis. The liquid (oil, water) is first
decanted from the solids (oily solids) and the components (liquids and solid) are analyzed
separately by a series of standard laboratory analyses. The water phase will also be analysed
in subsequent testing.
Figure 2: Workflow and analytical procedure
For the oily solids, Asphaltene (A) and Pre-asphaltene (PA) contents are extracted through a
sequence of Hexane, Toluene or Dichloromethane (DCM) and Tetrahydrofuran (THF)
washes. The separated oily solid is first washed with Hexane, the remaining insoluble
materials (Hexane Insoluble – HI) are separated by filtration and the Hexane soluble oil is
obtained after Hexane evaporation.
The resultant solids (Hexane Insoluble – HI) are further washed with Toluene (by Petrolab)
or/and dichloromethane (by Monash University). The collected solids are filtered out,
Toluene/DCM is evaporated, and asphaltene contents determined. Similarly, the remaining
solids (Toluene and DCM Insoluble) are rewashed using Tetrahydrofuran as solvent. The
solids (Tetrahydrofuran Insoluble) are collected by filtration, Tetrahydrofuran is evaporated
from the liquid and remaining solids and the pre-asphaltene content determined.
GREENVALE
ENERGY
LIMITED
6
Results:
Table 1: Summary of Licella Liquefaction Results (on as received basis)
Sample
ID
L-Test 1
L-Test 2
L-Test 3
L-Test 4
L-Test 5
1.
2.
3.
Sample
Type
Blend
Blend
Blend2
Blend
Blend3
W
(wt%)
7.59
7.59
7.59
7.59
G
(wt%)
7.79
6.76
8.44
6.03
5.92
O
(wt%)
17.28
24.23
A
(wt%)
3.01
2.37
PA
(wt%)
1.00
1.31
Residue
(wt%)
63.33
57.74
Conversion1
(wt%)
29.08
34.67
26.72
18.62
1.67
1.46
0.92
2.05
57.06
64.35
35.35
28.06
The conversion excludes water yield (wt%). [W – Water, G – Gas, O – Oil, A – Asphaltenes, PA – Pre Asphaltenes]
Results pending
5.92 wt% of gas was calculated assuming gas weight of 3g, test was aborted due to system leaks, so results are not
necessarily reliable.
Unfortunately, the majority of trials fell short of achieving a sufficiently high supercritical fluid
density of around 0.35g/ml as indicated in literature as an optimal for the conversion of the
torbanite, cannelite and blend samples. The target conditions include holding the reagents at
about 400oC for 30 minutes in the reactors of various sizes and methods of agitation.
The collective findings indicate that conversions ranging from 28 wt% to 35 wt% (Table 1) can
be achieved using water as a carrier under the conditions of the experiments. There is
potential for improved yields if the correct conditions can be found. Catalysts have also not
been investigated in this program.
Notably, LicellaTM's liquefaction tests attained the highest conversions, which are reporting
primarily as oil, with lower asphaltene and pre-asphaltene yields compared to Monash
University's tests utilising water as the carrier.
Gas yields of about 8 wt% on an as received basis appeared relatively consistent between
both testing programs with water as a carrier (results appear to be different when oil is used
as the carrier).
Tests of supercritical water densities (0.1-0.16g/ml) at the lower end of the optimal range
clearly indicate improved conversions with increasing density. Yields of pre/asphaltene
components are however low.
There are too few results available as yet to make a definitive call on the best conditions and
how the different seams affect yield with water as carrier. Further tests are planned with
Monash at higher Supercritical Densities across all of the 4 Wells.
PROCOM and Monash University will now take the findings of the LicellaTM supercritical water
program and integrate these findings into the ongoing work.
Finally, the intentional thoroughness in the current investigative phase is shared with all groups
participating in the program and is part of the Company's commitment to obtaining precise
and reliable data for the foundations of the maiden PFS for the Alpha Project.
The Company is confident that the comprehensive insights gained from these investigations
will significantly enhance the overall robustness of the PFS and strategically advance the
development of the Alpha Torbanite Project. The Company remains unwavering in its
dedication to delivering a project with the potential to create substantial long-term shareholder
value. Greenvale appreciates the support of it shareholders and is confident that the ongoing
meticulous efforts will contribute to the enduring success of the Alpha Torbanite Project.
GREENVALE
ENERGY
LIMITED
7
AUTHORISED FOR RELEASE:
The Board of Greenvale has approved this announcement for release.
FOR FURTHER DETAILS, CONTACT:
Mark Turner, CEO, 0459 519 999
MEDIA INQUIRIES:
Nicholas Read
Read Corporate
Nicholas@readcorporate.com.au
Mobile: 0419 929 046
Competent Person’s Statement:
The information in this report that relates to Metallurgical and Bitumen results is based on
information compiled by Paul Griffin, a Competent Person who is a Member of The
Australasian Institute of Mining and Metallurgy AusIMM Member number 100234. Paul Griffin
has sufficient experience that is relevant to the processing and testing of the bituminous and
related materials under consideration and to the activity being undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’. Paul Griffin consents to the
inclusion in the report of the matters based on his information in the form and context in which
it appears.
GREENVALE
ENERGY
LIMITED
8
FUTURE STATEMENTS
Statements contained in this release are or may be forward looking statements. Such
statements relate to future events and expectations and as such involve known and unknown
risks and significant uncertainties, many of which are outside the control of Greenvale. Actual
results, performance, actions and developments of Greenvale Energy may differ materially
from those expressed or implied by the forward-looking statements in this release. Such
forward looking statements speak only as of the date of this release. There can be no
assurance that actual outcomes will not differ materially from these statements. A number of
important factors could cause actual results or performance to differ materially from the
forward-looking statements. Investors should consider the forward-looking statements
contained in this release in light of those disclosures. To the maximum extent permitted by law
(including the ASX Listing Rules), Greenvale and any of its affiliates and their directors,
officers, employees, agents, associates and advisers disclaim any obligations or undertaking
to release any updates or revisions to the information in this release to reflect any change in
expectations or assumptions; do not make any representation or warranty, express or implied,
as to the accuracy, reliability or completeness of the information in this document, or likelihood
of fulfilment of any forward-looking statement or any event or results expressed or implied in
any forward-looking statement; and disclaim all responsibility and liability for these forwardlooking statements (including, without limitation, liability for negligence). Nothing in this
document will under any circumstances create an implication that there has been no change
in the affairs of Greenvale since the date of this release.
GREENVALE
ENERGY
LIMITED
9
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Sampling techniques
Drilling techniques
GREENVALE
Nature and quality of sampling (e.g., cut channels,
randomchips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as downhole gamma sondes, or
handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done; this
would be relatively simple (e.g., ‘reverse circulation drilling
was used to obtain 1 m sample from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases, more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.,
submarine nodules) may warrant disclosure of detailed
information.
Drill type (e.g., core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc.) and
details (e.g., core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit, or other type, whether
core is oriented and if so, by what method, etc.).
ENERGY
LIMITED
Commentary
The samples refer to in this announcement were taken from the 2021 partly
cored (4C – 100mm diameter) hole drilling program on a nominal 250 x 250m
grid for the purpose of obtaining torbanite and cannel coal quality samples
from the Upper and Lower seams.
Refer to ASX Announcement date – 9 March 2022.
Not applicable to this announcement.
10
Criteria
JORC Code explanation
Drill sample recovery
Logging
GREENVALE
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc.) photography.
The total length and percentage of the relevant
intersections logged.
ENERGY
LIMITED
Commentary
Not applicable to this announcement
Refer to ASX Announcement – 9 March 2022
11
Criteria
JORC Code explanation
Sub-sampling techniques
and sample preparation
Quality of assay data and
laboratory tests
Verification of sampling
and assaying
GREENVALE
Commentary
If core, whether cut or sawn and whether quarter, half or
all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc.
and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected, including
for instance results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to the grain size of
the material being sampled.
Sampling and handling of the bituminous material in the laboratory was done
in accord with standard techniques used in the Bitumen and roading
industries
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the technique
is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of bias)
and precision have been established.
The bituminous material testing was to standards and procedures recognised
by international government roading agencies and done under the overview
of the Competent Person
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Torbanite and cannel coal were verified by SRK personnel before inclusion in
the geological model and resource estimate and representative samples
provided to Technix.
ENERGY
LIMITED
12
Criteria
JORC Code explanation
Location of data points
Data spacing and
Orientation of data in
relation to geological
Sample security
SRK has prepared a geological model of this deposit with all available drill hole,
survey and high-resolution LIDAR data. Refer to ASX Announcement – 9 March
2022 and 13 November 2023.
There is high confidence in the location of data points associated with this
announcement.
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to Not applicable to this announcement
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
distribution
structure
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Commentary
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this
is known, considering the deposit type.
Not applicable to this announcement
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed
and reported if material.
The measures taken to ensure sample security.
All core samples are secured at Stratum Reservoir laboratories at Brendale Qld.
The sample handling and record keeping at the Bitumen laboratory is done to
recognised standards used in the bitumen and road surfacing industry.
Audits or reviews
GREENVALE
The results of any audits or reviews of sampling techniques
and data.
ENERGY
LIMITED
Not applicable to this announcement.
13
Section 2 Reporting of Exploration Results
(Criteria listed in section 1 also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral tenement and land Type, reference name/number, location and ownership MDL 330 is held by Alpha Resources Pty Ltd, a subsidiary of Greenvale Energy
including agreements or material issues with third parties Limited. MDL 330 was first granted on 1 February 2002.
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or national The current 5-year term for MDL 330 expires on 31 January 2027.
park and environmental settings.
The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to
operate in the area.
tenure status
Exploration done by other Acknowledgment and appraisal of exploration by other Refer to ASX Announcement – 9 March 2022 and 13 November 2023.
parties.
parties
Geology
Deposit type, geological setting and style of mineralisation.
Drill hole
Share your feedback
Discover