Half Yearly Report and Accounts
Released
Released
Announcement PDF
GREENVALE ENERGY LIMITED
A.B.N. 54 000 743 555
INTERIM FINANCIAL REPORT
HALF-YEAR ENDED
31 DECEMBER 2023
GREENVALE ENERGY LIMITED
A.B.N. 54 000 743 555
TABLE OF CONTENTS
Corporate Directory
2
Directors’ Report and Review of Operations
3
Auditor’s Independence Declaration
20
Condensed Consolidated Statement of Profit or Loss and Other Comprehensive
Income
21
Condensed Consolidated Statement of Financial Position
22
Condensed Consolidated Statement of Changes in Equity
23
Condensed Consolidated Statement of Cash Flows
24
Notes to the Condensed Consolidated Financial Statements
25
Directors’ Declaration
39
Independent Auditor’s Review Report
40
1|G R V – I n t e r i m R e p o r t 2 0 2 3
GREENVALE ENERGY LIMITED
A.B.N. 54 000 743 555
CORPORATE DIRECTORY
DIRECTORS
Neil Biddle (Non-Executive Chairperson)
Elias (Leo) Khouri (Non-Executive Director)
Mark Turner (Executive Director)
COMPANY SECRETARIES
Kurt Laney
Vince Fayad
REGISTERED OFFICE
Suite 6, Level 5, 189 Kent Street
SYDNEY NSW 2000
Ph: +61 (7) 3709 8000
SHARE REGISTRY
Link Market Services
Level 12, 680 George Street
Sydney NSW 2000
Ph: +61 1300 554 474
Fax: +61 (2) 9287 0303
AUDITORS
RSM Australia Partners
Level 13, 60 Castlereagh Street
Sydney NSW 2000
STOCK EXCHANGE
Australian Securities Exchange
Exchange Centre
20 Bridge Street
Sydney NSW 2000
ASX CODE
GRV
2|G R V – I n t e r i m R e p o r t 2 0 2 3
GREENVALE ENERGY LIMITED
A.B.N. 54 000 743 555
DIRECTORS’ REPORT AND REVIEW OF OPERATIONS
The Directors present this report together with the financial statements of Greenvale Energy
Limited (“Greenvale” or “the Company”) and its consolidated entities (the “Group”) for the
half year ended 31 December 2023 (“Half Year-2023”) and the auditors’ review report thereon.
DIRECTORS
The names of the Company’s directors in office during the Half-Year 2023 and until the date
of this report are set out below. Directors were in office for the entire period, unless otherwise
stated:
•
•
•
Neil Biddle (Chairperson and Non-Executive Chairperson)
Elias (Leo) Khouri (Non-Executive Director)
Mark Turner (Managing Director)
PRINCIPAL ACTIVITIES
The Group’s principal activity during the Half-Year 2023 was the exploration and development
of mineral resources in Queensland, Australia.
During the Half-Year 2023, the Company, via its wholly owned subsidiary Greenvale Gas Pty
Ltd, announced that had entered into a Farm-in agreement for the acquisition of a 75% interest
in tenement EP-145, a potential high-grade hydrogen and helium deposit in the Amadeus
Basin, Northern Territory. The Farm-in agreement for the project, which was executed on 17
October 2023 with Mosman Oil and Gas Ltd (Mosman), remains subject to Ministerial Consent
to approve the transfer of operator rights and title; and
With the exception of the above, there were no significant changes in the nature of the Group's
principal activities during the Half-Year 2023.
RESULT AND REVIEW OF OPERATIONS
The loss for the Group after income tax for the six months to December 2023 amounted to
$1,439,781 (December 2022: loss of $2,320,874) and the net assets of the Group were
$9,459,076 (June 2023: $10,410,289).
No dividends were declared or paid during the Half-Year 2023 (2022: $nil).
EVENTS SUBSEQUENT TO REPORTING DATE
Events that have occurred since the end of the period include:
•
on 11 January 2024, Astute Metals NL (ASX: ASE) (‘Astute’) (being the 80% owner of
the Knox Resources Pty Ltd, with Greenvale owing the remaining 20% interest)
announced the results from geophysical modelling conducted at the Georgina Basin
‘Leichhardt East’ prospect.
Such modelling confirmed the presence of a highly prospective new IOCG target, which
was supported previous drilling conducted by Astute in 2023 that intersected the presence
of key IOCG pathfinder metals (such as uranium, bismuth, and copper).
•
on 24 January 2024, the Company announced that due to delays in obtaining ministerial
approvals to change the ownership title and the operating rights relating to project EP145, both the Company and Mosman had agreed to vary the terms entered into under the
3|G R V – I n t e r i m R e p o r t 2 0 2 3
GREENVALE ENERGY LIMITED
A.B.N. 54 000 743 555
farm-in agreement dated 17 October 2023. This resulted in the end date required for the
receipt of approvals being varied from 31 January 2024 to 31 March 2024.
•
on 29 January 2024, the Company announced that it would be disposing of its 20%
interest in the Georgina IOCG Exploration Project to Astute. The Company’s disposal of
Knox represented its strategic focus on becoming a sustainable producer of bitumen and
a significant participant in the renewable energy sector.
Other than the above, there has not been any other matter or circumstance occurring
subsequent to the end of the Half-Year 2023 that has significantly affected or may significantly
affect the operations or affairs of the Group in future financial years.
REVIEW OF OPERATIONS
FINANCIAL
Revenue
The following revenue amounts were received by the Company during the Half-Year ended
31 December 2023:
the Company derived interest income on its short-term interest-bearing deposits held
during the Half-Year 2023 of $2,877 (2022: $5,650).
Net expenses and impairment
The following expenses were incurred by the Company during the Half-Year 2023:
due diligence expenses of $80,000 incurred in relation to the assessment of
exploration projects (2022: $85,264);
equity settled payments made in respect to the performance of directors and key
management personnel of $471,568 (2022: nil); and
ongoing administration expenses of $660,391 at December 2023 (2022: $893,659).
Included in the Company’s Half-Year 2023 administration expenses are key
management personnel costs, as well as compliance and regulatory costs.
Statement of financial position
During the 2023 Half-Year the following key items occurred:
cash decreased from $5,164,007 at 30 June 2023 to $3,235,749 at 31 December 2023.
This decrease was primarily caused by costs associated with the Company’s ongoing
exploration activities, which included amounts paid in relation to the delivery of the
maiden Pre-Feasibility Study (PFS) for the Alpha Torbanite Project; and
trade and other payables decreased from $340,572 at 30 June 2023 to $190,413 at
31 December 2023. The cause of this decrease was due to costs that had been
incurred in relation to the Alpha Phase 2 Expansion Drilling program, which had not
been paid by 30 June 2023.
Cash flow
The cash flow for the 2023 Half-Year of the Company included the following key items:
a decrease in exploration costs from $1,692,707 in December 2022 to $1,577,507 in
December 2023. This decrease was caused by the partial disposal of Knox to Astute,
4|G R V – I n t e r i m R e p o r t 2 0 2 3
GREENVALE ENERGY LIMITED
A.B.N. 54 000 743 555
noting the Company was only required to fund 20% the Knox exploration activities after
28 November 2022; and
an decrease in administrative costs from $1,297,515 at December 2022 to $740,182
at December 2023. The December 2023 Half-Year administrative costs were
comprised of payments for:
• due diligence costs incurred in relation to the assessment of potential
exploration project opportunities presented to the Company; and
• statutory costs incurred in relation to the compliance and listing requirements
of the Company.
CORPORATE
Directors
During the 2023 Half-Year, there was no change in the directorships of the Company.
Management
During the 2023 Half-Year, there was no change in the management of the Company.
Research and Development Grant
During the 2023 Half-Year, the Company received a $0.465 million R&D Tax Incentive Rebate
for the 30 June 2022 financial year income tax. This grant strengthened the Company’s
balance sheet and reflects the innovative work that has been put into the development of the
Alpha Torbanite Project.
Capital raising
On 13 November 2023, the Company issued 7,453,125 fully paid shares to Pioneer Resources
Limited (Pioneer) at a price of $0.064 cents per share. The issuance of such ordinary shares
reduced the amount owing to Pioneer by $477,000.
OPERATIONS
ALPHA TORBANITE PROJECT, QLD
The Alpha Torbanite Project is located approximately 50km south of the town of Alpha in
Central Queensland, Australia.
The deposit consists of two seams, an upper seam of mostly lower-grade mineralisation with
an average thickness of 1.12m and a lower seam containing lenses of torbanite up to 1.9m
thick. The Project has been subject to extensive exploration and laboratory testing since its
initial discovery in 1939.
In the 2022 financial year, the Company received Modified Fischer Assay (MFA) results for
Alpha, which improved significantly on previously unverified historical oil yield ranges
published for the deposit. These results increased the Company’s confidence in the
commercial exploitability of the project and demonstrated that the Alpha Project ranks
amongst the highest-yielding deposits in the world when compared with similar style deposits
(Table 1).
The oil yield values for the 12 Alpha samples (Figure 2) were all extremely positive and were
either in line with or above expectations.
5|G R V – I n t e r i m R e p o r t 2 0 2 3
GREENVALE ENERGY LIMITED
A.B.N. 54 000 743 555
Figure 1: Location of the Alpha Torbanite Project
Figure 2: Comparison of MFA results
between Torbanite and Cannel Coal samples
Oil Yield (LTOM)
Torbanite/Coal/
Oil shale
Range
Average
Torbanite
50 - 620
420
Cannel coal
50 - 150
120
Green River (USA)
Oil shale
45 - 460
135
Rundle, Qld
Oil shale
50 - 200
105
Stuart, Qld
Oil shale
50 - 220
94
Duaringa, Qld
Oil shale
50 - 130
82
Condor, Qld
Oil shale
50 - 120
65
Julia Creek, Qld
Oil shale
50 - 100
60
Deposit
Alpha, Qld
Table 1: Comparative data of various oil shales
6|G R V – I n t e r i m R e p o r t 2 0 2 3
GREENVALE ENERGY LIMITED
A.B.N. 54 000 743 555
Commercialisation Strategy – Liquification
During the 2023-Half Year, the Company made considerable advances in its
commercialisation strategy for the Alpha Torbanite Deposit (Alpha), as it looked to deliver a
Pre-Feasibility Study (PFS) for the project.
As announced by the Company on 22 September 2021, the Company initially designed a
commercialisation strategy for Alpha to incorporate a “green” power generation model, aiming
to become a long-term provider of power into the local power grid from a 100MW solar and
gas-fired hybrid power station. However, after extensive retort testing was conducted on
samples obtained from the Company’s core hole program (completed in June 2021), it was
considered that a traditional retorting would not deliver the optimal product yields.
In light of these results, the Company revisited its geological modelling and test retort work for
Alpha. Based on this review, the Company announced on 24 August 2022 that ‘liquefaction’ –
an alternate processing route – had been tested and generated the necessary heavy oil
fractions required for bitumen production.
Prior to the commencement of the 2023-Half Year, the Company completed the first three (of
four) test programs in respect its liquefaction strategy. Further information concerning the
results of the first three test programs can be found within the Company’s announcements
made to the ASX between August 2022 and May 2023.
Test Work Four Commencement
With the successful completion of test program three in May 2023, the Company immediately
commenced preparations to undertake the final stage of its liquefaction strategy test work,
being Test Work Program Four (Test Work Four).
On 23 August 2023, the Company announced the design of Test Work Four, noting that it
would deliver processing pathways and a potential product suite that would be incorporated
into Alpha’s PFS. Specifically, Test Work Four was designed to encompass three distinct
assessments, using a combination of samples relied upon during the first three liquefaction
test programs, and also samples from the Company’s Stage 2 drilling program (completed on
2 October 2023).
The three assessments required for Test Work Four are outlined under Figure 3 and are
summarised as follows:
•
Assessment 1: employing liquefaction techniques using supercritical water, which is
to be managed by Licella Holdings Ltd (Licella) and Monash University (Monash);
•
Assessment 2: liquefaction with oil as a carrier, which is to be managed by PROCOM
Consultants Pty Ltd (PROCOM) and Monash; and
•
Assessment 3: bitumen identification and certification by Technix Industries Limited
(Technix) on bulk samples provided by PROCOM and Monash.
7|G R V – I n t e r i m R e p o r t 2 0 2 3
GREENVALE ENERGY LIMITED
A.B.N. 54 000 743 555
Figure 3: Greenvale's Liquefaction Test Program Flow Chart
Further information concerning the purpose and progress made during the 2023 Half-Year in
respect to each of the above assessments is as follows:
Monash (Liquefaction testing using Oil Carrier/Super Critical Water on core Samples)
Monash’s engagement under Test Work Four involves verifying the Former Test Work
results obtained by conducting a series of tests on the drilling core samples and having
these placed under processing conditions that were similar to that of the outcrop
material used in the Former Test Work. By doing this, the Company will be able to
evaluate the different seams that comprise of the Alpha deposit and determine the
optimal processing conditions. In order to do this, Monash will analyse the use of both
oil and water as a carrier for the liquefaction process.
Monash are conducting test work on the core samples obtained from its drilling
program (16 tests in total). During the 2023 Half-Year, Monash completed 9 of 16 test
runs on the core samples, which were sent to PROCOM for further analysis. In
addition, Monash has been tasked with producing a one-litre bulk sample of oils using
oil as a carrier, which is to be sent to Technix for product analysis.
Licella (Supercritical Water Scoping Study)
For the purposes of undertaking further evaluation of water as a carrier for the
liquefaction process, Licella has been tasked with preparing a scoping study (at a batch
level) to better define the yield and structure of sample products. To do this, Licella will
utilise variations of supercritical water processing techniques with the aim of
8|G R V – I n t e r i m R e p o r t 2 0 2 3
GREENVALE ENERGY LIMITED
A.B.N. 54 000 743 555
determining the optimal conditions for simplifying the processing requirements of the
Alpha deposit.
The Licella program has been designed to undertake four liquefaction runs on one core
hole sample (Borehole GM14), at varying supercritical densities (see Figure 4).
Previous liquefaction testing conducted by the Company has been undertaken by
using a small reactor (0.1 litre). However, Liecella’s testing will be required to be
performed in a larger sized, autoclave reactor (2 litres) for the purposes of achieving
the desired reactions. This includes the use of pressurized nitrogen for the purposes
of achieving an autogenic pressure of 220-250 bar and a desired temperature of 400
°C.
Figure 4: Location of drill holes in deposit - Extract from SRK Consulting report.
On 2 October 2023, the Company announced that Licella had completed the first
supercritical water test run, with such samples subsequently sent to Petrolab Australia
Pty Ltd for analysis. Further, on 27 December 2023 the Company announced that
Licella had completed the remaining three liquefaction runs.
Consistent with the Company’s initial views, the information obtained from Licella’s test
work demonstrated a trend of increased conversion from the supercritical densities.
Unfortunately, most of the trials undertaken fell short of achieving a sufficiently high
supercritical fluid density of 0.35g/ml, which is regarded as an optimal density for the
conversion of torbanite, cannelite and blend samples.
Licella’s findings indicated that conversions ranging from 28 wt% to 35% wt can be
achieved using water as a carrier under the conditions of the experiments, with the
potential for increased yields if the optimal conditions can be determined. Notably,
Licella’s liquefaction tests attained the highest conversions, which reported the
primarily as oil, with lower asphaltene and pre-asphaltene yields compared to
Monash’s test utilising water as the carrier. However, there are too few results available
at this stage to make a definitive call on the best conditions for optimising yields and
conversions.
9|G R V – I n t e r i m R e p o r t 2 0 2 3
GREENVALE ENERGY LIMITED
A.B.N. 54 000 743 555
Moving forward, analysis of the results from Licella’s test work will be used to provide
sound input into the broader based program being undertaken by Monash University.
PROCOM/Monash and Technix (Bulk Sampling Production and Product Identification)
To determine the bituminous product potential for the Alpha deposit, PROCOM and
Monash were engaged to produce liquefaction bulk samples for testing. Such samples
are sourced from the drill core that was obtained from the drilling program for the
different seams within Alpha. Technix, who is responsible for the testing of the
samples, is thereafter required to determine the potential of the Alpha deposit for
bituminous products.
On 23 October 2023, the Company announced that PROCOM produced the first bulk
samples (5.0 litres) for independent assessment by Technix. On 27 December 2023,
Technix delivered its assessment for this bulk sample and this indicated promising
properties for bituminous potential. Notably, testing showed the potential for highquality bituminous products that contained properties which closely aligned with Class
600 bitumen - a premium-grade bitumen suitable for road construction.
Technix also provided the following initial observations from the first bulk samples
provided by PROCOM:
•
the asphaltene content of the produced oil extract is higher than that of the
standard bitumen at approximately 55% (55.3% heptane insoluble);
•
the asphaltene content of standard bitumen varies up to 25%; and
•
the viscosity of the cannelite and torbanite extract from core samples is similar
to 60/70 penetration grade bitumen with its viscosity at 60C being slightly
higher.
A second bulk sample was prepared by PROCOM in December 2023 and used oil as
a carrier. This sample will undergo a detailed analysis by Technix in early 2024 and
will require a more involved separation procedure compared to the first bulk sample
test. By doing so, this will provide the Company with insights into the evaluation of
heavier and lighter oils that can both be utilised in bitumen product formulations.
Monash Bulk are also producing a one-litre bulk sample of oils using oil as a carrier,
which is to be sent to Technix for product analysis.
Next Steps
Upon conclusion of Test Work Four for the Alpha deposit, the Company expect that it will be
able to:
•
determine the optimal experimental conditions that provide adequate production of
heavy oils (including, but not limited to, Pre-Asphaltene, Asphaltene and heavy oils);
10 | G R V – I n t e r i m R e p o r t 2 0 2 3
GREENVALE ENERGY LIMITED
A.B.N. 54 000 743 555
•
use the results and insights from previous testing programs as a benchmark to support
the outcomes and enable comparisons between various Alpha deposit samples
(outcrop and core of main seams); and
•
understand the heavy oils produced under different conditions to provide market ready
products.
Completion of Alpha Phase Two Drilling
In June 2023, the Company announced that it had commenced the second phase of drilling
at the Alpha Torbanite Project. The drilling campaign was designed to increase the size and
confidence level in the former Inferred JORC Mineral Resource (18.6 million tonnes) for the
Alpha deposit.
On 2 October 2023, the Company completed the Phase Two drilling at the Alpha Torbanite
Project. The program comprised of 20 HQ core holes for a combined depth of 1,053 metres,
with 16 cores from the upper/lower seams and 4 cores from only the lower seam collected
(see Figure 4).
The associated data from the Phase Two program was used the purposes of updating the
JORC Mineral Resource Estimate (MRE), which was announced on 13th November 2023.
Mineral Resource Estimate
Upon completion of the Phase 2 core drilling programme completed for Alpha in October 2023,
the Company engaged SRK Consulting Australasia Pty Ltd (SRK) for the purposes updating
the Alpha deposit’s Mineral Resource Estimate (MRE), which was delivered in in March 2022.
As part of this program, SRK was required to verify the torbanite and cannel coal results
obtained from the Phase 2 core drilling, with follow-up assaying submitted for testing with ALS
Coal Laboratories.
The Company’s updated MRE for the Alpha Torbanite Project yielded the following results:
9.4Mt (or 51%) increase in the total size of the Inferred Resource for the project, being
an increase from 18.6Mt in the maiden 2022 to 28Mt of combined cannelite and
torbanite; and
synthetic oil equivalency of the deposit improved, adding 6.4 million barrels for a total
of 27.7 million barrels of synthetic oil equivalent.
The updated JORC Mineral Resource Estimate for the Alpha Deposit is set out in Table 2 and
Table 3 below, with the Inferred Resource Area shown in Figure 5:
11 | G R V – I n t e r i m R e p o r t 2 0 2 3
GREENVALE ENERGY LIMITED
A.B.N. 54 000 743 555
Table 2: MDL 330 Inferred Mineral Resource Estimate by seam and ply unit (plus % +/- from maiden MRE)
Seam
/Ply
Area
(m2)
Volume
(cu m)
Waste
Thickness
(m)
Waste
Volume
(bc m)
Tonnes
(Air Dried)
% +/(Air Dried)
Tonnes
(Dry)
Tonnes
(In Situ)
U
5,199,146
5,409,700
21
181,383,104
6,491,640
+97%
6,653,931
6,437,543
L1
9,056,464
10,548,503
16
142,970,480
12,995,530
+64%
13,291,114
12,869,174
LT
6,774,137
3,635,190
0
157,694
4,301,324
-6.4%
4,325,876
4,289,524
L2
8,684,433
3,465,159
0
41,993
4,267,732
+49%
4,366,100
4,192,842
Total
28,056,227
+51%
28,637,021
27,789,083
Inferred Dry
Seam
/Ply
Tonnes (Mt)
% of Total
Synthetic
Oil
% of Total
Oil Yield
LTOM
No. of Drill
Holes
(MMboe)
U
6.7
23%
4.4
16%
105
2
L1
13.3
46%
8.7
31%
104
4
LT
4.3
15%
10.7
39%
395
4
L2
4.4
15%
3.8
14%
140
4
Total
28.6
100%
27.7
100%
154
6
Table 3: MDL 330 preliminary volumetrics for Mineral Resource estimate
In addition to the above results, it is noted that there was considerable potential for further
improvements to MRE results due to:
the synthetic oil equivalency estimations were calculated utilising yield estimations
from the standardised Modified Fischer Assay (MFA) results - reported by the
Company back in December 2021. Such results are likely to improve following
completion of the Test Work Four liquefaction testing, which is due in early 2024;
the updated mineral resources were estimated for each of the modelled piles for which
there are reasonable prospect for economic extensions. As such, mineral resources
included within the updated MRE were limited to the area within MDL 330 and does
not include any extension for permit EPM 27718, which neighbours MDL 330; and
a 15-hole chip reconnaissance drilling program has been scheduled to commence in
the 2024 calendar year to facilitate the delineation of potential extensions of the
resource outside the geological model area. It is hoped that this program will improve
on the reported MRE results.
The above results are seen by the Company as a key step towards the commercial
development of the Alpha deposit.
12 | G R V – I n t e r i m R e p o r t 2 0 2 3
GREENVALE ENERGY LIMITED
A.B.N. 54 000 743 555
Figure 5: Inferred Resource Area at Alpha Torbanite Project, QLD
GEOTHERMAL
The Company’s geothermal portfolio comprised applications for six Exploration Permits for
Geothermal (EPG) located within central and north-western Queensland, Australia.
Of the Company’s geothermal licences, three licences are located within the highly
prospective Millungera Basin (EPG 2023 (Julia Creek), EPG 2024 (Lara Downs) and
EPG2025 (Ouchy)). The Millungera applications are located approximately 120km east of
Mount Isa within the North-West Minerals Province (Figure 6). They lie in the catchment of the
13 | G R V – I n t e r i m R e p o r t 2 0 2 3
GREENVALE ENERGY LIMITED
A.B.N. 54 000 743 555
$1.7 billion CopperString 2023 project, which will connect remote parts of north-western
Queensland to existing power infrastructure in Townsville.
An independent study conducted by the Geological Survey Queensland (GSQ) in June 2018
has highlighted the Millungera Basin to be the most prospective geothermal site in Australia,
believed to have stored thermal energy likely to exceed 611,000 petajoules.
Moving forward the company will direct its focus on two key projects at Millungera and
Longreach. After an internal review identified that there is limited geothermal potential, the
company has withdrawn it EP 2021 (Winton) and EP2022 (Quilpie) applications.
Additionally, the Company’s geothermal projects will enable the Company to develop a carbon
offsetting strategy, thereby providing sufficient carbon credits to offset future production at the
Alpha Torbanite Project.
Geothermal Feasibility Study - Longreach
An independent assessment conducted by Ascendience Geoscience (Ascendience) in
September 2022 confirmed the presence of an inferred geothermal resource within the
Millungera Basin, with a total stored thermal energy potential likely to exceed 611,000
petajoules at a 90% probability.
Following on from Ascendience’s assessment, the Company engaged CeraPhi Energy
(CeraPhi) to conduct a feasibility study for the Company’s Longreach Geothermal Project in
North Queensland. CeraPhi was selected by the Company to undertake the feasibility study
due to its proprietary patents which use a closed-loop geothermal technology, known as
CeraPhiWellTM.
On 4 October 2023, the Company announced the results of this desktop feasibility study which
demonstrated the effectiveness of the CeraPhiWellTM down-hole heat exchanger technology
in providing the required heat for a 4.95MWe plant in the Longreach region. However, CeraPhi
concluded that the economic viability for geothermal exploration below a 3,000m depth was
limited for a small-scale operation.
In response, Greenvale decided to shift its focus to the Millungera Basin, due to its large-scale
regional power requirements and target depths of between 2.5 to 3 kms. The shift in focus
aligns with the Company’s strategic decision to explore opportunities aligned with large-scale
geothermal power needs and economic feasibility.
The Company is optimistic about the potential of the CeraPhiWellTM technology in the
Australian landscape, which is reflected in its decision to move onto the Millungera Basin.
Native Title - Millungera Basin
During the 2023 Half-Year, the Company engaged in discussions with the Mitakoodi and Mayi
People for the purposes of ratifying a Native Title Agreement for licences EPG 2023, EPG
2024, and EPG 2025. By obtaining such access agreements, the Company will be able to
undertake its an exploration work program within the Millungera Basin, which includes a sub-
14 | G R V – I n t e r i m R e p o r t 2 0 2 3
GREENVALE ENERGY LIMITED
A.B.N. 54 000 743 555
surface review to identify any drilling risks and define the subterranean stratigraphy more
accurately.
Discussions between the Company and the Native Title groups remain ongoing. However, the
Company is confident of obtaining the necessary approvals within the near future.
Figure 6: Map of northwest Queensland showing the interpreted subsurface distribution of the
Millungera Basin. Also shown are Geoscience Australia and industry seismic lines, as well as key
historic drillholes.
15 | G R V – I n t e r i m R e p o r t 2 0 2 3
GREENVALE ENERGY LIMITED
A.B.N. 54 000 743 555
GEORGINA BASIN IOCG PROJECT, NT
Located in the highly prospective East Tennant province in the Northern Territory, the
Georgina Basin Project is 20% owned by Greenvale, with the remaining 80% owned by Astute
Metals NL (ASX: ASE). The Project comprises of seven granted exploration licences, and a
further three currently under application, for a combined area of approximately 4,500km2
(Figure 7). The Georgina Basin Project and associated tenement licences are held by a
company called Knox Resources Pty Ltd (Knox).
The East Tennant Province has been the subject of intense geoscientific investigation by both
Geoscience Australia and the Northern Territory Geological Survey over the last five years.
Pre-competitive work undertaken as part of the Federal Government’s $225 million “Exploring
for the Future” Program (EFTF) included solid geology interpretation, alteration proxy mapping
and mineral prospectivity mapping for Iron Oxide Copper Gold (IOCG) deposits. The
collaborative MinEx CRC National Drilling Initiative, conducted in late 2020, confirmed the
highly prospective nature of the region by intersecting prospective host rocks, IOCG-style
alteration and sulphide mineralisation as part of a 10-hole program at East Tennant.
Figure 7. Georgina IOCG Project tenements and Geoscience Australia mineral potential ‘heat map’, with hotter
colours indicating greater prospectivity, noting the Ranken Project tenements EL32285 and EL32286 to the far
east of the Project
Co-Funding Grants
During the 2023 Half-Year, Knox was awarded two co-funding grants through the Geophysics
and Drilling Collaborations (GDC) program, which is administered by the Northern Territory
Geological Survey (NTGS).
16 | G R V – I n t e r i m R e p o r t 2 0 2 3
GREENVALE ENERGY LIMITED
A.B.N. 54 000 743 555
Knox took part in the Round 16 Geophysics and Drilling Collaborations program, with the
following successful applications having been made:
Grant 1: $100,000 for ANT survey on Central