Next phase of exploration underway at Oasis
Released
Released
Announcement PDF
ASX Release 21 October 2025
Interactive Investor Hub - Engage directly with the Company through our Investor hub, you can ask questions, review
comments and get direct access to the Company – follow the link greenvaleenergy.com.au/announcements
Greenvale Energy Limited ABN 54000743555 W: greenvaleenergy.com E: admin@greenvaleenergy.com.au
Perth: Level 1, 1 Alvan St, Subiaco, 6008 Brisbane: Suite 5-Level 12, 10 Market St, Brisbane 4000 Page | 1
NEXT PHASE OF EXPLORATION UNDERWAY TARGETING KEY
GROWTH OPPORTUNITIES AT OASIS URANIUM PROJECT
Greenvale Energy Limited ASX: GRV (“Greenvale” or “the Company”) is pleased to advise that
the next phase of exploration is underway to unlock the broader potential of its Osis Uranium
Project in Queensland, with recently acquired magnetic and geophysical data highlighting
compelling growth targets outside the known mineralisation.
The Company has recently completed a deposit-scale ground magnetics survey, procured and
analysed Sentinel-2 multi-spectral data and is now in the final stages of planning for a trenching
and sampling program, scheduled to commence shortly. The magnetics, Sentinel data and
subsequent trenching program allbuild on the drill program completed recently by the Company,
which has delivered multiple high-grade uranium intercepts. The results from the trenching
program will directly inform the next round of drilling at Oasis.
Greenvale CEO Alex Cheeseman said: “Following the success of our recent drilling program at
Oasis, we have moved ahead promptly with further field work designed to generate our next set
of high-quality drill targets.
“The new ground magnetics survey has highlighted previously unknown structural relationships
that we believe are important in the formation of the mineral system at Oasis. The Sentinel-2 data
shows gas anomalies that correlate with these structural features and our high-grade drilling
results. The fact that this association between datasets is commonly observed in a range of other
high-grade uranium fields (as seen in the Athabasca Basin) makes Oasis a very exciting uranium
system offering significant potential for new discoveries outside the known mineralisation.
“Understanding this structural complexity is key in our exploration strategy. The increased
granularity of the underlying fault structures known to be influencing uranium mineralisation at
Oasis has become a key driver in determining the next phase of field work and future drill testing.”
Highlights
▪ New 42 line-kilometre, close-spaced ground magnetic survey completed over the
Oasis Uranium Deposit, where Greenvale recently completed its maiden drill program.
▪ The high-resolution magnetic data obtained from the survey has revealed multiple,
cross-cutting faults with northwest-southeast and northeast-southwest orientations.
▪ Newly-acquired Sentinel-2 multi-spectral data has also revealed anomalies of helium,
hydrogen, radon and chlorite correlating with the newly-imaged structures.
▪ The new magnetic and Sentinel-2 data, together with results from recent drilling, have
informed the design of a pending trenching program, with site preparations underway
and trenching expected to commence in the coming weeks.
▪ Chemical assay results pending from Greenvale’s recently completed drilling program
and expected to be received in batches in the coming weeks.
Greenvale Energy Limited ASX Release
Page | 2
Close-spaced, ground-based magnetic survey
During September and October, a close-spaced ground magnetics survey was completed to
improve the Company’s understanding of the structural geological complexity at Oasis. The
survey comprised a total 42 line-kilometres consisting of 91 survey lines, each line being 461m
in length. Data were acquired on a 10-metre spaced grid. The completed survey lines are shown
in Figure 1 below.
Figure 1 – Project Location and Magnetic Survey Map – Oasis Deposit, EPM27565.
Earlier surveys, conducted on a regional scale (acquired on spacings of 50-100m grids), gave a
good indication of the general north-south trend of the main Oasis Shear but did not provide
adequate resolution of any structural complexity within the shear zone itself (refer to Figure 2).
The new close-spaced magnetics data clearly show multiple cross-cutting N-S, NW-SE, and NE-
SW structures (refer to Figure 3). Some of these structures may have been created by (or were
responsible for) the various intrusive mafic dykes noted in the Oasis drilling.
More importantly, these features are likely to have controlled the distribution of uranium
mineralisation in the Oasis shear zone.
Understanding the structural history and interplay is therefore vital to understanding the Oasis
mineral system which, in turn, will assist with the ongoing development and refinement of
Greenvale’s regional exploration strategy.
Greenvale Energy Limited ASX Release
Page | 3
Figure 2 – Historical ground magnetics (RTP 1VD), underlying recent drill-holes and existing
structural interpretation (black dashed lines).
Figure 3 – Newly acquired ground magnetics with new structural interpretation.
Greenvale Energy Limited ASX Release
Page | 4
Sentinel-2 Multi-spectral Acquisition
The Company recently acquired multi-spectral data from the Sentinel-2 satellite system to cover
the Oasis Deposit and regional areas throughout exploration permit EPM27565. Sentinel-2
provides a fast, desktop-based method of element and mineral mapping, using a combination of
Visible and Near InfraRed and Short-Wavelength InfraRed spectral analysis at 10m and 20m
spatial resolution, respectively.
Anomalies identified from the Sentinel-2 data include helium, hydrogen, radon, methane and
chlorite, as can be seen in Figure 4. Helium and radon gas are known pathfinders for uranium,
often associated with unconformity deposits (as seen in the Athabasca Basin in Canada), but
also present in any style of uranium deposit as they migrate upwards along faults and fractures.
Figure 4 – Newly-acquired Sentinel-2 data with magnetics (RTP 1VD) and new structural
interpretations.
Greenvale Energy Limited ASX Release
Page | 5
Methane and hydrogen are associated with hydrocarbon deposits and are known reductants for
uranium globally, however as the Sentinel-2 system maps surface distributions, the methane
here is more likely be attributed to pastoral activities. The helium, radon and hydrogen anomalies
correlate with the newly identified structural elements observed from the ground magnetics. This
association, in turn, also coincides with the position of the high-grade drilling results, supporting
the current structural model for the formation of the uranium at Oasis.
Regionally, if the same correlation is observed between geological (structural), geophysical and
mineralogical datasets, these areas could present future targets for Greenvale’s regional
exploration efforts. Regional target development is ongoing.
Next phase of field work
The recent drilling, magnetics and Sentinel-2 data acquired by Greenvale all strongly indicate a
consistent north-south trend throughout the Oasis shear, prompting the design of nine planned
trenches as shown in Figure 5.
Figure 5 – Planned Trenching program.
Greenvale Energy Limited ASX Release
Page | 6
Each trench is planned to be approximately 150m long, and approximately 1-2m in width and
depth. Samples will be collected from each trench, along with geological and structural data.
Trenches will focus on testing the known strike of the Oasis Shear as well as lateral targets
identified from the recent magnetic survey.
Trenching is a very cost-effective way to refine future drill targets. Site preparation for the
trenching program is underway, with earthworks and technical work crews expected to mobilise
to the Project in the coming 1-2 weeks.
The results of the trenching program are expected to generate the next set of drill targets at Oasis.
Authorised for release
This announcement has been approved for release by the Board of Directors.
For further information please contact
Alex Cheeseman Nicholas Read
CEO Read Corporate
E: admin@greenvaleenergy.com.au E: nicholas@readcorporate.com.au
M: +61(0)419 929 046
About Greenvale Energy Limited
Greenvale is an ASX-listed exploration company with a portfolio of projects that will support a sustainable,
low-carbon future. The Company has greenfield, uranium exploration projects in the Northern Territory,
the high-grade Oasis Uranium project in Queensland and the Alpha Torbanite project in Queensland. The
Company believes the best way to create long-term shareholder value is by investing in exploration, to
make discoveries and grow its resource-base.
Forward Looking Statements
This announcement may contain certain forward-looking statements and projections. Such forward
looking statements/projections are estimates for discussion purposes only and should not be relied upon.
Forward looking statements/projections are inherently uncertain and may therefore differ materially from
results ultimately achieved. The Company does not make any representations and provides no warranties
concerning the accuracy of the projections and disclaims any obligation to update or revise any forward-
looking statements/projects based on new information, future events or otherwise except to the extent
required by applicable laws.While the information contained in this report has been prepared in good faith,
neither the Company nor any of its directors, officers, agents, employees or advisors give any
representation or warranty, express or implied, as to the fairness, accuracy, completeness or correctness
of the information, opinions and conclusions contained in this announcement.
Competent Persons Statement
The information in this announcement, as it relates to exploration results, interpretations and conclusions,
is based on information reviewed by Ms Asha Rao who is Technical Advisor to Greenvale Energy Ltd and is
a Member of both the Australasian Institute of Mining and Metallurgy (AusIMM, #228188) and the Australian
Institute of Geoscientists (AIG, #6925). Ms Rao is a Consultant to the Company, and has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration, and to
the overseeing of activities being undertaken to qualify as a Competent Person (as defined in the JORC
2012 edition of the “Australasian Code for Reporting of Mineral Resources and Ore Reserves”. Ms Rao
consents to the inclusion of this information in the form and context in which it appears.
Greenvale Energy Limited ASX Release
Page | 7
Appendix 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
totheminerals under investigation, such as down holegamma sondes,
or handheld XRF instruments, etc). These examples should not be
taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases, more explanation may be required, such
as where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed information.
No physical samples are being reported.
Ground Magnetics Survey
The ground magnetics survey was conducted on a grid of 10 metre spaced stations
and 10 metre spaced lines, over the main Oasis shear and extending approx. 250
metres to the north and south of the known deposit.
A total 42 line-kilometres (km) were surveyed, orientated East – West or 90° - 270°
from North. The survey comprised a total of 91 survey lines, with each line being 461
metres in length.
Surveying was completed by mineral exploration consultants, Terra Search Pty Ltd,
using two GSM-19 Overhauser walking magnetometers. Each GSM-19 has an on-
board GEMSYS GPS receiver and automatic data logging facility, with readings
recorded every second, or every 1 – 1.5 metre interval per reading.
In the GEMSYS system, all locations are collected as UTM coordinates in MGA Zone
55 projection.
The following data and Images were produced :
- gridded total magnetic intensity (TMI).
- Reduced to pole (RTP)
- First vertical derivative (1VD)
- Analytic signal (AS)
- Three component RGB (red-green-blue) magnetic image (AS RTP 1VD)
- Tilt derivative TLD.
- Total Horizontal Derivative (THD)
- Second vertical derivatives (2VD)
Greenvale Energy Limited ASX Release
Page | 8
Criteria JORC Code explanation Commentary
Sentinel-2 Multispectral Data
“Sentinel-2” refers to the Copernicus Sentinel-2 mission, run by the European Space
Agency (ESA) which is based on a constellation of 2 identical satellites in the same
orbit. Each satellite carries a wide range of high-resolution, multispectral imagers
with 13 spectral bands that map element distribution on the Earth’s surface using a
combination of Visible Near-Infrared (VNIR) spectral analysis (at 10m spatial
resolution) and Shortwave Infrared (SWIR) spectral analysis (at 20m spatial
resolution).
Greenvale Energy Ltd engaged the services of Dirt Exploration (based in South Africa)
to acquire and interpret the Sentinel-2 data for the Oasis Project.
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (e.g. core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
No drilling is reported in this release.
Drill sample
recovery
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain
of fine/coarse material.
No drilling is reported in this release.
Logging • Whether core and chip samples have been geologically and
geotechnicallylogged to a level of detail to support appropriate Mineral
Resource estimation, mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
No drilling is reported in this release.
Sub-sampling
techniques and
sample
preparation
• If core, whether cut or sawn and whether quarter, half or all core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
No samples are reported in this release.
Greenvale Energy Limited ASX Release
Page | 9
Criteria JORC Code explanation Commentary
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the in-
situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material
being sampled.
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or
total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (e.g. standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (i.e. lack of bias) and precision have been established.
No samples are reported in this release.
Verification of
sampling and
assaying
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
No drilling or physical samples are reported in this release.
Location of data
points
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations used
in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
Any and all coordinates shown are in projection GDA2020 / UTM MGA Zone 55
(Oasis).
Data spacing
and distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
No drilling is reported in this release.
Greenvale Energy Limited ASX Release
Page | 10
Criteria JORC Code explanation Commentary
ResourceandOre Reserve estimationprocedure(s)and classifications
applied.
• Whether sample compositing has been applied.
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
• If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
Geological control of the Oasis structure containing uranium mineralisation is very
well established from previous historical work dating back to the 1970’s with Esso,
followed up in 2008 with modern exploration by Glengarry and Mega Uranium. The
uraniferous Oasis structure is broadly north – south striking and dipping 60 to 70
degrees to the west. This structural attitude has been confirmed by 2025 Greenvale
drilling.
No drilling is reported in this release, however the geological understanding gained
fromthe 2025drill campaign is beingutilisedin the wider, regional prospectivitywork
which is reported in this document.
Sample security • The measures taken to ensure sample security. No samples are reported in this release.
Audits or
reviews
• The results of any audits or reviews of sampling techniques and data. No audits have been conducted.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
• The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
EPM27565was grantedto RemlainPty Ltdin Feb2021,in Jan2025the mineral permit
was acquired by Greenvale Utilities a 100% subsidiary of Greenvale Energy Ltd. The
current 5-year term expires on 23rd
Feb 2027.
The Oasis deposit and associated regional uranium anomalism are contained within
EPM 27565 which covers 53 subblocks over an area of 90 km2 and located 250 km
west of Townsville and 50 km west of Greenvale in FNQ. The project area is located
entirely within the Lynd Station pastoral land.
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by other parties. Previous exploration summary reported in ASX releases dated 13th Jan 2025.
Greenvale Energy Limited ASX Release
Page | 11
Criteria JORC Code explanation Commentary
Geology • Deposit type, geological setting and style of mineralisation. Structurally controlled uranium mineralization hosted in complexly deformed
granite dominated intrusives and high grade metamorphics.
Drill hole
Information
• A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from the
understanding of the report, the Competent Person should clearly
explain why this is the case.
No drilling is reported in this release.
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high-grade
results and longer lengths of low-grade results, the procedure used for
such aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent values
should be clearly stated.
No drilling is reported in this release.
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important in the reporting of
Exploration Results.
• If the geometry of the mineralisation with respect to the drill hole angle
is known, its nature should be reported.
• If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (e.g. ‘down hole length, true
width not known’).
No drilling is reported in this release.
Greenvale Energy Limited ASX Release
Page | 12
Criteria JORC Code explanation Commentary
Diagrams • Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include but not be limited to a plan view of drill
hole collar locations and appropriate sectional views.
All appropriate diagrams are contained in the report.
Balanced
reporting
• Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
Exploration Results.
This release describes all relevant information available to the Company.
Other
substantive
exploration data
• Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical
survey results; geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
All available exploration data derived from Company work programs has been
provided.
Further work • The nature and scale of planned further work (e.g. tests for lateral
extensions or depth extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas,
provided this information is not commercially sensitive.
Drilling is now complete, with final assay results and geophysical logs pending.
A trench sampling program has been planned utilising the recent drilling results,
ground magnetics survey and Sentinel-2 multispectral data. A total of 9 trenches are
planned, each approximately 150 metres in length, 1 – 2 metres in width and
approximately 1- 2 metres deep (refer to Figure 5).
Share your feedback
Discover