Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX Release 24 April 2026
Interactive Investor Hub - Engage directly with the Company through our Investor hub, you can ask questions, review
comments and get direct access to Management – follow the link greenvaleenergy.com.au/announcements
Greenvale Energy Limited ABN 54000743555 W: greenvaleenergy.com E: admin@greenvaleenergy.com.au
WA Office: Level 1, 1 Alvan St, Subiaco, 6008 QLD Office: Suite 5-Level 12, 10 Market St, Brisbane 4000 Page | 1
MARCH 2026 QUARTERLY ACTIVITIES REPORT
Progress and development across all aspects of Greenvale’s Project
Portfolio focused on clean energy and critical infrastructure
Greenvale Energy Limited ASX: GRV (“Greenvale” or “the Company”) is pleased to report on its
activities for the quarter ended 31 March 2026 (“the Quarter”), during which the Company
received the final results from its 2025 exploration program at the Oasis Uranium Project,
continued to advance the processing test work for the Alpha Project and secured the grant of a
key Exploration Licence at the Douglas River Uranium Project.
During the Quarter, physical access to the Company’s project areas was limited due to severe
weather across northern Queensland and the Northern Territory. Moving into the June Quarter
the Company anticipates ground conditions will improve and is ready to recommence field work
across its Queensland and Northern Territory Projects.
Operational Activities
Oasis Uranium Project (100%) – EPM 27565, Queensland
During the Quarter, exploration effort at the Oasis Uranium Project was focused on advancing
both the growth potential of the existing deposit and identifying new regional discovery
opportunities through the integration of newly acquired geophysical data and results from
recently completed geochemical and surface exploration programs.
Highlights
Oasis Uranium Project growth potential significantly expanded, with trenching
results confirming extensions to known mineralisation and identifying multiple high-
priority step-out drill targets alongside regional exploration targets.
Alpha Project reached a major development milestone, with bulk sample
production achieving ~99% conversion and 30–35% product yields, enabling work
programs to transition to product testing and certification.
Strategic uranium portfolio strengthened in the Northern Territory, with the grant
of a key exploration licence at Douglas River and early targeting work indicating high
prospectivity along key structural controls associated with the nearby Thunderball
deposit.
Alex Cheeseman appointed as Managing Director as stakeholder engagement
increases concurrently with exploration and project development activities ramping
up.
Greenvale Energy Limited ASX Release
Page | 2
The acquisition and interpretation of Sentinel-2 multispectral data across the entire tenement
package significantly enhanced the Company’s understanding of the mineral potential of the
Project at a regional scale.
The Sentinel-2 data identified multiple gas (helium and radon) and alteration (chlorite) anomalies
that correlate with previously defined radiometric, magnetic and structural features, providing
strong support for the prospectivity of the broader project area.
In total, nine priority target areas were defined where these datasets align (refer to Figure 1), along
with a further seven areas of interest based on coincident anomalism1
. These results highlight
the potential for the Oasis Project to host additional intrusive-related uranium mineralisation
beyond the known deposit.
Figure 1 – Layering of all exploration results (magnetics, radiometrics, structural
interpretation, Sentinel-2 multispectral and rockchip/geochemical results
At the deposit scale, results2
were received for the trenching program completed between
October and November 2025, with results providing important geological and geochemical
validation of mineralisation and structural controls.
The program comprised six trenches totalling approximately 775 metres, from which 449
samples were collected and assayed. The results confirmed that uranium mineralisation is
1
Refer to ASX Announcement Regional Discovery Potential released 11 February 2026.
2
Refer to ASX Announcement New step-out drilling targets identified from trenching released 16 March
2026
Greenvale Energy Limited ASX Release
Page | 3
continuous from surface and associated with the Oasis Shear and adjacent structures,
reinforcing the current geological model. Importantly, the trenching delineated multiple zones of
anomalous uranium mineralisation extending beyond the currently defined deposit, including a
northern extension of the main shear zone and additional parallel and cross-cutting structures.
Assay results from the trenching program demonstrate a clear contrast between background
uranium levels and anomalous zones, with peak values reaching approximately 87 ppm U
(equivalent to ~102 ppm U₃O₈).
These results confirm the presence of coherent, structurally controlled mineralisation at surface
and provide strong vectors for follow-up drilling. The identification of multiple mineralised trends
has resulted in the definition of several high-priority step-out drill targets to the north, east and
northwest of the existing deposit (refer to Figure 2). South of the deposit remains open and
requires further exploration to develop potential drill targets.
Figure 2 – Step-out targets identified at the Oasis deposit
Greenvale Energy Limited ASX Release
Page | 4
Mineralisation is interpreted to be related to an intrusive system associated with the Mywyn
Granite, with uranium mobilised and concentrated along structurally complex zones, including
north–south and northeast–southwest trending structures. The recognition of chlorite alteration
and mylonitic zones as key controls further enhances the effectiveness of targeting going
forward.
While no drilling was completed during the period, the combined results of the trenching and
multispectral programs have significantly upgraded both the deposit-scale and regional
exploration potential.
A compulsory 50% relinquishment of the area covered by EPM27565 (26 sub-blocks) was
completed at the end of the Quarter, in compliance with the requirements set by the Department
of Natural Resources and Mines, Manufacturing and Regional and Rural Development
(DNRMRRD), Queensland. Figure 3 provides the updated, post-relinquishment, tenure map for
the Oasis Uranium Project. The Company believes that whilst the project area has been
amended, the general geological potential remains unchanged as a result of the relinquishment.
Figure 3 – Updated Licence Boundary (EPM27565)
The Company’s immediate focus for Oasis will be ground truthing the identified regional targets
through a systematic process of mapping and sampling.
Stakeholder engagement and land access procedures were initiated in March 2026, but site
access was constrained due to weather and associated roads closures. The Company has
continued to engage with local stakeholders and is preparing for field work in the June Quarter.
Greenvale Energy Limited ASX Release
Page | 5
Douglas River Uranium Project (80%) – EL33670, EL34157, ELA34114 and ELA33900, Northern
Territory
The Douglas River Uranium Project is situated within the world-class mineral province of the Pine
Creek Orogen. This province hosts multiple high-grade uranium resources, such as Thunderball
(JORC 2004, 1.05Mt of uranium oxide, for 1.69Mlbs @ 924ppm U3O8) and former/historical
uranium mines such as Ranger, Rum Jungle and Coronation Hill.
The Douglas River Project sits less than 8km due south of the Thunderball deposit (refer to Figure
5), hosted in a geological environment that is also cut by multiple, steep-angled faults connected
to the Hayes Creek Fault Zone, a key structural control associated with the major uranium
deposits in this part of the province.
During the Quarter, the company was notified of the granting of Mineral Exploration Licence
EL34157 for a six-year term. EL34157 is situated on the northern edge of the Company’s existing
tenure (EL33670) and also overlies the southern extension of the Hayes Creek Fault Zone, directly
along strike from Thunderball.
Sentinel-2 multispectral data covering the entire project area was acquired and interpreted, with
radon and helium (gas) anomalies correlating well with both airborne radiometric uranium
anomalies and key structural features3
. This correlation is interpreted as being analogous to
Thunderball, a known unconformity-related uranium deposit (refer to Figure 4).
The granting of EL34157 is a major achievement for the Company, with planning underway for
airborne geophysics and ground-based field work scheduled for the June quarter.
The tenement application process (to convert ELA to EL) has involved ongoing Native Title
consultations and the formal National Native Title Tribunal process with the Northern Land
Council (NLC) and, in particular, the communities of the Wagiman, Waral and Jawoyn Peoples.
In order to help address the communities’ concerns, the Department of Mines and Energy (NT)
removed culturally significant areas from Exploration Licence ELA33900 (refer to Figure 4).
The Company supports this pragmatic approach to managing cultural heritage matters and notes
that the areas excised from the ELA were not areas of interest and therefore have no impact on
the general prospectivity of the project.
The matter has been referred back to the NLC and the tribunal process is ongoing. Despite the
delays caused by this process, the Company successfully commenced key stakeholder
engagement during the Quarter and will continue this effort going forward.
Elkedra-Henbury Uranium Project (80%) – EL33756, EL33637 and EL33638, Northern Territory
No work was completed on the Elkedra-Henbury Project during the Quarter. Sentinel-2
multispectral data has been acquired and is currently being interpreted.
3
Refer to ASX Announcement Targets identified at Douglas River released 26 February 2026
Greenvale Energy Limited ASX Release
Page | 6
Figure 4 - Douglas River Project area with Sentinel-2 multispectral data, initial exploration
target areas and areas recently excised from ELA33900.
Alpha Project (100%) – MDL 330 and EPM27718, Queensland
During the Quarter, the Company continued to advance Test Program 7 (TP7) for the Alpha
Project through the completion of TP7 Milestone 3 – generation of a bulk sample. The bulk sample
was generated via production from repeated pressure leach processing.
Across the Milestone 3 production campaign, multiple bulk leach runs were completed using
consistent feedstock and operating conditions, achieving high levels of process stability and
performance. Optimisation work during the program delivered a material improvement in
process efficiency, including a reduction in reaction retention time from 60 minutes to 30
minutes without compromising performance and modifications to reactor design that improved
mixing and reduced residue. These changes resulted in consistently high conversion rates of
approximately 99% and primary product yields in the order of 30–35% (by weight).
The completion of Milestone 3 marks the transition from process validation to product
development and certification. Bulk samples produced during TP7 were dispatched to Technix in
New Zealand, where detailed characterisation and testing is underway. Initial work has also
highlighted the importance of post-processing steps, particularly the removal of volatile
components to enhance product viscosity and meet specification requirements.
Greenvale Energy Limited ASX Release
Page | 7
This phase of work represents the culmination of several years of technical development at Alpha
and positions the project for the next stage of commercialisation.
With a JORC Code 2012 Edition Inferred Mineral Resource Estimate of 28Mt (27.7 million barrels
of synthetic oil equivalent4
), the project is being advanced against a backdrop of tightening global
and domestic bitumen supply, reinforcing its strategic potential as a domestic source of bitumen
for Australia.
In compliance with the requirements for an Exploration Permit set by the DNRMMRRD (QLD), a
compulsory 50% relinquishment of the area covered by EPM27718 (16 sub-blocks) was
submitted in November 2025, with review by the Department ongoing throughout the Quarter.
Figure 5 provides the expected post-relinquishment, tenure map for the Alpha Project. The
Company believes that the general geological potential and ability to continue to grow the MRE
through extension drilling remains unchanged as a result of any pending relinquishment.
Figure 5 – Expected Licence Boundary Map (EPM27718 - pending)
Millungera Basin Geothermal Project (100%) – EPG 2023, EPG 2024 and EPG 2025 –
Queensland
No work was undertaken on the Millungera Basin tenements during the Quarter.
During the Quarter, the Farm-in partner for the Millungera Project (ASX:SRL – Sunrise Energy
Limited) announced a partnership with US-based, private technology company I-pulse who
would deploy their patented G-Pulse pulsed-power drilling technology at Millungera.
SRL Chairman Robert Friedland was quoted: “The key enabler for unlocking Australia’s vast
geothermal potential is drilling technology, and this partnership with I-pulse brings state-of the
4
Refer to ASX Announcement 51% Increase in Alpha Resource substantially expands project scale and
potential released 13 November 2023
Greenvale Energy Limited ASX Release
Page | 8
art capability in pulsed-power drilling. The solution to long-life, carbon-free, non-interruptible
power already lies directly beneath our feet. We look forward to working with I-pulse and
Greenvale to unlock the almost limitless potential of subsurface heat sources on the Australian
continent.”
The Millungera Basin is recognised as one of Australia’s most prospective geothermal regions,
with substantial estimated stored thermal energy.
Longreach Geothermal Project (100%) – EPG 2029 Queensland
During the Quarter, no work was undertaken nor intended. The Company has initiated
administrative procedures to relinquish EPG 2029 and this process is ongoing.
Schedule of Tenements
The Company’s tenement schedule is provided in Appendix 1.
ESG and Sustainability
During the Quarter, Greenvale continued to engage with a number of the Traditional Owners
across the Company’s uranium exploration portfolio, along with the landowners/pastoralists at
both the Oasis Uranium Project (QLD) and Douglas River Uranium Project (NT).
The Company undertook stakeholder meetings in the Darwin and Pine Creek region and noted
the significant interest and support for its exploration activities in the Territory.
Finance
Cash Position
The Company held cash and cash equivalents of approximately AUD$2.7 million (unaudited) at
31 March 2026.
Exploration Expenditure
During the Quarter, the Company invested approximately AUD$192,000 in exploration and
evaluation activities across its project portfolio. Approximately 79% was focused on uranium
exploration.
R&D Expenditure and Tax Rebate
During the Quarter, a further AUD$40,000 was spent on R&D for the Alpha Project, with a current
financial 2025/26 year-to-date R&D expenditure of approximately AUD$355,000.
During the Quarter, the Company received its 2024/25 R&D tax claim of AUD$359,000.
Other Disclosure
As disclosed under item 6 in Appendix 5B, the Company made payments to related parties for a
total consideration of A$71,000. This consideration relates to payments attributable to routine
Director fees including statutory superannuation.
Greenvale Energy Limited ASX Release
Page | 9
The Company maintains a Director-provided finance facility, which remains undrawn. The
Company therefore ended the Quarter with zero debt.
The Company confirms that there was no mine production nor mine development activities for
the Quarter.
Corporate Activity
Board Changes
During the Quarter, the Company advised of the resignation of Non-Executive Director Mr John
Barr, and the appointment of Mr Alex Cheeseman as Managing Director. The Company believes
the structure and composition of the Board of Directors is appropriate for its size and operations
at this time.
EGM
The Company held an Extraordinary General Meeting on 19 January 2026, with key resolutions
pertaining to the ratification and issue of shares and options linked to the Placement and SPP
completed in the December 2025 quarter. All resolutions were passed.
Capital Structure
At the end of the Quarter, the Company had 592,735,588 shares, 17,000,000 performance rights
and 21,556,122 unlisted options, (exercise price of $0.07 and expiry of 30 November 2026) on
issue.
Key ASX Announcements during the Quarter
Results of Meeting (EGM) dated 19 January 2026
Investor Presentation dated 2 February 2026
Regional Discovery Potential dated 11 February 2026
Alpha TP7 Milestone 3 Production update dated 23 February 2026
Targets identified at Doulas River dated 26 February 2026
New step-out drilling targets identified from trenching dated 16 March 2026
Appointment of Managing Director dated 26 March 2026
All announcements are available at: greenvaleenergy.com.au/announcements
Authorised for release
This announcement has been approved for release by the Board of Directors.
For further information please contact
Alex Cheeseman Nicholas Read
Managing Director Read Corporate
E: admin@greenvaleenergy.com.au E: nicholas@readcorporate.com.au
M: +61(0) 485 603 120 M: +61(0)419 929 046
Greenvale Energy Limited ASX Release
Page | 10
About Greenvale Energy Limited Greenvale is an ASX-listed exploration company, committed to building a portfolio
of projects that will support the need for critical materials and critical infrastructure. The Company is building a large
land holding in the world-class Pine Creek region of the Northern Territory, and also owns the advanced, high-grade
Oasis Uranium Project in Queensland. The Company has additional new-energy and forward facing projects including
the strategically significant Alpha Project. Greenvale’s projects are all aligned with the global need for reliable,
sustainable, low-emissions energy and supply chains. The Company believes the best way to create long-term
shareholder value is by investing in exploration, to make discoveries and grow its resource-base.
Compliance Statement This announcement contains information on the Oasis, Douglas River and Alpha projects,
extracted from ASX market announcements dated 13 November 2023, 11 February 2026, 26 February 2026, 6 March
2026 and 16 March 2026, reported in accordance with the JORC Code 2012 Edition and available for viewing at
greenvaleenergy.com.au/announcements. The Company confirms that it is not aware of any new information or data
that materially affects the information included in any original announcement and that all material assumptions and
technical parameters underpinning the estimates in the original market announcement continue to apply and have
not materially changed.
Forward Looking Statements This announcement may contain certain forward-looking statements and projections.
Such forward looking statements/projections are estimates for discussion purposes only and should not be relied
upon. Forward looking statements/projections are inherently uncertain and may therefore differ materially from
results ultimately achieved. The Company does not make any representations and provides no warranties concerning
the accuracy of the projections and disclaims any obligation to update or revise any forward-looking
statements/projects based on new information, future events or otherwise except to the extent required by applicable
laws. While the information contained in this report has been prepared in good faith, neither the Company nor any of
its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to the
fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
announcement.
Greenvale Energy Limited ASX Release
Page | 11
Appendix 1 – Schedule of Tenements at 31 March 2026
Alpha Project, Queensland
Tenement Owned by Status
Acquired
Interest during
Quarter
Disposed
Interest during
Quarter
Interest at end of
Quarter
MDL 330 Alpha Resources Pty Ltd Current to 31 January 2027 - - 100%
EPM 27718 Alpha Resources Pty Ltd
Renewal submitted Nov 2025 -
determination pending
- - 100%
Geothermal Projects, Queensland
Tenement Owned by Status
Acquired
Interest during
Quarter
Disposed
Interest during
Quarter
Interest at end of
Quarter
EPG 2023 Greenvale Energy Ltd Current to 18 September 2030 - - 100%
EPG 2024 Greenvale Energy Ltd Current to 11 September 2030 - - 100%
EPG 2025 Greenvale Energy Ltd Current to 5 November 2030 - - 100%
EPG 2029 Greenvale Energy Ltd Current to 7 July 2030 - - 100%
Uranium Project, Queensland
Tenement Owned by Status
Acquired
Interest during
Quarter
Disposed
Interest during
Quarter
Interest at end of
Quarter
EPM 27565 Greenvale Utilities Pty Ltd Current to 23 February 2027 - - 100%
Tenement Applicant Status
EPM 29203 Greenvale Utilities Pty Ltd Under Application - - 100%
Uranium Projects, Northern Territory
The Company holds an exclusive right to acquire up to 80% of the legal and beneficial interest in the Northern Territory Uranium
Projects under is Farm-in Agreement with Gempart (NT) Pty Ltd
Tenement Owned by Status
Acquired
Interest during
Quarter
Disposed
Interest during
Quarter
Interest at end of
Quarter
EL 33670 Greenvale Utilities Pty Ltd Current to 19 May 2030 - - 80%
EL 34157 Greenvale Utilities Pty Ltd Current to 17 February 2032 - - 80%
EL 33756 Greenvale Utilities Pty Ltd Current to 26 September 2030 - - 80%
EL 33637 Greenvale Utilities Pty Ltd Current to 14 April 2030 - - 80%
EL 33638 Greenvale Utilities Pty Ltd Current to 14 April 2030 - - 80%
Tenement Applicant Status
ELA 33900 Greenvale Utilities Pty Ltd Under Application - - 80%
ELA 34114 Greenvale Utilities Pty Ltd Under Application - - 80%
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Greenvale Energy Ltd
ABN Quarter ended (“current quarter”)
54 000 743 555 31 March 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date (9
months)
$A’000
1. Cash flows from operating activities
1.1 Receipts from customers
1.2 Payments for
(a) exploration & evaluation (22) (22)
(b) development
(c) production
(d) staff costs
(e) administration and corporate costs (305) (971)
1.3 Dividends received (see note 3)
1.4 Interest received 4 24
1.5 Interest and other costs of finance paid
1.6 Income taxes paid
1.7 Government grants and tax incentives 359 359
1.8 Other (provide details if material) 60 60
1.9 Net cash from / (used in) operating activities 96 (550)
2. Cash flows from investing activities
2.1 Payments to acquire or for:
(a) entities
(b) tenements - (47)
(c) property, plant and equipment
(d) exploration & evaluation (170) (1,669)
(e) investments
(f) other non-current assets
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Consolidated statement of cash flows Current quarter
$A’000
Year to date (9
months)
$A’000
2.2 Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
2.3 Cash flows from loans to other entities
2.4 Dividends received (see note 3)
2.5 Other (provide details if material)
2.6 Net cash from / (used in) investing activities (170) (1,716)
3. Cash flows from financing activities
-
(16)
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
1,897
3.2 Proceeds from issue of convertible debt
securities
3.3 Proceeds from exercise of options
3.4 Transaction costs related to issues of equity
securities or convertible debt securities (61)
3.5 Proceeds from borrowings
3.6 Repayment of borrowings
3.7 Transaction costs related to loans and
borrowings
3.8 Dividends paid
3.9 Other (provide details if material)
3.10 Net cash from / (used in) financing activities (16) 1,836
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
1,779 2,118
4.2 Net cash from / (used in) operating activities
(item 1.9 above)
96 (550)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(170) (1,716)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
(18) 1.836
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Consolidated statement of cash flows Current quarter
$A’000
Year to date (9
months)
$A’000
4.5 Effect of movement in exchange rates on cash
held
- -
4.6 Cash and cash equivalents at end of period 1,688 1,688
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 228 379
5.2 Call deposits 1,400 1,400
5.3 Bank overdrafts
5.4 Other (provide details)
5.5 Cash and cash equivalents at end of quarter
(should equal item 4.6 above)
1,688 1,779
6. Payments to related parties of the entity and their associates Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their associates
included in item 1
71
6.2 Aggregate amount of payments to related parties and their associates
included in item 2
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an explanation
for, such payments.
More information concerning the breakdown of the above payments to directors and their related parties can be
found within the accompanying Quarterly Activities Report.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities 1,000 -
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities 1,000 -
7.5 Unused financing facilities available at quarter end 1,000
7.6 Include in the box below a description of each facility above, including the lender, interest rate,
maturity date and whether it is secured or unsecured. If any additional financing facilities have
been entered into or are proposed to be entered into after quarter end, include a note
providing details of those facilities as well.
(a) Loan facilities – directors
The unsecured at-call loans to the Company from related parties, with the following terms:
• interest at 15.00% per annum; and
• once drawn, to be repaid at the earlier of the next capital raising (including an offer
entitlement) or 18 months from when the final drawdown has been made by the Company.
At the end of the quarter and as at the date of this report the facility is undrawn.
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) 96
8.2 (Payments for exploration & evaluation classified as investing activities)
(item 2.1(d))
(170)
8.3 Total relevant outgoings (item 8.1 + item 8.2) (75)
8.4 Cash and cash equivalents at quarter end (item 4.6) 1,688
8.5 Unused finance facilities available at quarter end (item 7.5) 1,000
8.6 Total available funding (item 8.4 + item 8.5) 2,688
n/a
8.7 Estimated quarters of funding available (item 8.6 divided by item
8.3)
36.0
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”. Otherwise, a
figure for the estimated quarters of funding available must be included in item 8.7.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A.
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it believe that they will
be successful?
Answer: N/A.
8.8.3 Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1 This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2 This statement gives a true and fair view of the matters disclosed.
Date: 24 April 2026
Authorised by: The Board of Directors of Greenvale Energy Ltd
(Name of body or officer authorising release – see note 4)
Notes
1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that
wishes to disclose additional information over and above the mini
Share your feedback
Discover