Significant Uranium anomalies identified across the NT
Released
Released
Announcement PDF
ASX Release 17 June 2025
SIGNIFICANT URANIUM ANOMALIES IDENTIFIED ACROSS
MULTIPLE PROJECTS IN THE NT
Highlights
Significant uranium anomaly identified at Elkedra Project, with an 8-km
strike length.
32-km paleochannel identified connecting Douglas River and Jindare
Projects.
Exceptional targets, with scale potential, warrant immediate follow-up
field work.
Planning and permitting for field work is underway.
Greenvale Energy Limited ASX: GRV (“Greenvale” or “the Company”) is pleased to announce
highly encouraging preliminary results from recent airborne magnetics and radiometrics
(mag/rad) surveys conducted over the Elkedra and Douglas River Uranium Projects in the
Northern Territory, Australia.
Extensive Uranium Anomalism
The mag/rad surveys were completed at 100-metre line spacing in order to provide greater
granularity on potential uranium targets.
Initial evaluation has confirmed the presence of extensive uranium and uranium/thorium
anomalism.
Preliminary results have identified a large anomalous system with a significant uranium anomaly
extending over an 8-km strike length at the Elkedra Project.
The results reinforce the strong prospectivity of the Company’s Northern Territory exploration
landholding. The Northern Territory has a long history of successful uranium exploration and
mining.
Elkedra Project (EL33756)
Initial evaluation of recently captured radiometric data has confirmed the presence of extensive
uranium and uranium/thorium anomalism. These results are consistent with and build on the
findings from the Northern Territory Geological Survey regional airborne surveys completed
between 1999 and 2002 at 400-metre line spacing.
Interactive Investor Hub - Engage directly with Greenvale through our Investor hub, you can ask questions, review
comments and get direct access to the Company – follow the link greenvaleenergy.com.au/announcements
Greenvale Energy Limited
ABN 54000743555
Perth: Level 1, 1 Alvan St, Subiaco, 6008
W: greenvaleenergy.com
E: admin@greenvaleenergy.com.au
Brisbane: Suite 5-Level 12, 10 Market St, Brisbane 4000
Page | 1
Greenvale Energy Limited ASX Release
Preliminary results have identified a large anomalous system with evidence indicating a spatial
association of the anomaly with the Elkedra Granite.
This granite is interpreted to be the primary source of the anomalous uranium, suggesting the
mineralisation may have formed via the leaching of and subsequent fluid transport from the
granite into adjacent rock units.
The precise geological setting of the uranium mineralisation remains under investigation. It is
currently unclear whether the anomalous uranium is hosted within the Cambrian sedimentary
sequence or at the unconformable contact between the Cambrian units and the underlying early
Proterozoic rocks.
This unconformity is a key structural and stratigraphic feature, often recognised as a favourable
setting for uranium deposition in analogous systems. Structural controls are also evident,
implying that faulting or other tectonic processes may have facilitated fluid movement and
uranium concentration.
The combination of favourable stratigraphy, structural complexity and a granitic uranium source,
presents a compelling exploration target.
The radiometric results can be seen in Figure 1, with high equivalent parts per million (eppm)
values depicted in red. The 8 km strike can be seen from A to A’. Detailed modelling and
interpretation results are pending.
Figure 1. Radiometric Survey preliminary results for Elkedra demonstrating potential for a
large system across 8-km strike
Page | 2
Greenvale Energy Limited ASX Release
Douglas River Project (EL33670)
The Douglas River survey has confirmed a northern extension of a paleochannel system
previously identified in the Jindare survey to the south 1. The extension of this system, which is
assessed to continue over 32-km, enhances the prospectivity of the area for sandstone-hosted
uranium mineralisation.
The paleochannel setting provides a favourable environment for uranium deposition, with
potential for fluid transport and trapping within porous sandstone units.
Located within the Pine Creek Region, one of the world’s most significant uranium and gold
provinces, this finding supports the broader regional potential of the Douglas River/Jindare
projects.
The radiometric results can be seen in Figure 2 (along with previously reported Jindare results),
with high equivalent uranium ppm values depicted in red. The 32km paleochannel can be seen
extending through both projects. Detailed modelling and interpretation results are pending.
Figure 2. Radiometric Survey preliminary results for Douglas River and Jindare, with a
32 km paleochannel identified
1 Refer to ASX Announcement Multiple Uranium Anomalies Identified at Key NT Projects released 15 May 2025
Page | 3
Greenvale Energy Limited ASX Release
Future Works
Whilst the Company is still awaiting detailed modelling and interpretation of the mag/rad survey
data, the preliminary results indicate a mineral prospectivity at Elkedra that warrants a
comprehensive follow-up field program.
Planning and permitting processes are currently underway, with the Company estimating field
activities to be completed during Q3 CY 2025.
Fieldwork will likely include detailed ground geophysical surveying using handheld
scintillometers targeting the anomalies identified through the recent airborne rad/mag surveys.
Field programs will also seek to incorporate detailed geological mapping to better understand
the lithological and structural controls on the potential uranium mineralisation. Surface
geochemical sampling will likely be conducted, including systematic collection of soil and rockchip samples across key target areas.
These samples will be analysed for uranium and associated pathfinder elements to refine targets
for future exploration efforts.
Greenvale CEO Alex Cheeseman said:
“These results reinforce the excellent potential of our NT projects and provide a clear pathway
for our next round of exploration work across the Territory.
The scale of the anomaly at Elkedra is clear, with this target now the priority focus within our NT
portfolio. We plan to get boots on the ground as soon as possible. Planning and permitting actions
are underway and we expect to be able to conduct fieldwork in Q3.
Given the Northern Territory’s long and successful history of uranium exploration and mining, to
have identified such compelling targets so early in our exploration journey is a fantastic result for
Greenvale.”
Authorised for release
This announcement has been approved for release by the Board of Directors.
For further information please contact
Alex Cheeseman
CEO
E: admin@greenvaleenergy.com.au
Nicholas Read
Read Corporate
E: nicolas@readcorporate.com.au
M: +61(0)419 929 046
About Greenvale Energy Limited
Greenvale is an ASX-listed exploration company with a portfolio of projects that will support a sustainable,
low-carbon future. The Company has early-stage uranium exploration projects in the Northern Territory,
the Oasis advanced-exploration project in Queensland and the Alpha Torbanite and Millungera Basin
geothermal projects in Queensland. The Company believes the best way to create long-term shareholder
value is by investing in exploration, to make discoveries and grow its resource-base.
Page | 4
Greenvale Energy Limited ASX Release
Forward Looking Statements
This announcement may contain certain forward-looking statements and projections. Such forward
looking statements/projections are estimates for discussion purposes only and should not be relied upon.
Forward looking statements/projections are inherently uncertain and may therefore differ materially from
results ultimately achieved. The Company does not make any representations and provides no warranties
concerning the accuracy of the projections and disclaims any obligation to update or revise any forwardlooking statements/projects based on new information, future events or otherwise except to the extent
required by applicable laws. While the information contained in this report has been prepared in good faith,
neither the Company nor any of its directors, officers, agents, employees or advisors give any
representation or warranty, express or implied, as to the fairness, accuracy, completeness or correctness
of the information, opinions and conclusions contained in this announcement.
Competent Persons Statement
The information in this announcement that relates to exploration results is based on information compiled
by Mr. Graham Bubner who is a Member of the Australian Institute of Geoscientists. Mr. Bubner is a fulltime employee of Asis International and has sufficient experience which is relevant to the style of
mineralisation under consideration to qualify as a Competent Person as defined in the 2012 Edition of the
“Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Bubner
consents to the inclusion in the announcement of the matters based on his information in the form and
context in which it appears.
Page | 5
Greenvale Energy Limited ASX Release
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Sampling
techniques
•
•
•
•
Commentary
Nature and quality of sampling (eg cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the minerals
under investigation, such as down hole gamma sondes, or handheld XRF
instruments, etc). These examples should not be taken as limiting the broad
meaning of sampling.
Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the Public
Report.
In cases where ‘industry standard’ work has been done this would be relatively
simple (eg ‘reverse circulation drilling was used to obtain 1 m samples from
which 3 kg was pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where there is coarse gold
that has inherent sampling problems. Unusual commodities or mineralisation
types (eg submarine nodules) may warrant disclosure of detailed information.
•
N/A – no physical samples taken.
Drilling
techniques
•
Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard tube,
depth of diamond tails, face-sampling bit or other type, whether core is oriented
and if so, by what method, etc).
•
N/A – no drilling conducted.
Drill sample
recovery
•
Method of recording and assessing core and chip sample recoveries and results
assessed.
Measures taken to maximise sample recovery and ensure representative nature
of the samples.
Whether a relationship exists between sample recovery and grade and whether
sample bias may have occurred due to preferential loss/gain of fine/coarse
material.
•
N/A – no drilling conducted.
Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the relevant intersections logged.
•
N/A – no drilling conducted.
•
•
Logging
•
•
•
Page | 6
Greenvale Energy Limited ASX Release
Criteria
JORC Code explanation
Sub-sampling
techniques and
sample
preparation
•
•
•
•
•
•
Quality of assay
data and
laboratory tests
•
•
•
Verification of
sampling and
assaying
•
•
Commentary
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled
wet or dry.
For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to the grain size of the material being
sampled.
•
N/A – no drilling conducted, nor physical samples taken.
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (ie lack
of bias) and precision have been established.
• The airborne magnetic/radiometric surveys were undertaken in 2nd
quarter 2025 using a MagSpec fixed wing Cessna 210.
• Traverses at nominal altitude of 40 metres were flown at 100 metre
intervals on lines oriented east-west (Douglas River Project area) or
north-south (Elkedra Project area). Orthogonal tie lines were flown at 1
km intervals.
• Magnetics data were recorded using a Geometrics cesium vapour
sensor with 0.001 nT resolution and 0.01 nT sensitivity operating at
20Hz sample rate. Radiometric data were recorded over 1024
channels using an RSI spectrometer with 32 litre crystal pack operating
at 2Hz sample rate. Elevation data were recorded using a Novotel
DGPS receiver operating at 1Hz.
• The magnetics and radiometric data were processed using industry
standard procedures. The magnetics data were corrected to produce
Total Magnetic Intensity data in units of nanotesla (nT). The radiometric
data were smoothed using the NASVD method and then corrected to
produce potassium values in units of e% (equivalent percent), and
uranium and thorium values in units of eppm (equivalent ppm).
• A compensation box was flown prior to the survey. Pre- and post-flight
calibration data were tabulated and reviewed.
The verification of significant intersections by either independent or alternative
company personnel.
The use of twinned holes.
•
N/A no assays conducted nor reported.
Page | 7
Greenvale Energy Limited ASX Release
Criteria
JORC Code explanation
•
•
Location of data
points
•
•
•
Data spacing
and distribution
•
•
•
Commentary
Documentation of primary data, data entry procedures, data verification, data
storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
•
The grid system is MGA_GDA94, zone 53 for Elkedra Project area, and
MGA_GDA94, zone 52 for Douglas River Project area.
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
•
Readings were acquired at intervals of circa 3.5 metres for magnetic
data and circa 35 metres for radiometric data on traverses 100 metres
apart. By conventional industry standards this constitutes a detailed
airborne survey.
• Airborne survey flight line orientation and spacing is deemed
appropriate for the geological terrane covered i.e. flight lines
perpendicular to the dominant geological strike in each of the project
areas.
Orientation of
data in relation
to geological
structure
•
•
Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit type.
If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.
Sample security
•
The measures taken to ensure sample security.
•
N/A – no samples collected.
Audits or
reviews
•
The results of any audits or reviews of sampling techniques and data.
•
N/A.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Mineral
tenement and
land tenure
status
•
•
Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.
The security of the tenure held at the time of reporting along with any known
Commentary
EL33670 was granted to Gempart (NT) Pty Ltd in May 2024, in August
2024 an 80% interest in the project was transferred to Greenvale Energy
Ltd under an acquisition agreement. The current 5 year term expires on
19th May 2030.
• EL33756 was granted to Gempart (NT) Pty Ltd in September 2024, in
•
Page | 8
Greenvale Energy Limited ASX Release
Criteria
JORC Code explanation
Commentary
impediments to obtaining a licence to operate in the area.
November 2024 an 80% interest in the project was transferred to
Greenvale Energy Ltd under an acquisition agreement. The current 5
year term expires on 26th September 2030.
Exploration
done by other
parties
•
Acknowledgment and appraisal of exploration by other parties.
•
Previous exploration summaries were reported in ASX releases dated
5th Sep 2024 (Douglas River Project), and 21st Nov 2024 (Elkedra
Project).
Geology
•
Deposit type, geological setting and style of mineralisation.
•
Exploration is at an early stage and no new deposits are reported.
Drill hole
Information
•
A summary of all information material to the understanding of the exploration
results including a tabulation of the following information for all Material drill
holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in metres) of the
drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis that the information is
not Material and this exclusion does not detract from the understanding of the
report, the Competent Person should clearly explain why this is the case.
•
N/A – no drilling conducted.
In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (eg cutting of high grades) and cut-off grades
are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade results and
longer lengths of low grade results, the procedure used for such aggregation
should be stated and some typical examples of such aggregations should be
shown in detail.
The assumptions used for any reporting of metal equivalent values should be
clearly stated.
• N/A.
These relationships are particularly important in the reporting of Exploration
Results.
If the geometry of the mineralisation with respect to the drill hole angle is known,
its nature should be reported.
•
•
Data
aggregation
methods
•
•
•
Relationship
between
mineralisation
widths and
•
•
N/A – no drilling conducted/reported.
Page | 9
Greenvale Energy Limited ASX Release
Criteria
JORC Code explanation
intercept
lengths
•
If it is not known and only the down hole lengths are reported, there should be a
clear statement to this effect (eg ‘down hole length, true width not known’).
Diagrams
•
Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These should
include but not be limited to a plan view of drill hole collar locations and
appropriate sectional views.
•
All appropriate diagrams are contained in the report.
Balanced
reporting
•
Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration Results.
•
This release describes all relevant information available to the
Company.
Other
substantive
exploration
data
•
Other exploration data, if meaningful and material, should be reported including
(but not limited to): geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and method of treatment;
metallurgical test results; bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating substances.
•
All available exploration data derived from Company work programs
has been provided.
Further work
•
The nature and scale of planned further work (eg tests for lateral extensions or
depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions, including the
main geological interpretations and future drilling areas, provided this
information is not commercially sensitive.
•
Fieldwork program will likely include detailed ground geophysical
surveying using handheld scintillometers targeting the anomalies
identified through airborne rad/mag surveys.
Fieldwork will also seek to incorporate detailed geological mapping to
better understand the lithological and structural controls of potential
uranium mineralisation.
Surface geochemical sampling will likely be conducted, including
systematic collection of soil and rock-chip samples across key target
areas.
•
Commentary
•
•
Page | 10
Share your feedback
Discover