MARCH 2025 QUARTERLY REPORT
ACQUISITION OF HIGH-GRADE OASIS URANIUM PROJECT
COMPLETED; SUCCESSFUL $1.8M CAPITAL RAISING TO UNDERPIN
IMPENDING URANIUM EXPLORATION PROGRAMS
Highlights
Australian Uranium Projects (NT and Queensland)
• Acquisition of 100% interest in the advanced high-grade Oasis Uranium Project in
Queensland completed, adding a new high-potential uranium asset to Greenvale’s existing
uranium portfolio.
• Located 50km west of the town of Greenvale in FNQ, the Oasis Project covers 90km2 of fault
bound alkaline intrusive and metamorphic terrane which includes the high-grade Oasis
uranium deposit and eight additional high-priority uranium targets.
• Stage 1 exploration to comprise initial geological field prospecting and reconnaissance
programs across the project area.
• Preparations well advanced for the Company’s maiden drilling program at the Oasis Project
and its NT projects, with drilling ready to commence as soon as weather conditions permit.
Alpha Torbanite Project, QLD (100%-owned):
• Liquefaction Test Program 6 successfully completed by The University of Jordan (UofJ).
Asphaltene conversion increased to highest levels to date and viscosity levels lowered
moving Greenvale closer to meeting the premium C170 requirements.
• The purpose of Test Program 6 was to optimise test conditions by introducing different
catalysts to enhance the viscosity of the final bitumen product in order to achieve a
premium-grade C170 product from the Alpha Project. With the lower viscosity we believe
are now close to C170 requirements Test Program 7 will confirm this.
• The introduction of catalysts improved overall conversion and increased the asphalt
material content under optimal conditions. The introduction of catalyst Zn to the Tolune
carrier 38.9% (wt%) conversion of product was achieved, which is the highest conversion to
date.
• Substituting THF (tetrahydrofuran) for toluene as a solvent had a significant positive impact
on asphalt material conversion. With no introduction of catalyst reaching 36.2% (wt%)
conversion of product, lowered viscosity and lowest gas yields.
Corporate:
• Successful A$1.8 million non-underwritten placement completed, with proceeds to be
used to commence upcoming exploration programs at the Oasis Uranium Project, where
drilling is scheduled to commence in the June Quarter, as well as upcoming exploration
across the Company’s highly prospective portfolio of uranium projects in in the Northern
Territory.
• Sale proceeds of $250,000 received in consideration for the sale of the Company’s stake in
the EP145 project to Mosman Oil & Gas.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Rule 5.5
Projects
Oasis Uranium Project
During the Quarter, Greenvale completed the acquisition of a 100% interest in the advanced,
high-grade Oasis Uranium Project.
The Oasis deposit and associated regional uranium anomalism are contained within EPM
27565, which covers 53 sub-blocks over an area of 90km2. The project is located 250km west
of Townsville and 50km west of Greenvale’s assets in Far North Queensland (Figure 1). The
project area is located entirely within the Lynd Station pastoral land.
The Company acquired the 100% interest from the vendors Maverick Exploration Pty Ltd,
Remlain Pty Ltd and Mineral Intelligence Pty Ltd (equal 1/3 each interest) for a consideration
of $200,000 cash and the issue of 20 million Greenvale shares.
Figure 1: Location – Oasis Project
Ground-based exploration activities will commence at the Oasis Project during the June 2025
Quarter, with the Company’s planned work programs during 2025 to comprise:
Stage 1.1
Regional Program: Initial geological field prospecting / reconnaissance / assessment of project
area.
Stage 1.2
Upgrade existing Mineral Resource at the Oasis deposit to JORC compliance and undertake
an initial economic assessment.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Rule 5.5
Stage 2
Follow-up field program, including geophysical and geochemical surveys across the Oasis
Prospect and regional areas.
Stage 3
Follow-up drill testing – scheduled to commence as soon as weather conditions permit.
Alpha Project, Queensland
During the Quarter, Greenvale reported results from liquefaction Test Program 6 (TP6) on
samples from the Alpha Project. TP6 was undertaken by the University of Jordan (UofJ), a
world-class institution with significant expertise in geotechnical/chemical engineering,
liquefaction studies and bituminous products.
TP6 was designed to enhance the work undertaken in Test Program 5 (see ASX
Announcement 24 October 2024), which indicated that with fine tuning of the experimental
parameters – particularly pressure, temperature and catalyst selection – it could achieve a
viscosity in the range of C170 asphalt.
TP6 involved a broad spectrum of studies which included numerous experimental runs on
GM14, specifically designed to explore the behaviour and efficiency of the liquefaction process
under varying conditions. The primary technique employed in TP6 involved the liquefaction of
Alpha core sample using toluene and THF (tetrahydrofuran) as a solvent within a specialised
reactor system.
This test program focused on optimising the conversion of oil shale into asphalt materials by
examining the effect of using THF as a carrier without a catalyst and employing catalysts under
toluene as a carrier. TP6 consisted of 11 experiments in total and the results from these were
presented in full in the Company’s ASX Announcement dated 8 April 2025.
Four catalysts – Fe, Sn, Cu and Zn – were tested. The findings showed that conversion and
useful product yield improved under optimal conditions (400°C), with Zn achieving the highest
conversion of asphalt materials 38.9 (wt%), which is the highest conversion to date. Notably,
pre-asphaltene conversion increased significantly in the catalytic runs with Sn and Zn.
The asphaltene content remained nearly identical across all experiments but was significantly
lower than in the toluene run without a catalyst. Additionally, the THF run without a catalyst
showed higher conversion than the toluene run without a catalyst. It is also worth noting that
gas conversion was lower compared to the toluene runs.
The viscosity of the catalytic runs under toluene was significantly lower than that of the toluene
run without a catalyst, due to the catalyst's effect on product characteristics. Among all
experiments, the THF run exhibited the lowest viscosity. However, it should be noted that
viscosity measurements carry a degree of uncertainty due to the limited sample size and the
necessity of THF dilution.
The lower viscosity and higher conversion of product yield provides the Company with
confidence that we are close to the optimal conditions to achieve the aim of producing C170
grade bitumen.
Greenvale is now working with Monash University (Monash) to plan Test Program 7, which will
use larger bulk samples to give more conclusive results. What test program 6 has highlighted
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Rule 5.5
is that modifications are required to the Monash liquefaction test apparatus to enable it to
replicate the test conditions of Test Program 6. Monash University is currently working with a
third party to implement these required modifications, which will allow Test Program 7 to
commence.
Corporate Activities
Capital Raising
Greenvale successfully raised A$1.8 million during the Quarter through a share placement to
sophisticated investors.
The Placement was well supported by new and existing shareholders and comprised a fixedprice offering at A$0.048 per share, representing a 21.2% discount to the 5-day VWAP and a
18.6% discount to last close of A$0.059 on 19 March 2025.
The placement resulted in the issue of approximately 37.5 million new ordinary shares and
was completed under the Company’s LR7.1 capacity.
The proceeds, together with existing cash reserves, will allow Greenvale to fast-track its
maiden exploration program at the high-grade Oasis Uranium Project in Queensland, as well
as to advance the next phase of exploration across its portfolio of sandstone-hosted and
unconformity-hosted uranium projects in the Pine Creek Mineral Field of the Northern Territory,
including radiometric surveys and air-core drilling.
The proceeds will also be used to fund the upcoming Test Program 7 at the Alpha Torbanite
Project, with a view to establishing a commercial development pathway for the project, and for
general working capital purposes.
Disposal of Interest in EP145
During the Quarter, Greenvale received $250,000 as consideration for the disposal of its 75%
farm-in interest in the EP145 project to Mosman Oil and Gas Limited.
Appointment of Exploration Manager
During the quarter, Greenvale internally promoted Zoe Stackhouse to Exploration Manager.
As Greenvale steps up to an ambitious field program, the Company identified the need for an
Exploration Manager to ensure are programs are being implemented in a timely manner.
Greenvale have engaged Queensland based Terra Search, an independent geological and
exploration provider, to run the Uranium exploration program, with Ms Stackhouse overseeing.
Ms Stackhouse joined Greenvale in February 2022 and has worked closely with Neil Biddle on
the development of the Uranium exploration program for Oasis and the NT Tenements. Zoe
also worked alongside Mark Turner on the Alpha Project and was responsible for leading the
drilling program and reserves upgrade.
Ms Stackhouse is a geologist with 20 years’ experience, with expertise encompassing all
exploration phases (from concept to execution) and includes target identification, contractor
management, approvals, safety, budgeting and reporting. Zoe a Masters in Geoscience from
the Royal Holloway University of London and is currently the Secretary of the Australian
Geothermal Association.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Rule 5.5
ASX Additional Information
The Company provides the following information pursuant to ASX Listing Rule requirements:
1. ASX Listing Rule 5.3.1:
Exploration and Evaluation Expenditure during the Quarter was $195k. Full details of
exploration activity during the March 2025 Quarter are set out in this report.
Below is the breakdown of the expenditure incurred:
Table 1 Analysis of exploration expenditure
Property
Nature of expenses
Uranium
General Exploration
$24,000
Alpha Project
Alpha Test Program
$149,000
Other
Tenement Management
$22,000
Total Exploration costs
Amount ($)
$195,000
2.
ASX Listing Rule 5.3.2:
The Company confirms that there was no mine production and development activities
for the Quarter.
3.
ASX Listing Rule 5.3.5: Payment to related parties of the Company and their
associates during the quarter was $45,000.
The Company advises that this relates to remuneration of Directors only. Please see
the Remuneration Report in the Company’s Prospectus for further details on Directors’
Remuneration. Set out below is the following additional information in relation to the
cash flow statement:
Authorised for Release
This announcement and the accompanying Appendix 5B have been approved by the
Board for release.
Contact
For further details, contact:
Neil Biddle, Executive Chairman
NBiddle@greenvaleenergy.com.au
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Media Inquiries:
Nicholas Read – Read Corporate
Nicholas@readcorporate.com.au
Mobile: 0419 929 046
Page 5
Rule 5.5
Tenements
In accordance with Listing Rule 5.3.3, Greenvale provides the following Information concerning
its exploration licences:
Tenement Details
Alpha Project, Queensland
Tenement
%age Ownership
MDL 330
100%
EPM 27718
100%
Owned by
Alpha Resources Pty Ltd
Alpha Resources Pty Ltd
Status
Current to 31 January 2027
Current to 14 February 2026
Applicant
Status
Greenvale Energy Ltd
Greenvale Energy Ltd
Greenvale Energy Ltd
Greenvale Energy Ltd
Under Application
Under Application
Under Application
Under Application
Uranium Project, Queensland
Tenement
%age Ownership
EPM 27565
100%
EPM 29203
100%
Owned by
Greenvale Utilities Pty Ltd
Greenvale Utilities Pty Ltd
Status
Current to 23 February 2027
Under Application
Uranium Project, Northern Territory
Tenement
%age Ownership
EL 33670
80%
EL 33756
80%
EL 33637
80%
EL 33638
80%
EL 33621
80%
EL 33692
80%
EL 33900
80%
Owned by
Greenvale Utilities Pty Ltd
Greenvale Utilities Pty Ltd
Greenvale Utilities Pty Ltd
Greenvale Utilities Pty Ltd
Greenvale Utilities Pty Ltd
Greenvale Utilities Pty Ltd
Greenvale Utilities Pty Ltd
Status
Current to 19 May 2030
Current to 26 September 2030
Current to 14 April 2030
Current to 14 April 2030
Current to 14 April 2030
Current to 11 August 2030
Under Application
Geothermal Project, Queensland
Tenement
%age Ownership
Of Applicant
EPG 2023
100%
EPG 2024
100%
EPG 2025
100%
EPG 2029
100%
•
•
•
•
Mining tenements acquired during the quarter and their location: EPM 29203 Application
lodged adjacent to Oasis Project in Northern Queensland
Mining tenements disposed during the quarter and their location: Nil.
The beneficial percentage interests held in farm-in or farm-out agreements at the end of the
quarter: At the end of the quarter, the Company holds an exclusive right to acquire up to 80%
of the legal and beneficial interest in the following exploration licences EL33670, EL33756,
EL33637, EL33638, EL33621, EL33692, ELA 33900 (owned by Gempart (NT) Pty Ltd),
located in the Northern Territory.
The beneficial percentage interests in farm-in or farm-out agreements acquired or disposed of
during the quarter: Nil.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 6
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Greenvale Energy Ltd
Quarter ended (“current quarter”)
ABN
54 000 743 555
31 March 2025
Current quarter
$A’000
Year to date (9
months)
$A’000
(94)
(965)
4
13
1,275
2,126
1,184
1,174
(b) tenements
-
25
(c) property, plant and equipment
-
(23)
(195)
(815)
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs
(e) administration and corporate costs
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Government grants and tax incentives
1.8
Other (provide details if material)
1.9
Net cash from / (used in) operating activities
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
(d) exploration & evaluation
(e) investments
(f)
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 7
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (9
months)
$A’000
-
1,530
(195)
692
1,800
1,800
Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (provide details if material)
2.6
Net cash from / (used in) investing activities
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2
Proceeds from issue of convertible debt
securities
3.3
Proceeds from exercise of options
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
3.5
Proceeds from borrowings
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (provide details if material)
3.10
Net cash from / (used in) financing activities
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
-
-
(2,000)
1,800
(200)
Cash and cash equivalents at beginning of
period
425
1,524
4.2
Net cash from / (used in) operating activities
(item 1.9 above)
1,184
1,174
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(195)
717
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
1,800
(200)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 8
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date (9
months)
$A’000
4.5
Effect of movement in exchange rates on cash
held
-
-
4.6
Cash and cash equivalents at end of period
3,215
3,215
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
3,215
425
3,215
425
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5.2
Call deposits
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of quarter
(should equal item 4.6 above)
6.
Payments to related parties of the entity and their associates
Current quarter
$A'000
6.1
Aggregate amount of payments to related parties and their associates
included in item 1
45
6.2
Aggregate amount of payments to related parties and their associates
included in item 2
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an explanation
for, such payments.
More information concerning the breakdown of the above payments to directors and their related parties can be
found within the accompanying Quarterly Activities Report.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 9
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Total facility
amount at quarter
end
$A’000
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
7.1
Loan facilities
7.2
Amount drawn at
quarter end
$A’000
3,000
-
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
3,000
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest rate,
maturity date and whether it is secured or unsecured. If any additional financing facilities have
been entered into or are proposed to be entered into after quarter end, include a note
providing details of those facilities as well.
3,000
(a)
Loan facilities – directors
The Company announced on 20 October 2022 that it had received a letter of support from its
directors for $3.00 million. The letter of support is to provide an unsecured loan to the Company,
with the following terms:
•
interest at 12.00% per annum; and
•
to be repaid at the earlier of the next capital raising (including an offer entitlement) or
18 months from when the final drawdown has been made by the Company.
8.
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
1,184
8.2
(Payments for exploration & evaluation classified as investing activities)
(item 2.1(d))
(195)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
990
8.4
Cash and cash equivalents at quarter end (item 4.6)
3,215
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
3,215
n/a
8.7
Estimated quarters of funding available (item 8.6 divided by item
8.3)
8.3 is positive
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”. Otherwise, a
figure for the estimated quarters of funding available must be included in item 8.7.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 10
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it believe that they will
be successful?
Answer: N/A
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
Date:
This statement gives a true and fair view of the matters disclosed.
30 April 2025
Authorised by: The Board of Directors of Greenvale Energy Ltd
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that
wishes to disclose additional information over and above the minimum required under the Listing Rules is encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows
apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by
ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the [name of
board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a disclosure committee,
you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out
as complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial records
of the entity have been properly maintained, that this report complies with the appropriate accounting standards and gives a true
and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a sound system of risk
management and internal control which is operating effectively.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 11
Share your feedback
Discover