Alpha Test Program Three Yields Improved Conversion Rates
Released
Released
Announcement PDF
17 May 2023
ALPHA TORBANITE PROJECT – DEVELOPMENT UPDATE
ALPHA’S BITUMEN-PRODUCING POTENTIAL BOOSTED AFTER
OUTSTANDING RESULTS FROM TEST PROGRAM THREE
Liquefaction Test Program Three has significantly improved conversion rates for
Alpha samples and achieved higher asphaltene/pre-asphaltene contents, further
enhancing the potential of the project to produce bitumen for the domestic market.
HIGHLIGHTS:
•
Maximum conversion of 67.3wt% achieved for the Cannel Coal portion
of the Alpha Resource, 65.9wt% for the Torbanite portion and 66.3wt%
conversion obtained for a blended sample.
•
72% improvement achieved in the maximum conversions for Cannel
Coal from Test Program Two to Test Program Three.
•
The majority of the samples tested in Program 3 converted more than
10 wt% of the feed material to asphaltenes.
•
Test Program Four due to commence imminently, leading to the
delivery of the Pre-Feasibility Study for the Alpha Project.
Greenvale Energy Limited (ASX: GRV, “Greenvale” or “the Company”) is pleased to report
key outcomes from the third round of liquefaction test work on bulk samples from its flagship
100%-owned Alpha Torbanite Project in Queensland.
The outstanding results from Test Program Three have again exceeded the Company’s
expectations and further enhanced the potential of the Alpha deposit to produce bitumen for
the domestic market in Australia, helping to meet surging demand from the infrastructure
sector.
The completion of Test Program Three paves the way for the immediate commencement of
Test Program Four, which will in turn underpin the completion of the Alpha Project PreFeasibility Study (PFS).
During Test Program Three, a maximum conversion of 67.3wt% was achieved for the Cannel
Coal portion of the Alpha Resource, 65.9wt% conversion was achieved for the Torbanite
portion of the Resource and 66.3wt% conversion was achieved for a blended sample. These
results, when compared to the maximum conversion rates achieved in Test Programs One
REGISTERED OFFICE:
Level 5, Suite 6 189 Kent Street, Sydney, New South Wales 2000 | GPO Box 2733, Sydney NSW 2001
+61 8 6215 0372 | admin@greenvaleenergy.com.au | www.greenvaleenergy.com.au
ABN
54
000
743
555
and Two, are outstanding and have significantly enhanced the economic potential of the Alpha
Project.
For comparison, during Test Program Two a maximum conversion of 39% was achieved from
a Cannel Coal sample, and a maximum conversion of 38.3wt% from a Torbanite sample was
achieved as part of Test Program One.
This represents a 72% overall improvement in the maximum conversions for Cannel Coal
from Test Program Two to Test Program Three.
Additionally, the majority of the samples tested in Program 3 converted 10wt% of the ore to
asphaltenes and pre-asphaltenes, regardless of the specific experimental conditions.
Interestingly, the Cannel Coal samples performed similarly to the Torbanite samples,
particularly when the experimental conditions were more severe (higher temperatures).
Bituminous products typically contain 5-25% asphaltenes, with the asphaltenes blended
with heavy oil fractions in varying ratios to produce a wide variety of products.
Theoretically, the greater the amount of preserved asphaltenes, the greater the potential
output of bituminous products.
Commenting on the latest round of results, Greenvale Energy CEO, Mr Mark Turner,
said: “Once again, we have been very impressed by the exceptional outcomes of the
liquefaction test program. Seeing such a significant improvement in the maximum
conversions for both Torbanite and, unexpectedly, Cannel Coal highlights the substantial
value that has been added to the Alpha Project by investigating the liquefaction process.
“We believe that the exceptional outcomes of this liquefaction test work have more
than vindicated the decision to pursue this processing pathway for the deposit,
including the additional time that has been required to complete the Pre-Feasibility Study.
Ultimately, it puts us in a position to deliver a significantly more valuable Project for our
shareholders.
“Excitingly, the blended samples have yielded comparatively impressive conversions,
more than 65wt%. This number may seem inconsequential given the fantastic conversion
results of the Cannel Coal and Torbanite samples. However, these findings may have
significant flow-on effects in terms of mine and process planning, allowing for a potentially
simpler and less capital-intensive mining and processing pathway.
“I would like to take this opportunity to thank the University of Jordan for their diligent
and skilful work in delivering these outstanding results, their input has been greatly
appreciated. Also, once again, thank you to the team at PROCOM for their technical input.
We look forward to sharing more news over the coming weeks as we move closer to
delivering Alpha’s highly anticipated Pre-Feasibility Study.”
Greenvale’s technical consultants, PROCOM, have been integral in delivering these
outstanding results, having initiated the concept of liquefaction as a preferred method of
processing this unique deposit, designed the laboratory program, conducted the
data interpretation and drafted the technical report. The laboratory test work and
subsequent analysis work, under instruction from PROCOM, was completed by the
University of Jordan. Jordan University has skilfully conducted the lab work, and the results
are consistent with the earlier stages of the program. This consistency enhances the
credibility of the work done so far.
During Test Program Three, a total of 12 tests were conducted under differing experimental
conditions to determine the optimum process to improve the conversion of the Torbanite and
GREENVALE
ENERGY
LI M I T E D
2
Cannel Coal, focusing on maximising the heavy fractions necessary for the production of
bituminous products.
The study evaluated the performance of four samples each of Cannel Coal, Torbanite, and a
1:2 blend of the two in line with the ratio across the deposit. Outcrop samples continued to be
used in this program to build from the knowledge base. The reaction tests were conducted at
higher temperatures (370oC – 400oC) compared to Test Programs 1 and 2 (290oC - 360oC).
The results demonstrate excellent progress in converting the samples into liquids at the
optimal temperature of 400oC.
Table 1: Test Program 3 oil shale liquefaction results of conversion and yield products of oil shale samples
Oil Shale
Sample
Conversion
O+G
A+ PA
Residue
Seams
ID
(wt%)
1
(wt%)
(wt%)
(wt%)
Cannel Coal
3B1
51.95
38.71
13.24
48.05
Oil base, 0%catalyst, 400C
Torbanite
3F1
62.99
51.39
11.60
37.01
Oil base, 0%catalyst, 400C
3Blend1
66.32
53.94
12.39
33.68
Oil base, 0%catalyst, 400C
Cannel Coal
3B2
31.71
22.07
9.64
68.29
Water base, 0%catalyst,
400C
Torbanite
3F2
41.73
32.18
9.55
58.27
Water base, 0%catalyst,
400C
3Blend2
40.65
37.01
3.64
59.35
Water base, 0%catalyst,
400C
Cannel Coal
3B3
67.03
50.77
16.26
32.97
Oil base, 2%catalyst, 400C
Torbanite
3F3
65.87
52.85
13.02
34.13
Oil base, 2%catalyst, 400C
3Blend3
55.75
41.99
13.75
44.25
Oil base, 2%catalyst, 400C
Cannel Coal
3B4
38.87
28.92
9.95
61.13
Oil base, 2%catalyst, 370C
Torbanite
3F4
46.66
35.26
11.40
53.34
Oil base, 2%catalyst, 370C
3Blend4
41.09
30.64
10.45
58.91
Oil base, 2%catalyst, 370C
Blend
Blend
Blend
Blend
(O+G = Oil & Gas; A+PA = Asphaltenes & Pre-asphaltenes)
Experiment Conditions
The following summarises the key outcomes of the three test programs:
Test Program 1:
•
•
•
Torbanite 1F2 sample achieved a conversion of 38.3wt% at 345oC, starting hydrogen
pressure of 3500 kPa 2 and 2wt% catalyst. This conversion was almost twice as high as
the 20wt% conversion of the Torbanite 1F1 sample at 290oC, 1,750kPa starting
hydrogen pressure and 1.5wt% catalyst.
Cannel Coal 1B1 sample achieved 24.9wt% conversion at 340oC, 3,500 kPa initial
pressure and 1.5wt% catalyst.
Blend samples achieved conversions of 15.9wt% – 19.7wt%, with temperatures of
350oC and 340oC, respectively, and an initial pressure of 3,500kPa.
All weight percentages relate to the as received samples
The system pressure rises to almost 11,500 kPa from the initial pressure due to the rise in temperature and
the vapour pressure of the compounds present
1
2
3
GREENVALE
ENERGY
LIMITED
Test Program 2:
•
•
•
Cannel Coal 2B1 sample achieved 32.7wt% conversion at 365oC, 3,500kPa and 3.4wt%
catalyst.
Cannel Coal 2B2 sample achieved 33.1wt% conversion at 365oC, 3,500 kPa and
2.5wt% of catalyst.
Cannel Coal 2B3 sample achieved 39.0wt% conversion at 365oC, 3,500 kPa and
6.1wt% of catalyst.
Test Program 3:
•
•
•
•
Cannel Coal 3B1 sample of 52wt% conversion, Torbanite 3F1 sample of 63wt%
conversion and Blend 3Blend1 sample of 66.3wt% conversion at 400oC, in a carrier oil
and without catalyst.
Cannel Coal 3B2 sample of 31.7wt% conversion, Torbanite 3F2 sample of 41.73wt%
conversion and Blend 3Blend2 sample 40.7wt% conversion at 400oC, without catalyst
and water carrier.
Cannel Coal 3B3 sample of 67wt% conversion, Torbanite 3F3 sample of 65.9wt%
conversion and Blend 3Blend3 sample 55.8wt% conversion at 400oC, 2wt% catalyst and
oil as the carrier.
Cannel Coal 3B4 sample of 38.87% conversion, Torbanite 3F4 sample of 46.66%
conversion and Blend 3Blend4 sample 41.1wt% conversion at 370oC, 2wt% catalyst and
oil as the carrier.
Figure 1: A comparison of the maximum conversions achieved for cannel coal samples across the three
liquefaction test programs
TEST PROCEDURES
In the previous Test Programs One and Two, reactions were conducted in a 7-litre Parr
Reactor with a carrier oil volume ranging from 2 to 4 litres and shale weighing between 300
and 700 grams.
In the current Test Program 3, the liquefaction reactions were carried out in a 0.1-litre stirred
autoclave reactor. In a typical experiment, designated powdered shale ore samples, with or
without the iron-based catalyst, were mixed with the carrier, oil or water and then charged into
the reactor. After loading, the reactor was first purged to replace air using nitrogen followed
GREENVALE
ENERGY
LIMITED
4
by hydrogen and then pressurised with hydrogen to the required pressure at room
temperature.
The charged autoclave reactor was heated to the desired temperature. Pressure in the reactor
rose with temperature. Once the target temperature was reached, the temperature was held
for 30 minutes before cooling commenced. At the end of each run, the reactor rig was cooled
to room temperature, and the samples were collected for subsequent laboratory tests.
No gas samples were taken under this testing program. A negligible amount of gas evolution
was detected from Test Programs 1 and 2, and the gas analyses did not vary substantially.
Results from this program also indicated little gas make and overall mass balance closure
better than +/- 2%.
Further testing of the off-gas will be conducted in the yield tests conducted on the core samples
(Test Program Four). For each experiment, the potential gas yield is estimated by the weight
loss of the reactor and contents before and after the reactions at room temperature and
pressure.
Table 2: Summary of the experiment tests and conditions
Samples
Solid
Catalyst/Shale
Carrier
Temperature
ID
(g)
wt%
Type
o
C
Pressure
Initial
(MPa)
Max
After
(MPa)
(MPa)
Cannel Coal (3B1)
10
0
Oil Base (30g)
400
7.74
16.9
6.71
Torbanite (3F1)
10
0
Oil Base (30g)
400
8.1
16.35
6.50
Blend (3Blend1)
10
0
Oil Base (30g)
400
7.11
16.97
6.00
Cannel Coal (3B2)
10
0
Water Base
(30g)
400
0.50
24.00
0.48
Torbanite (3F2)
10
0
Water Base
(30g)
400
1.01
25.90
0.99
Blend (3Blend2)
10
0
Water Base
(30g)
400
0.97
25.41
0.95
Cannel Coal (3B3)
10
2
Oil Base (30g)
400
8.66
17.75
5.7
Torbanite (3F3)
10
2
Oil Base (30g)
400
8.91
18.07
8.46
Blend (3Blend3)
10
2
Oil Base (30g)
400
8.97
17.96
7.97
Cannel Coal (3B4)
10
2
Oil Base (30g)
370
10.29
18.66
9.28
Torbanite (3F4)
10
2
Oil Base (30g)
370
9.35
16.57
8.16
Blend (3Blend4)
10
2
Oil Base (30g)
370
9.4
17.84
8.37
NEXT STEPS
Overall, the liquefaction program has been extremely encouraging. The dataset from Test
Programs One, Two and Three will prove invaluable in evaluating the Alpha Resource for the
Pre-Feasibility Study. With the initial success of Programs One and Two, and encouraging
improvements from Test Program Three, attention now shifts to Test Program Four.
As part of the upcoming testing program, the reported conversion under Test Program Three
will be experimentally improved, with the liquefaction tests conducted using Alpha core
GREENVALE
ENERGY
LIMITED
5
samples. The reaction tests of the core samples will be systematically investigated under
various pressure, temperature, reaction time and catalyst concentration, in line with the
findings from Test Program Three. The analyses of the liquefied products will be interpreted
and reported to the market in due course. Early indications show that the oil produced is
substantially heavier than the carrier oil with an added 20wt% of the combined carrier oil and
new oil compared to the carrier oil feed, boiling over diesel end point of 343C. The Asphaltene
and Pre-Asphaltene liquids were analysed separately.
Test Program Four will be designed to improve on the conversions demonstrated in Program
Three, emphasising heavy oil and asphaltenes yield enhancement. Greenvale’s technical
team is confident that there is still scope for improvement.
PROCOM has designed the Scope of Work (SOP) that describes the experimental program
and instructions for the upcoming Test Program Four.
In addition, the core samples have also been prepared by the PROCOM team and are readily
available to initiate the liquefaction experiments.
Once Test Program Four has commenced, Greenvale expects to be in a better position to
determine the final delivery date of the Pre-Feasibility Study.
The significant improvements in conversions throughout the liquefaction program have
impacted multiple aspects of the PFS delivery. The continuous improvements and changes to
conversion conditions have resulted in significant changes to everything from mine planning
to process and plant design.
AUTHORISED FOR RELEASE:
The Board of Greenvale has approved this announcement for release.
FOR FURTHER DETAILS, CONTACT:
Mark Turner, CEO, 0459 519 999
MEDIA INQUIRIES:
Nicholas Read
Read Corporate
Nicholas@readcorporate.com.au
Mobile: 0419 929 046
COMPETENT PERSON’S STATEMENT:
The information in this report that relates to Metallurgical Results is based on information
compiled by David Cavanagh, a Competent Person who is a Member of The Australasian
Institute of Mining and Metallurgy AusIMM Member number 112318 David Cavanagh is a fulltime employee of Core Resources.
David Cavanagh has sufficient experience that is relevant to the style of mineralisation and
type of deposit under consideration and to the activity being undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’.
David Cavanagh consents to the inclusion in the report of the matters based on his information
in the form and context in which it appears.
GREENVALE
ENERGY
LIMITED
6
J ORC Co d e, 2012 E dit io n – T ab le 1 Rep o r t
S e c t i o n 1 S a m p l in g T e c hni q u e s a nd D a t a
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such as
down hole gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the broad
meaning of sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are Material
to the Public Report.
• In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is coarse
gold that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
• Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of diamond tails, facesampling bit or other type, whether core is oriented and if so, by
what method, etc).
• An outcrop sample has been collected using basic channel
sample protocols.
• An electric jackhammer was required to cut a vertical section
(approximately 30cm x 30cm) with samples typically being
taken in 30cm to 60cm intervals and interval boundaries being
defined by a visual change in material type or the presence of
bedding.
• All reasonable attempts were made to sample a uniform
vertical cross section.
• The purpose of the outcrop sampling has been to provide
sufficient material for sighter testing only.
Drilling
techniques
• Not applicable to the outcrop sampling.
7
Drill sample
recovery
Logging
Subsampling
techniques
and sample
preparation
• Method of recording and assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
• Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections
logged.
• Not applicable to the outcrop sampling.
• If core, whether cut or sawn and whether quarter, half or all
core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of
the sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages
to maximise representivity of samples.
• Measures taken to ensure that the sampling is representative
of the in situ material collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the
material being sampled.
• The bulk sample was taken in substantial quantities of over 50
kilograms and of both torbanite and cannel coal portions of the
subcrop. Samples were held by Stratum and Subsampling for
this exercise was undertaken by Stratum Laboratories.
• Splits of approximately 400 grams were cut from subsamples
obtained from Stratum splits of the subcrop samples. Smaller
samples were used in the program to facilitate subsequent
processing in the laboratory.
• The splits were pulverised to sub 200 microns
undertaken immediately prior to the tests being
conducted.
• Subsamples were cut and placed under nitrogen and
forwarded to Jordan for the test program at the
University of Jordan
• Detailed logging was not undertaken at the outcrop sample
location as it was not possible to expose the full horizon.
• The outcrop sampling of material has only been used for sighter
testing with all Mineral Resource estimation, mining, and
metallurgical studies to be developed based evaluation of the
core sample material.
• Photographic records have been taken which shows each
horizon sampled and the weight of samples taken from each
sample location has been recorded.
8
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision
have been established.
Verification
of sampling
and
assaying
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Accuracy and quality of surveys used to locate drill holes (collar
and down-hole surveys), trenches, mine workings and other
locations used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
Location of
data points
Data
spacing and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• The subsamples had been held in refrigeration below zero in
sealed bags.
• Post pulverisation the samples held under nitrogen overpressure
until used.
• A range of tests were conducted on the carrier oil and the
sample types to ensure the program could be meaningfully
executed. Subsequent tests were then undertaken to a
standard set of procedures. In all 19 tests were conducted to
establish the set of 12 test result sets.
• Laboratory tests were conducted based on standard analytical
techniques such as TGA, Proximate and Ultimate.
• Outcrop sample has been observed by multiple personnel
including Engineers, Geologists and Greenvale employees have
been involved in the sample acquisition.
• The sample was taken from a subcrop of Torbanite and Cannel
coal in a tributary known as ‘Mine Gully’. Although yet to be
formally surveyed, the approximate location of 483520 E and
7333321 N in Coordinate system MGA55 GDA94 datum is
expected to be accurate to +/- 30m
• Not relevant to the outcrop sample and retort test work.
9
Orientation
of data in
relation to
geological
structure
Sample
security
Audits or
reviews
• Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and
reported if material.
• The measures taken to ensure sample security.
• Not relevant to the outcrop sample and retort test work.
• The results of any audits or reviews of sampling techniques
and data.
• No audits have been undertaken.
• Samples have been stored in dedicated freezers from the time
the sample was acquired.
10
S e c t i o n 2 R e p o r t in g o f E x p lo r a t i o n R e su lt s
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code Explanation
Commentary
Mineral
tenement
and land
tenure
status
• Type, reference name/number, location and ownership
including agreements or material issues with third parties such
as joint ventures, partnerships, overriding royalties, native title
interests, historical sites, wilderness or national park and
environmental settings.
• The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to operate
in the area.
• Acknowledgment and appraisal of exploration by other parties.
• Mineral Development Lease (MDL) 330 was granted to Alpha
Resources Pty Ltd on the 27th of August 2007 and an extension of
a further five years has now been granted ending 31/01/2027.
• MDL 330 covers an area of 1,904.5 ha.
Exploration
done by
other parties
• Refer to Table 1 below which shows there has been appraisal and
evaluation undertaken since 1939.
• Held by Alpha Resources Pty Limited since 2002.
11
Geology
• Deposit type, geological setting, and style of mineralization.
• The deposit is a Torbanite and Cannel coal formation which is
formed in a sedimentary environment;
• The Alpha deposit lies within the axis of the Glen Avon Syncline,
a southwest plunging fold structure that occurs on the eastern
flank of the Galilee Basin;
• The deposit is part of the Permian Colinlea Sandstone, which
contains 150 m of cross-bedded sandstones with minor
conglomerates, siltstones and mudstones.
Drill hole
Information
• A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level
in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that
the information is not Material and this exclusion does not
detract from the understanding of the report, the Competent
Person should clearly explain why this is the case.
• Not applicable to this announcement
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations (eg
cutting of high grades) and cut-off grades are usually Material
and should be stated.
• Where aggregate intercepts incorporate short lengths of high
grade results and longer lengths of low grade results, the
procedure used for such aggregation should be stated and
some typical examples of such aggregations should be shown
in detail.
• The assumptions used for any reporting of metal equivalent
values should be clearly stated.
• Not applicable as reporting outcrop sampling only.
12
Relationship
between
mineralisatio
n widths and
intercept
lengths
Diagrams
Balanced
reporting
Other
substantive
exploration
data
• These relationships are particularly important in the reporting of
Exploration Results.
• If the geometry of the mineralisation with respect to the drill
hole angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (eg ‘down hole
length, true width not known’).
• Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery
being reported These should include, but not be limited to a
plan view of drill hole collar locations and appropriate sectional
views.
• Where comprehensive reporting of all Exploration Results is
not practicable, representative reporting of both low and high
grades and/or widths should be practiced to avoid misleading
reporting of Exploration Results.
• Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations;
geophysical survey results; geochemical survey results; bulk
samples – size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
• Not applicable as reporting outcrop sampling only.
• Not applicable as reporting outcrop sampling only.
• Not applicable as reporting outcrop sampling only.
• Comprehensive reporting of drilling results will be reported
separately in future.
• Supported by a base lube oil free or additives and then jointly
subjected to pressure and one temperature under a hydrogen
atmosphere with varying amounts of an industry standard
catalyst. The program focussed on three subsamples
of cannel coal. The same procedure was applied.
• The results showed that the cannel coal sample weight loss
continues to increase at progressively higher temperatures,
365C, compared with the first test campaign at 348C and with a
different catalyst at increasing catalyst concentration.
• Cannel coal weight loss increased from about 22% (increased
from 19% without toluene wash) to about 39% on the basis of
tests including an additional wash of the resultant solids in
toluene to remove adhered asphaltenes.
• Weight loss due to gas evolution remains low.
• The results focused on achieving higher reactor temperatures using
the outcrop samples as in previous programs.
• The results for Cannel Coal and Torbanite and respective blends
demonstrate a continued improvement at higher temperature such
that the conversions rates of 52%, 63, and 67wt% respectively with
13
no added catalyst on an as received basis, which converted to 67%,
66% and 56wt% on the addition of 2wt% catalyst all at 400oC.
• All tests showed conversion to Asphaltenes and Pre-Asphaltenes of
over 10 wt%.
• TGA tests have been conducted on the resultant solids post reaction
and solvent extraction. Some hydrocarbon volatiles remain and so
future programs will investigate this further.
Further work
• The nature and scale of planned further work (eg tests for
lateral extensions or depth extensions or large-scale step-out
drilling).
• Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling
areas, provided this information is not commercially sensitive.
• The successful test program at the U
Share your feedback
Discover