GREENVALE CLOSING-IN ON ALPHA PFS AS TEST PROGRAM 4
NEARS COMPLETION | HELIUM ACQUISITION IN CENTRAL
AUSTRALIA ADVANCES TOWARDS COMPLETION
Highlights
Alpha Torbanite Project, QLD (100%-owned):
•
Liquefaction Test Program 4 extended to include samples from the October 2023 drill program
which embraced both the Upper and Lower Seams within the Alpha Resource. The extended
program is now nearing completion and is expected to deliver robust oil yields.
•
Greenvale to adopt a staged development approach to bitumen production, with preliminary
studies supporting a conceptual design basis for an initial 100,000tpa bitumen processing
plant at Alpha, later increasing to 200,000tpa. This would position Alpha to supply a portion of
the rapidly growing demand for bitumen and blended products to meet local supplier and
infrastructure needs.
•
Pre-Feasibility Study (PFS) expected to be finalised in Q2 2024.
Geothermal Project, QLD (100%-owned):
•
Native Title discussions for consent of exploration progressing well.
Georgina Basin IOCG Project, NT (20%-owned):on continued for the Ambient Noise Tom
•
Advanced geophysical modelling at the Central Georgina Project area has identified three offhole gravity anomalies at Leichhardt East, Leichhardt West and Banks.
•
High-ranking Leichhardt East target has strong IOCG characteristics as a high-density anomaly
between regional faults with nearby copper-uranium-bismuth-silver anomalism intersected in
previous drilling.
•
Drilling planned to commence at Leichhardt East mid-year.
Corporate:
•
Documentation progressed to achieve Ministerial consent from the Northern Territory
government to effect the change in control of the highly prospective EP145 Permit in the
Amadeus Basin in Central Australia. Completion date for the EP145 farm-in agreement with
Mosman Oil & Gas extended to April 30, 2024. Ministerial consent is expected imminently.
• Conditional agreement with Astute Metals to sell Greenvale’s remaining 20% interest in the
Georgina Basin IOCG Project in the NT to Astute. Consideration is 5 million Astute shares on
completion and a further 5 million Astute shares subject to the meeting of various milestones.
Following completion of the transaction, Greenvale will increase its stake in Astute from 11.21%
to 12.27%. Greenvale continues to hold a 2% net smelter royalty (NSR) over the Georgina
Project, providing exposure to future upside.
GREENVALE
ENERGY
LIMITED
1
Overview
Greenvale Energy Limited (ASX: GRV or the Company) continued to make positive progress
during the March 2024 Quarter, with a primary focus on the completion of Liquefaction Test
Program 4 for its 100%-owned Alpha Torbanite Project in Queensland and the transfer of
operational ownership of highly prospective helium exploration permit, EP145, to the Company
from Mosman Oil & Gas.
During the Quarter, the Company continued to progress Liquefaction Test Program 4 at Alpha
to support the delivery of a Pre-Feasibility Study (PFS). Monash University is now nearing
completion of the test program work, with a final bulk sample now being prepared to be sent
to Technix for product identification and certification.
After consulting with the Company’s technical advisors, the Greenvale management team
extended Test Program 4 during the Quarter to include samples from the core holes acquired
in October 2023, which embraced both the upper and lower seams within the Alpha Resource.
The additional testing is not expected to significantly delay the delivery of the PFS, which –
assuming the smooth completion of the additional testwork – is now expected to be finalised
and delivered in Q2 2024.
The Company is taking a staged approach to the project based on the development of two
trains, with the design of Train 1 underpinned by the results of the Liquefaction Test Programs
completed to date (Programs 1, 2 & 3) and preliminary indications from Test Program 4.
This information has informed the conceptual design basis of the plant, initially aimed at
producing 100,000 tonnes of bitumen and blended products annually from 500,000 tonnes of
mined Resource.
Train 2 would commence on completion of Train 1 construction, and would increase annual
production to 200,000 tonnes of bitumen per annum by expanding the process plant and
increasing mining by a further 500,000 tonnes, resulting in an estimated mine life of 20 years.
In addition to these advancements at Alpha, the Company has also progressed its proposed
acquisition of a potentially ultra-high-grade helium, hydrogen and hydrocarbon opportunity in
the Amadeus Basin in the NT. During the Quarter, the Company submitted all the required
documentation and paid all necessary fees to the Northern Territory Government to enable
the transfer of operational ownership of EP145 to Greenvale.
As Ministerial Consent is yet to be granted, Greenvale has agreed with the vendor, Mosman
Oil & Gas, to vary the terms of the Farm-in Agreement to extend the completion date from 31
March 2024 to 30 April 2024. Should approval occur sooner, the parties will complete at an
earlier date.
GREENVALE
ENERGY
LIMITED
2
Projects
Alpha Project, Queensland
Background
The Company’s flagship 100%-owned Alpha Torbanite Project is located approximately 50km
south of the town of Alpha in Central Queensland. The Alpha torbanite deposit consists of two
seams, an upper seam of mostly lower-grade mineralisation with an average thickness of
1.12m and a lower seam containing lenses of torbanite up to 1.9m thick. The Project has been
subjected to extensive exploration and laboratory testing since its initial discovery in 1939.
During 2019, SRK Consulting Pty Ltd (“SRK”) was engaged to reassess the project’s
commercialisation strategy. SRK’s report set out a potential new development strategy based
on the production of a diversified suite of value-added products. SRK noted that, in contrast
with typical oil shale deposits, the Alpha torbanite deposit is exceptionally high-grade,
containing up to 650 litres of hydrocarbons per tonne of torbanite, and can produce high-value
bitumen products.
The upper and lower bituminous shales also produce similar products, albeit at lower yields of
110-140 litres per tonne. Additionally, the torbanite and bituminous shales can deliver highquality value-added products through appropriate investment in processing infrastructure.
SRK was engaged to undertake a staged work program to assist in evaluating the project's
commercial viability.
Activities during the March Quarter
During the Quarter, the Company continued to progress with the current Liquefaction Test
Program (‘Test Program 4’) and the delivery of a Pre-Feasibility Study (PFS) for the Alpha
Torbanite Project.
The Alpha deposit is currently being analysed on a number of fronts in preparation for the
delivery of the PFS. The key areas of mine planning, processing and product marketing are
all taking shape, with considerable advancements also being made on the initial process plant
design.
GRV is taking a staged approach to the project based on the development of two trains, with
the design of Train 1 underpinned by the results of the completed Liquefaction Test Programs
to date (Programs 1, 2 & 3) and preliminary indications from Test Program 4.
This information has informed the conceptual design basis of the plant, initially aimed at
producing 100,000 tonnes of bitumen and blended products annually from 500,000 tonnes of
mined Resource.
Train 2 would commence on completion of Train 1 construction and would increase annual
production to 200,000 tonnes of bitumen per annum by expanding the process plant and
increasing mining by a further 500,000 tonnes, resulting in an estimated mine life of 20 years.
As previously reported, the Company’s current liquefaction testing regime has focused on the
outcropping materials initially sampled when the program commenced some two years ago.
The results to date have been extremely encouraging with the outcropping material achieving
extremely high yields at temperatures of approximately 400°C.
GREENVALE
ENERGY
LIMITED
3
The latest test program, Test Program 4, has seen the conditions under previous programs
interrogated and then re-performed utilising core samples taken from a representative model
across the maiden (2022) Mineral Resource Estimate (MRE) area.
On 13th November 2023, the Company announced a 51% increase in the size of the Alpha
deposit (ASX Announcement: Substantial Increase to Alpha Resource). The updated Mineral
Resource Estimate (MRE) saw a 9.4Mt increase in the total dry tonnes of the deposit, up from
18.6Mt in the maiden 2022 Resource to 28Mt of combined cannelite and torbanite.
This significant increase in the size of the Alpha deposit has meant that, in order for the
additional 9.4Mt of cannelite and torbanite to be included in final modelling for the PFS, a
supplementary sampling and liquefaction testing campaign will be undertaken on samples
selected from of the 20 additional HQ core holes completed in early October 2023 (see ASX
announcement, 2 October 2023).
The Company had previously envisaged that Liquefaction Test Program 4 would be sufficient
to extrapolate the yield calculations across the additional 9.4Mt of Resource.
However, after consulting with the Company’s technical advisors, the Greenvale management
team believed it is prudent to extend Test Program 4 to include samples from the core holes
acquired in October 2023 which embrace both the upper and lower seams within the Alpha
Resource.
Given that Test Program 4 is nearing completion and that the testing apparatus, technical
teams and third-party partners are all up to speed, it is not anticipated that the additional testing
will result in a significant delay to the delivery of the PFS.
Assuming the smooth completion of the additional testwork, the Company expects to finalise
and deliver the PFS in Q2 2024.
The projected mine life of 20 years is based on preliminary assessments only and this could
be further extended via an additional Train 3. Any future expansions would be contemplated
if further exploration of the known 10km strike length and further metallurgical test work
justifies it. It is important to note that this estimate, while useful for initial planning, does not
fully reflect the mine's operational potential and Resource base.
Drawing on the preliminary insights from Test Program 4, together with the conclusive results
received from the initial three Liquefaction Test Programs, the Train 1 process plant will be
designed to produce 100,000 tonnes of bitumen and blended products annually, underpinned
by a robust and data-driven foundation.
This is further substantiated by several key operational efficiencies and technological
innovations identified through these test programs and the broader development of the
project's PFS.
Firstly, the mining operation benefits from the straightforward extraction of ore from two distinct
and relatively shallow seams, ensuring a reliable and consistent ore feed. The feasibility of
blending different ore layers at the mine face guarantees a steady supply to the plant,
supported by the ease of crushing and the consistently low moisture content of the deposit,
which eliminates the need for additional drying processes.
The strategic choice of an oil-based carrier, together with the plant's ability to adjust product
yield with minor adjustments in temperature and residence time, exemplifies the flexibility and
responsiveness of the design to operational needs.
GREENVALE
ENERGY
LIMITED
4
The cost-effectiveness and availability of the catalyst, combined with the simplicity and
affordability of construction techniques for solids preparation and processing equipment, adds
to the plant's operational viability. The design incorporates environmentally sustainable
practices, such as early separation of asphaltenes, energy recovery from by-products and the
recycling of oils, contributing to the plant's operational efficiency and environmental
performance.
Additionally, specific treatment processes are employed to ensure that solids returned to the
mine are devoid of volatile hydrocarbons, further demonstrating the project's commitment to
minimising its environmental impact. These operational insights, together with the commitment
to tailoring products to meet local bitumen manufacturing demands, not only affirm the
projected annual production volume but also enhance the plant's potential economic and
environmental sustainability.
The final preliminary process plant design is reliant on proving up the deposit and process
yields, work that Greenvale is currently completing.
Technical Discussion
Studies undertaken so far have included:
•
•
•
•
•
•
Variability in the Outcrop ply – Torbanite and the Cannelite yield.
Impact of temperature on the extent of conversion on Outcrop and Core on an “as
received” and “dry ash free” basis.
Impact of the use of a standard liquefaction catalyst versus no added catalyst.
Impact of water versus oil as the carrier fluid to support the liquefaction studies.
Impact of time on the extent of conversion.
Comparison of yields versus Modified Fisher Assay (MFA) conversions.
The products have been analysed from a number of perspectives:
Variable
Gas yield
Oil Yield
Cannelite
Oil yield on
torbanite
Blends
Using toluene
as carrier of
solids for a
batch test
Using water as
a carrier in
liquefaction
trials
Result
Yield is reasonably constant at about 8
wt% average
Oil yield increases with temperature,
finding the best conditions is on going
Better than for Coaly Shale as
anticipated and follows the MFA results
Results are quite predictable by the
ratio of the masses and the respective
liquefaction yields of the different ply
from the deposit
A product which has properties of the
top hardness bitumen used in Australia
were produced.
Good asphalt and relative low oil yields
were achieved. Optimal processing
conditions are relatively difficult to
achieve in a batch reactor so the oil
carrier had been favoured
GREENVALE
ENERGY
LIMITED
Compared with MFA
Gas yield is about 8 wt%
Similar oil yields can be achieved
Oil yield equal to and better than have
been achieved
Similar outcomes as anticipated for
blends of ply when undertaking MFA,
as results are proportional to the
amount of respective ply represented
While not representative of the
process on the proposed plant it is a
clear demonstration of the type of
products which are possible. The
bulk samples were prepared at low
temperatures of about 360C,
increasing this to 400C increases
yields and lightens the products.
These tests are on going
5
Variable
Using a base
lube oil as
carrier
Result
This shows promise with good yields
above the proposed minimum are
achievable. Yields better than MFA
have been achieved, as is expected if
the process has merit.
Compared with MFA
Ongoing work is nearing completion
and the laboratory results will be
added in to the development of the
yield structure for the PFS.
Product is produced to achieve a high yield of the most productive blends:
•
•
•
•
•
•
A range of samples have been produced for testing for use as and incorporating into
bitumen.
The campaigns are ongoing.
The product quality will be targeting local bitumen main products which are based on
viscosity.
Greenvale has produced very high viscosity (over 880 Pa.sec), close to the top hardness
for locally used bitumen. This was derived from low temperatures (370 – 380oC) and long
residence times (over 60 minutes).
Increasing the temperature of the reaction at lower residence times can reduce the
viscosity of the oil closer to the 160 Pa.s for the prime bitumen products.
Australia imports about one million tonnes of bitumen annually. The supply of 100,000
tonnes would not greatly affect a market if the supply is regular and of uniform
specification, which is the benefit of this process over the production of bitumen from
potentially variable refinery heavy bottoms.
Figure 1.
% Yield on As-received basis
80
TP4 Well 28,7MPa, 390-396oC for blend and 400-407oC for torbanite/cannel coal,
Oil as carrier, with catalyst
60
40
Gas
Total Conversion
Oil
Asphaltene
Preasphaltene
Oil+As+PreAs
20
0
0.0
0.2
0.4
0.6
0.8
1.0
Ratio (Cannel coal/Total)
The graph shows that processing of the cannelite and torbanite are not necessarily impacted by
variations in their ratios, hence the blends of feed shale is a weighted average of their relative
performance in isolation. This provides confidence that the processing yields for different blend ratios
can be anticipated with confidence.
GREENVALE
ENERGY
LIMITED
6
Figure 2.
Comparison of yields for Outcrop materials (lines) versus yields for Core samples for Cannelite
Effect of temperature on Blend liquefaction
60
Gas from Core liquefaction
Total conversion from Core liquefaction
Oil from Core liquefaction
Asphaltene from Core liquefaction
Oil+As from Core liquefaction
Gas from Outcrop liquefaction
Total conversion from Outcrop liquefaction
Oil from Outcrop liquefaction
Asphaltene from Outcrop liquefaction
Oil+As from Outcrop liquefaction
% Yield on As-received basis
50
40
30
20
10
0
340
350
360
370
380
390
400
Temperature (oC)
The results show similar yields for both Outcrop material (taken from the weathered zone) compared
to Core taken from wells below the weathering zone. Outcrop material processes well compared with
the Core material and should represent upside to the operation. Core material generally requires
higher temperatures to achieve equivalent yields or a longer processing time.
Figure 3 below shows that the yields from the cannelite require longer processing times. Results
show that the desired conversion of 30% is achievable and is largely unaffected by temperature for
the Core, but the Outcrop materials were positively influenced by the increase in temperature towards
400oC at longer residence times.
The process will be designed to achieve about 420oC as a maximum to ensure the best results are
achieved dependent on the feed material to the plant.
GREENVALE
ENERGY
LIMITED
7
Figure 3.
Effect of temperature on Cannel Coal liquefaction
% Yield on As-received basis
80
Gas from Outcrop liquefaction
Total conversion from Outcrop liquefaction
Oil from Outcrop liquefaction
Asphaltene from Outcrop liquefaction
Oil+Asphaltene from Outcrop liquefaction
Gas from Core liquefaction
Total conversion from Core liquefaction
Oil from Core liquefaction
Asphaltene from Core liquefaction
Oil+As from Core liquefaction
60
40
20
0
340
350
360
370
380
390
400
410
Temperature (oC)
In the following graph, the impact of processing conditions on torbanite is shown for Outcrop and
Core samples.
Figure 4.
Effect of temperature on Torbanite liquefaction
Gas from Core liquefaction
Total conversion from Core liquefaction
Oil from Core liquefaction
Asphaltene from Core liquefaction
Oil+As from Core liquefaction
Gas from Outcrop liquefaction
Total conversion from Outcrop liquefaction
Oil from Outcrop liquefaction
Asphaltene from Outcrop liquefaction
Oil+As from Outcrop liquefaction
% Yield on As-received basis
80
60
40
20
0
340
350
360
370
380
390
400
410
Temperature (oC)
GREENVALE
ENERGY
LIMITED
8
Only three points were studied for Outcrop processing and so the lines are only an estimate of how
yields vary with temperature. However, the Core samples show the positive impact of only 10
degrees with overall conversion increasing from about 38% to over 65% at 400oC. Under these
conditions, the Torbanite Core has performed better than the outcrop material.
A further comparison of yields is being undertaken to compare liquefaction yields with standard MFA
yields for a number of Wells.
Product yields can be as high as MFA or higher. Results show that liquefaction does have advantages
with the correct processing conditions, as can be seen from the following graphs which is plotting
MFA in litres per dry tonne and the liquefaction yield also quoted in these terms using a Specific
Gravity of 0.95.
Well 9 and Well 14 tests are being repeated by Monash to see if improved yields can be achieved in
line with the later results for Well 28 under modified temperature and residence times.
Figure 5.
MFA Oil Yield
Oil+asphaltene yield from experiment
800
800
Relative oil yield from MFA (LTOM)
700
600
600
400-407oC
60 min
500
400
400
300
200
200
100
0
Well 28 Blend
Well 28 L
Well 28 LT
Well 21 Blend
Well 21 L
Well 21 LT
Well 9 Blend
Well 9 L
Well 9 LT
0
Oil+Asphaltene yield (L/T) from experiment daf basis
Comparision between MFA vs experimental Oil +Asphaltene yield
Comparison between MFA and experimental oil + Asphaltene yield from Well 9, 21 and 28 torbanite
and cannelite are shown.
Note tests were conducted at 390 – 395oC for Wells 9 and 21 and higher for the torbanite and
cannelite in Well 28 with conversion equal to or better than MFA for Well 28.
The tests on Well 9 were the first tests undertaken and the temperatures were lower at about 390oC.
Increasing the temperature and time for Well 28 showed a marked increase in conversion of torbanite
to above the MFA yields.
Supporting tests to evaluate yields against an additional number of wells which contain Upper Seam
material are being conducted to confirm that higher yields than MFA are achievable in preparation
for the PFS.
GREENVALE
ENERGY
LIMITED
9
Analytical results are still coming in to provide more detail on the oil fractions produced and will be
reported in due course.
The work to date is focused on an average yield of about 30 wt% of the mined material being
processed into bitumen products on an average blend of torbanite with the cannelite. Where the
torbanite concentrations are higher, there is potential for higher conversions than the target 30%
average yield.
Figure 6.
Comparison of product yields obtained from liquefaction of shale from different wells under TP4
Note, the high yield of oil from torbanite in Well 28 achieved at slightly higher temperatures (390 to
405oC) shows a marked increase in conversion with negligible change in gas production and similar
asphaltene contents. Confirmatory tests are being undertaken to demonstrate the higher yield can be
achieved across other Wells.
The overall programs are now almost finished and, together with the final laboratory analyses, will
provide added detail to the plant design and confidence in the yield values and the product structure
of the yields.
Comparing different bore holes across the deposit under similar conditions provides a basis that the
different ply will process comfortably to an average yield represented by the average mass portions of
the yields of the separate ply. The test results also show that yield structure can be changed by
relatively small variations in temperature and residence time to change products so as to make
desirable products for the market.
Discussions are ongoing on the products and their quality to allow statements to be made in relation
to the likely value of the products.
GREENVALE
ENERGY
LIMITED
10
Geothermal Project, Queensland
Background
Greenvale and its wholly-owned subsidiary, Alpha Resources, is the 100% owner of a number of
Exploration Licences in north Queensland with geothermal energy potential. Geothermal energy
is the heat produced deep in the earth's core. Geothermal energy is regarded as a clean,
renewable resource that can be harnessed for use as heat and electricity.
Activities during the March Quarter
GRV’s geothermal program has continued to focus on the Millungera Basin, where the
Company is exploring avenues for reducing well costs, including potential rig acquisition
tailored to the project's needs. A detailed sub-surface review has commenced to provide a
thorough sub-surface assessment to identify drilling risks and define subterranean stratigraphy
more accurately.
One country meeting was held with the Mitakoodi and Mayi People in February with regards
to consent to obtain agreement to the grant of exploration permits. Due to the number of parties
involved, this is taking longer than originally anticipated and an agreement is now expected to
be in place by Q3 2024.
Next Steps
•
Finalisation of Native Title Agreement allowing the Queensland Government to grant
EPG2023, EPG2024 and EPG2025.
•
Continue with detailed sub-surface review to complete a thorough sub-surface
assessment to identify drilling risks and define subterranean stratigraphy more
accurately.
Georgina Basin IOCG Project, Northern Territory
Background
The Georgina Basin Project is owned by Knox Resources Pty Ltd (Knox), a company which is
20% owned by Greenvale and 80% owned by Astute Metals NL (ASX: ASE). As part of its
ownership of Knox, the Company is required to contribute to the funding of its share of Knox’s
future costs. Greenvale is entitled to a 2% net smelter royalty (Royalty) for all Iron Oxide
Copper Gold (IOCG) product exploited in the future from the existing tenements owned by
Knox.
During the Quarter, the Company entered into a conditional contract for sale to sell its
remaining 20% in Knox Resources to Astute Metals (see below).
Located in the highly prospective East Tennant province in the Northern Territory, the Georgina
Project comprises seven granted Exploration Licences and three under application, for a
combined total of approximately 4,500km2 (Figure 10).
The East Tennant province has been the subject of intense geoscientific investigation by both
Geoscience Australia and the Northern Territory Geological Survey for over five years. Precompetitive work undertaken as part of the Federal Government’s $225 million Exploring for
the Future program (EFTF) included solid geology interpretation, alteration proxy mapping and
mineral prospectivity mapping for IOCG deposits.
GREENVALE
ENERGY
LIMITED
11
The collaborative MinEx CRC National Drilling Initiative, conducted in late 2020, confirmed the
highly prospective nature of the region by intersecting prospective host rocks, IOCG-style
alteration and sulphide mineralisation as part of a 10-hole program at East Tennant.
IOCG deposits are typically large, economically attractive copper-gold deposits with some
smaller high-grade variants – most notably those at Tennant Creek. This style of deposit
contains elevated levels (10-60wt %) of the iron oxide minerals magnetite and hematite, which
gives rise to their (typically) elevated magnetic and gravity (density) properties.
Australian IOCG deposits include South Australia’s Olympic Dam, Prominent Hill, and
Carrapateena deposits, Ernest Henry in north-west Queensland, and the high-grade Northern
Territory Warrego and Juno deposits, located west of the Georgina Project at Tennant Creek.
Work During the Quarter
Work during the Quarter focused on the Central Georgina Project, namely the Leichhardt East,
Leichhardt West and Banks prospects. Using data generated from the Ambient Noise
Tomography (ANT) geophysical survey conducted in 2023, Knox engaged consulting group
Mitre Geophysics (Mitre) to perform a constrained inversion of previously captured gravity
survey data, with a view to removing the effects of the overlying Georgina Basin limestone
cover rocks to produce a more accurate model for where prospective gravity (density)
anomalies reside in the underlying basement.
A specialised workflow was developed by Mitre to bring together gravity, ANT survey and
geological inputs to arrive at the final constrained inversion model for Leichhardt East:
1. A low-velocity zone that is interpreted to approximate the Georgina Basin limestone was
identified in the ANT survey.
2. The lower contact of the low-velocity zone – a deliverable from the ANT survey – and a
topographic surface were used to establish a modelling volume (“Geobody”) for the Georgina
Basin limestone.
3. The lower contact surface was bulk-shifted downward to match an average best fit with the lower
contact of the Georgina Basin limestone in each of the five holes drilled in the central tenement
area.
4. The Georgina Basin limestone was assigned a single density of 2.78, based on open file bulk
wet density data from drill holes in the East Tennant region (Elkedra7, CKAF0001 and
NTGS01/1).
5. The 3D Bouger gravity response of the Georgina Basin limestone Geobody was calculated.
6. A basement-only gravity response was then calculated and resultant anomaly of interest at
Leichhardt East was identified.
7. The anomaly of interest was inverted by two methods – a Windisp UBC inversion and an
alternative solution using ModelVision for comparison.
8. 3D outputs from the inversion methods were compared and evaluated by a Mitre consultant
geophysicist.
The results of the modelling identified discrete high-density gravity anomalies at each of the three
prospects (Figure 7).
GREENVALE
ENERGY
LIMITED
12
Figure 7.
Results - Leichhardt East
The models generated a high-density target approximately 200m off-hole from the Leichhardt
East hole, KNXLE001RDD, which intersected significant polymetallic zones of mineralisation,
including high-grade uranium (Figure 8). Intersections include:
•
•
•
•
0.32m @ 0.24% U3O8, 819ppm Cu and 0.15g/t Ag from 689.09-689.41m
0.90m @ 374ppm U3O8, 11.8ppm Bi and 78.6ppm Cu from 693.3-694.2m
0.75m @ 0.11% U3O8, 40.8ppm Bi and 0.11g/t Ag from 481.1-481.85m
1.04m @ 635ppm Cu and 0.26g/t Ag from 576.34-577.38m
In addition, the target has a favourable structural position, sited between two regional faults as
part of the Geoscience Australia East Tennant dataset, and abutting an interpreted, potentially
later or second order, fault marked by a thin zone of low-level magnetics cutting through
moderate to high intensity magnetic response. As structures are fundamental to fluid flow in
IOCG systems, this configuration of interpreted faults, nested around the dense modelled body
and nearby elevated geochemistry, make Lei
Share your feedback
Discover