JUNE 2026 QUARTERLY ACTIVITIES REPORT
Major portfolio expansion establishes a significant Northern Territory uranium
discovery and growth platform as 2026 exploration field season commences
Greenvale Energy Limited ASX: GRV (“Greenvale” or “the Company”) is pleased to report on its
activities for the June 2026 Quarter, during which it executed an agreement to significantly
expand its Northern Territory uranium portfolio through the proposed acquisition of the uranium
rights to the Pine Creek Uranium Project. The Company also commenced its 2026 field season
with an airborne survey over part of its NT tenure while continuing to advance the Alpha Project
through product characterisation and downstream development work.
The Quarter marked a major step-change in Greenvale’s evolution as an emerging uranium
explorer. The proposed Pine Creek acquisition, together with the Company’s existing Douglas
River tenure, establishes a district-scale exploration footprint in the Pine Creek region. The
expanded portfolio includes the high-grade Thunderball Uranium Deposit and multiple drill-
ready targets – providing a strong platform for discovery and positioning Greenvale to pursue the
next significant uranium development in the Northern Territory.
Highlights
Binding term sheet executed to acquire the uranium rights over the Pine Creek
Uranium Project held by Patronus Resources (ASX: PTN), including the high-grade
Thunderball Uranium Deposit, multiple granted exploration licences, drill-ready
targets and advanced uranium prospects.
The Pine Creek Uranium Project, when combined with Greenvale’s Douglas River
Project, establishes a district-scale uranium exploration footprint of approximately
2,466km2
in the world-class Pine Creek region of the Northern Territory.
Greenvale’s 2026 exploration field season commenced with a 4,312 line-kilometre
airborne radiometrics survey over the Douglas River Project EL34157, with results
released subsequent to the quarter-end.
NT Government Exploration Grant for Regional Geophysics awarded under Round 19
of the Geophysics and Drilling Collaboration program, supporting a planned airborne
electromagnetic survey across EL34157, to be flown in H2 CY2026.
Alpha Project Test Program 7 progressed through the completion of bulk pressure
leach production, with samples assessed by Technix in New Zealand and light-end
fractions successfully removed through atmospheric and vacuum distillation.
Alpha product characterisation passed flash point assessment against C-170
specification requirements and recorded penetration results within the C-170 range,
with viscosity enhancement the focus of the next product development stage.
Greenvale Energy Limited ASX Release
Page | 2
Operational Activities
Thunderball Uranium Project – Pine Creek Region, Northern Territory
Pine Creek Uranium Project Acquisition – During the Quarter, Greenvale announced that it had
entered into a binding term sheet with Patronus Resources (ASX: PTN) (“Patronus”) to acquire
uranium rights for the Pine Creek Uranium Project in the Northern Territory. The acquisition
represents a major strategic step towards achieving Greenvale’s objective of building a
significant uranium exploration and growth platform in the Pine Creek region, a proven uranium
province with a long history of uranium mining and exploration success.
The Pine Creek Uranium Project includes multiple granted Exploration Licences and Mining
Leases covering approximately 1,250km2
across the Pine Creek Orogen. When combined with
Greenvale’s existing Douglas River Project, the consolidated project area creates a continuous,
district-scale uranium exploration footprint of approximately 2,466km2
. The combined project
area will be referred to as the Thunderball Uranium Project moving forward.
Figure 1 – the Thunderball Uranium Project
The expanded portfolio includes the high-grade Thunderball Uranium Deposit, together with
multiple prospects and target areas along and adjacent to the Hayes Creek Fault Zone, a major
regional structure interpreted to be a key control on uranium mineralisation in the southern Pine
Creek Orogen.
Greenvale Energy Limited ASX Release
Page | 3
The most advanced targets are located along a corridor extending from Thunderball and include
Thunderball Extended, Moonraker, Goldeneye, Corkscrew, the Bella Rosa Trend and Burrundie
Dome.
Recent re-assaying and drilling by Patronus confirmed1
the exceptional grade of the Thunderball
deposit, including:
- 10m @ 25,381ppm U3O8 from 145m in TPCDD026;
- 10m @ 12,264ppm U3O8 from 139m in TPCRD019; and
- 13m @ 7,045ppm U3O8 from 135m in TPCRD093.
The transaction is subject to conditions including completion of legal due diligence, shareholder
approval for the issue of consideration shares, third-party approvals where required, execution
of a formal Uranium Rights Agreement and receipt of relevant statutory, regulatory and ASX
approvals.
2026 field season underway – Greenvale commenced its 2026 field season with the completion
of a major airborne magnetics and radiometric survey over EL34157 (part of Greenvale’s existing
Douglas River Project and sharing a border with the Pine Creek Uranium Project) which forms
part of the expanded Thunderball Uranium Project. The survey was completed by Thomson
Airborne Geophysical Survey between 14 and 17 June 2026 and comprised 4,312.97 line
kilometres at a close 100m line spacing and flight height of 50m above ground level.
The survey was designed to provide high-resolution magnetic and radiometric coverage across
EL34157, including the Hayes Creek Fault Zone and the contact between the Pine Creek Orogen
and the Birrindudu/Daly Basins. The survey lines were oriented east-west, considered optimal
for mapping features with multiple strike directions. Once processed and interpreted, the data is
expected to provide an important exploration vectoring tool for ground follow-up and future drill
target generation.
The survey also fills a geophysical data gap across EL34157 (refer to figure 2) and will
complement existing historical and government datasets. Field teams were being secured at the
end of the Quarter to commence ground-based follow-up of targets following receipt and review
of the processed survey data.
Native Title and Land Access – The tenement application process (to convert ELA to EL) has
involved ongoing Native Title consultations and the formal National Native Title Tribunal (NNTT)
process with the Northern Land Council (NLC) and, in particular, the communities of the
Wagiman, Waral and Jawoyn Peoples.
During the Quarter, the company commenced direct negotiations with the NLC outside of the
NNTT process. The Company is pleased with the progress it has made with NLC through this
direct engagement and continues to work to support an outcome that will result in the granting
of ELA 33900 and ELA34114.
1 Refer to ASX Announcement GRV Consolidated a Major Uranium District in the NT released 15 June 2026
Greenvale Energy Limited ASX Release
Page | 4
Figure 2 – Uranium Project area with radiometric data gap over EL34157
Oasis Uranium Project (100%) – EPM 27565, Queensland
At the end of the March 2026 Quarter, the Company’s immediate focus for Oasis was ground-
truthing regional targets through mapping and sampling once weather and access conditions
improved. During the June Quarter, the strategic priority across the uranium portfolio shifted
toward the Northern Territory. Oasis remains a key advanced, high-grade uranium asset in
Queensland and an important part of Greenvale’s uranium portfolio. The Company expects to
undertake its planned mapping and sampling program in H2 CY2026.
Greenvale Energy Limited ASX Release
Page | 5
Elkedra-Henbury Uranium Project (80%) –EL33756, EL33637 and EL33638, NorthernTerritory
No work was completed on the Elkedra-Henbury Project during the Quarter. Sentinel-2
multispectral data has been acquired and is currently being interpreted.
Alpha Project (100%) – MDL 330 and EPM27718, Queensland
The Alpha Project continuedto advance during theQuarter,with Test Program 7 (TP7)progressing
from bulk pressure leach production to downstream product assessment and development.
In April, the Company reported that TP7 Milestone 3 had been successfully completed, marking
the conclusion of pressure leach liquefaction bulk sample production at Monash University.Bulk
production runs consistently achieved conversion rates and recovery of primary materials in line
with the optimal results from previous test work programs2
.
Samples from the Monash production runs were dispatched to Technix in New Zealand for
product characterisation and initial assessment. Technix was engaged to assess key parameters
including flash point, boiling point distribution, viscosity, penetration, chemical assay, durability
and density, and to determine the best downstream refinement or modification pathway toward
C-170 specification compliance.
In June, Greenvale reported that Technix had completed its initial assessment of Alpha product
samples. The assessment identified that the sample initially contained elevated volatile content,
with boiling point distribution analysis indicating approximately 35-40% volatile hydrocarbons.
Technix successfully removed the light-end (volatile) fractions through atmospheric and vacuum
distillation, after which the re-tested material passed flash point assessment against C-170
specification requirements under AS/NZS 2341.143
.
Penetration test work indicated compliance within the C-170 specification, however, viscosity
performance at 60°C and 135°C remained below typical C-170 bitumen specifications. As a
result, Technix recommended the application of its Multistage Bitumen Process (TMBP), which
introduces additional reagents and additives in a pressurised environment to improve viscosity
and penetration characteristics.
Subsequent to the end of the Quarter, the Company commenced this phase of work.
The Alpha Project remains strategically important given Australia’s reliance on imported crude-
oil-derived products, and the tightening domestic and global bitumen supply environment. The
Company will continue to update the market as the product development and certification
pathway advances.
Millungera Basin Geothermal Project (100%) – EPG 2023, EPG 2024 and EPG 2025 –
Queensland
No material field work was reported at the Millungera Basin Geothermal Project during the
Quarter. The project remains subject to the previously announced Farm-in and future Joint
Venture pathway with SRL Hot Rocks Pty Ltd, a wholly owned subsidiary of Sunrise Energy
Metals.
2
Refer to ASX Announcement Alpha Test Program Advances to next phase released 8 April 2026
3
Refer to ASX Announcement Alpha Testwork Progress update released 9 June 2026
Greenvale Energy Limited ASX Release
Page | 6
Longreach Geothermal Project (100%) – EPG 2029 Queensland
During the Quarter, the Company was formally advised by the Queensland Department of
Natural Resources and Mines, Manufacturing and Regional and Rural Development that EPG
2029 had been successfully surrendered with no further obligations on the Company. The
Company expects its initial bonding requirements for EPG2029 (approximately $10,000) to be
returned in H2CY2026.The Company has no further involvement with the Longreach Geothermal
Project.
Schedule of Tenements
The Company’s tenement schedule is provided in Appendix 1.
ESG and Sustainability
During the Quarter, Greenvale continued stakeholder engagement across its uranium
exploration portfolio, including engagement relevant to Northern Territory exploration planning
and the proposed Pine Creek Uranium Project acquisition. Stakeholder engagement is expected
to continue as the Company progresses field work, geophysical interpretation, ground follow-up
and planning for future drilling at the Thunderball Uranium Project. The Company remains
committed to safe, responsible and respectful exploration practices, including engagement with
Traditional Owners, pastoralists, landholders and relevant regulatory authorities.
Finance
Cash Position
The Company held cash and cash equivalents of approximately $1.8 million (unaudited) at 30
June 2026.
Subsequent to the end of the Quarter, the Company completed a capital raising securing $3.35
million (before costs) through a placement of $3.25 to institutional and sophisticated investors
and a commitment from Greenvale Directors for $100,000, subject to shareholder approval.
Exploration Expenditure
During the Quarter, the Company invested approximately A$235,000 in exploration and
evaluation activities across its project portfolio. Approximately 99% related to uranium
exploration.
R&D Expenditure and Tax Rebate
During the Quarter, a further A$250,000 was spent on R&D for the Alpha Project, with a financial
2025/26 year-to-date R&D expenditure of approximately A$600,000. The company is in the
process of preparing the FY2026 R&D tax claim and expects to receive approximately $200,000
as an R&D rebate. It is expected that these funds will be received in Q1 CY2027.
NT Geophysics and Drilling Collaboration Program Grant
During the Quarter, Greenvale received confirmation of an Exploration Grant administered by the
Northern Territory Geological Survey under Round 19 of the Geophysics and Drilling
Collaboration program.
Greenvale Energy Limited ASX Release
Page | 7
The grant of matched funding up to $132,000, will support a proposed airborne electromagnetic
survey over EL34157, designed to improve resolution across the Hayes Creek Fault Zone and the
Pine Creek Orogen-Birrindudu/Daly Basin contacts. The proposed survey will in-fill existing AEM
coverage and support targeting for multiple uranium deposit styles.
Other Disclosure
As disclosed under item 6 in Appendix 5B, the Company made payments to related parties for a
total consideration of A$170,000 This consideration relates to payments attributable to routine
Director fees including statutory superannuation. The Company maintains a Director-provided
finance facility, which remains undrawn. The Company therefore ended the Quarter with zero
debt.
The Company confirms that there was no mine production nor mine development activities for
the Quarter.
Corporate Activity
Appointment of Company Secretary and Chief Financial Officer
During the Quarter, the Company advised of the appointment of Ms Carla Healy as Company
Secretary and Chief Financial Officer.
Change of Registered Office
From 1 May 2026, the Company’s Registered Office changed to Ground Floor, 41-47 Colin Street,
West Perth, WA, 6005. All other primary contact details remain the same.
Capital Structure
At the end of the Quarter, the Company had 592,735,588 shares, 15,500,000 performance rights
and 21,556,122 unlisted options, (exercise price of $0.07 and expiry of 30 November 2026) on
issue.
Key ASX Announcements during the Quarter
Alpha Project Test Program advances to the next phase dated 8 April 2026
RRS Gather Round Presentation dated 9 April 2026
Appointment of Company Secretary and CFO dated 1 May 2026
RIU Investor Conference Presentation dated 6 May 2026
Alpha Test work Program update dated 9 June 2026
GRV Consolidates a Major Uranium District dated 15 June 2026
Pine Creek Acquisition Presentation dated 23 June 2026
Field season commences with major airborne survey dated 24 June 2026
All announcements are available at: greenvaleenergy.com.au/announcements
Authorised for release
This announcement has been approved for release by the Board of Directors.
Greenvale Energy Limited ASX Release
Page | 8
For further information please contact
Alex Cheeseman Nicholas Read
Managing Director Read Corporate
E: admin@greenvaleenergy.com.au E: nicholas@readcorporate.com.au
M: +61(0) 485 603 120 M: +61(0)419 929 046
About Greenvale Energy Limited Greenvale is an ASX-listed exploration company, committed to building a
portfolio of projects that will support the need for clean energy and critical infrastructure. The Company
is building a large land holding in the world-class Pine Creek region of the Northern Territory, and also
owns the advanced, high-grade Oasis Uranium Project in Queensland. The Company has additional new-
energy/forward facing projects including the strategically significant Alpha Project. Greenvale’s projects
are all aligned with the global need for reliable, sustainable, low-emissions energy and supply chains.
The Company believes the best way to create long-term shareholder value is by investing in exploration,
to make discoveries and grow its resource-base.
Compliance Statement This announcement contains information on the Oasis, Douglas River and Alpha
projects, extracted from ASX market announcements dated 13 November 2023, 11 February 2026, 26
February 2026, 6 March 2026, 16 March 2026, 8 April 2026, 9 June 2026, 15 June 2026 and 24 June 2026
reported in accordance with the JORC Code 2012 Edition and available for viewing at
greenvaleenergy.com.au/announcements. The Company confirms that it is not aware of any new
information or data that materially affects the information included in any original announcement and that
all material assumptions and technical parameters underpinning the estimates in the original market
announcement continue to apply and have not materially changed.
Forward Looking Statements This announcement may contain certain forward-looking statements and projections.
Such forward looking statements/projections are estimates for discussion purposes only and should not be relied
upon. Forward looking statements/projections are inherently uncertain and may therefore differ materially from
results ultimately achieved. The Company does not make any representations and provides no warranties concerning
the accuracy of the projections and disclaims any obligation to update or revise any forward-looking
statements/projects based on new information, future events or otherwise except to the extent required by applicable
laws. While the information contained in this report has been prepared in good faith, neither the Company nor any of
its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to the
fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
announcement.
Greenvale Energy Limited ASX Release
Page | 9
Appendix 1 – Schedule of Tenements at 30 June 2026
Alpha Project, Queensland
Tenement Owned by Status
Acquired
Interest during
Quarter
Disposed
Interest during
Quarter
Interest at end of
Quarter
MDL 330 Alpha Resources Pty Ltd Current to 31 January 2027 - - 100%
EPM 27718 Alpha Resources Pty Ltd
Renewal submitted Feb 2026 -
determination pending
- - 100%
Geothermal Projects, Queensland
Tenement Owned by Status
Acquired
Interest during
Quarter
Disposed
Interest during
Quarter
Interest at end of
Quarter
EPG 2023 Greenvale Energy Ltd Current to 18 September 2030 - - 100%
EPG 2024 Greenvale Energy Ltd Current to 11 September 2030 - - 100%
EPG 2025 Greenvale Energy Ltd Current to 5 November 2030 - - 100%
EPG 2029 Greenvale Energy Ltd Current to 7 July 2030 - 100% 0
Uranium Project, Queensland
Tenement Owned by Status
Acquired
Interest during
Quarter
Disposed
Interest during
Quarter
Interest at end of
Quarter
EPM 27565 Greenvale Utilities Pty Ltd Current to 23 February 2027 - - 100%
Tenement Applicant Status
EPM 29203 Greenvale Utilities Pty Ltd Under Application - - 100%
Uranium Projects, Northern Territory
The Company holds an exclusive right to acquire up to 80% of the legal and beneficial interest in the Northern Territory Uranium
Projects under is Farm-in Agreement with Gempart (NT) Pty Ltd
Tenement Owned by Status
Acquired
Interest during
Quarter
Disposed
Interest during
Quarter
Interest at end of
Quarter
EL 33670 Greenvale Utilities Pty Ltd Current to 19 May 2030 - - 80%
EL 34157 Greenvale Utilities Pty Ltd Current to 17 February 2032 - - 80%
EL 33756 Greenvale Utilities Pty Ltd Current to 26 September 2030 - - 80%
EL 33637 Greenvale Utilities Pty Ltd Current to 14 April 2030 - - 80%
EL 33638 Greenvale Utilities Pty Ltd Current to 14 April 2030 - - 80%
Tenement Applicant Status
ELA 33900 Greenvale Utilities Pty Ltd Under Application - - 80%
ELA 34114 Greenvale Utilities Pty Ltd Under Application - - 80%
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Greenvale Energy Ltd
ABN Quarter ended (“current quarter”)
54 000 743 555 30 June 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date (12
months)
$A’000
1. Cash flows from operating activities
1.1 Receipts from customers - -
1.2 Payments for
(a) exploration & evaluation - (22)
(b) development - -
(c) production - -
(d) staff costs - -
(e) administration and corporate costs (420) (1,391)
1.3 Dividends received (see note 3) - -
1.4 Interest received 24 48
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - 359
1.8 Other (provide details if material) - 60
1.9 Net cash from / (used in) operating activities (396) (946)
2. Cash flows from investing activities
2.1 Payments to acquire or for:
(a) entities -
(b) tenements - (47)
(c) property, plant and equipment -
(d) exploration & evaluation (485) (2,154)
(e) investments -
(f) other non-current assets -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Consolidated statement of cash flows Current quarter
$A’000
Year to date (12
months)
$A’000
2.2 Proceeds from the disposal of:
-
-
-
-
-
-
-
-
-
-
-
-
-
-
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
2.3 Cash flows from loans to other entities
2.4 Dividends received (see note 3)
2.5 Other (provide details if material)
2.6 Net cash from / (used in) investing activities (485) (2,201)
3. Cash flows from financing activities
-
-
-
-
-
-
-
-
-
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
1,897
3.2 Proceeds from issue of convertible debt
securities -
3.3 Proceeds from exercise of options -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities (61)
3.5 Proceeds from borrowings -
3.6 Repayment of borrowings -
3.7 Transaction costs related to loans and
borrowings -
3.8 Dividends paid -
3.9 Other (provide details if material)
-
3.10 Net cash from / (used in) financing activities - 1,836
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
1,688 2,118
4.2 Net cash from / (used in) operating activities
(item 1.9 above)
(396) (946)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(485) (2,201)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
- 1,836
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Consolidated statement of cash flows Current quarter
$A’000
Year to date (12
months)
$A’000
4.5 Effect of movement in exchange rates on cash
held
- -
4.6 Cash and cash equivalents at end of period 807 807
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 403 228
5.2 Call deposits 404 1,400
5.3 Bank overdrafts - -
5.4 Other (provide details) - -
5.5 Cash and cash equivalents at end of quarter
(should equal item 4.6 above)
807 1,688
6. Payments to related parties of the entity and their associates Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their associates
included in item 1
170
6.2 Aggregate amount of payments to related parties and their associates
included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an explanation
for, such payments.
More information concerning the breakdown of the above payments to directors and their related parties can be
found within the accompanying Quarterly Activities Report.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities 1,000 -
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities 1,000 -
7.5 Unused financing facilities available at quarter end 1,000
7.6 Include in the box below a description of each facility above, including the lender, interest rate,
maturity date and whether it is secured or unsecured. If any additional financing facilities have
been entered into or are proposed to be entered into after quarter end, include a note
providing details of those facilities as well.
(a) Loan facilities – directors
The unsecured at-call loans to the Company from related parties, with the following terms:
• interest at 15.00% per annum; and
• once drawn, to be repaid at the earlier of the next capital raising (including an offer
entitlement) or 18 months from when the final drawdown has been made by the
Company.
At the end of the quarter and as at the date of this report the facility is undrawn.
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (396)
8.2 (Payments for exploration & evaluation classified as investing activities)
(item 2.1(d))
(485)
8.3 Total relevant outgoings (item 8.1 + item 8.2) (881)
8.4 Cash and cash equivalents at quarter end (item 4.6) 807
8.5 Unused finance facilities available at quarter end (item 7.5) 1,000
8.6 Total available funding (item 8.4 + item 8.5) 1,807
8.7 Estimated quarters of funding available (item 8.6 divided by item
8.3)
2.05
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”. Otherwise, a
figure for the estimated quarters of funding available must be included in item 8.7.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A.
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it believe that they will
be successful?
Answer: N/A.
8.8.3 Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1 This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2 This statement gives a true and fair view of the matters disclosed.
Date: 29 July 2026
Authorised by: The Board of Directors of Greenvale Energy Ltd
(Name of body or officer authorising release – see note 4)
Notes
1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that
wishes to disclose additional information over and above the minimum required under the Listing Rules is encouraged to do so.
2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows
apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by
ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4. If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the [name of
board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a disclosure committee,
you can insert here: “By the Disclosure Committee”.
5. If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out
as complying with re
Share your feedback
Discover