Alpha TP7 Milestone 3 production - updated
Released
Released
Announcement PDF
ASX Release 6 March 2026
Interactive Investor Hub - Engage directly with the Company through our Investor hub, you can ask questions, review
comments and get direct access to the Company – follow the link greenvaleenergy.com.au/announcements
Greenvale Energy Limited ABN 54000743555 W: greenvaleenergy.com E: admin@greenvaleenergy.com.au
Perth: Level 1, 1 Alvan St, Subiaco, 6008 Brisbane: Suite 5-Level 12, 10 Market St, Brisbane 4000 Page | 1
TEST PROGRAM 7 - MILESTONE 3 SAMPLE PRODUCTION -
UPDATED
Greenvale Energy Limited ASX: GRV (“Greenvale” or “the Company”) refers to its ASX
Announcement lodged on 23 February 2026, “Alpha TP7 Milestone 3 production update” and
wishes to provide further disclosure on the JORC Table and Competent Person Statement in
relation to this release. The original release did not include this information.
This announcement has been approved for release by the Board of Directors.
Your faithfully
Peter Harding-Smith
Company Secretary
ASX Release 6 March 2026
Interactive Investor Hub - Engage directly with the Company through our Investor hub, you can ask questions, review
comments and get direct access to the Company – follow the link greenvaleenergy.com.au/announcements
Greenvale Energy Limited ABN 54000743555 W: greenvaleenergy.com E: admin@greenvaleenergy.com.au
Perth: Level 1, 1 Alvan St, Subiaco, 6008 Brisbane: Suite 5-Level 12, 10 Market St, Brisbane 4000 Page | 1
TEST PROGRAM 7 - MILESTONE 3 SAMPLE PRODUCTION
UPDATED
Greenvale Energy Limited ASX: GRV (“Greenvale” or “the Company”) is pleased to provide an
update on the current phase of work for the Alpha Project, Test Program 7 (TP7). TP7 continues
with bulk sample production for the purpose of independent product certification.
Greenvale CEO Alex Cheeseman said:
“Milestone 3 is advancing as planned, with six bulk pressure leach runs completed so far and
three remaining under the current contract scope. This phase of work has always been about
deriving a bulk sample to allow further refinement and ultimately certification, we may choose to
extend the production phase if needed, those discussions have commenced.
Highlights
▪ Test program 7 (TP7), Milestone 3 - the production of bulk sample
continues to progress as planned, with six of nine contracted production
runs completed.
▪ Monash University processing team have completed one production run
a week, and will continue through to the first week of March 2026. The
Company and Monash are initiating discussions to extend the bulk
sample production phase if needed.
▪ Weekly process reviews have identified optimisation opportunities in the
initial test runs, leading to changes to mechanical equipment, peak
temperature and reaction retention times. Current production runs are
achieving consistent results with ~99wt% conversion of torbanite,
resulting in an average 32wt% of toluene soluble yield as the primary
pressure leach intermediate product.
▪ Initial samples have been sent to Technix for product characterisation and
preliminary testing for the next phase of processing and product
certification.
▪ TP7 has a single aim of producing a bituminous product that can be
independently certified to C-170 specification.
Greenvale Energy Limited ASX Release
Page | 2
“As part of the downstream process development, Greenvale will engage Technix to implement
their own proprietary process to the product derived by Monash University, we are getting this
work started early with an initial sample dispatched, we are pleased to be initiating this
concurrent phase of work.”
Bulk Leach Production Runs
TP7 bulk leach runs have utilised drill core GM12C1
from the LT seam of the Alpha Project. The
core sample is pulverised and sieved to a P80 of 200 µm, with oversize material removed to
ensure particle size consistency. A homogeneous sample blend was prepared and used across
all bulk production runs to maintain repeatability and feed product consistency.
Each production run employs a charge of approximately 400 g (dry basis) of GM12C material,
together with ~10 g (dry basis) of Zinc Acetate (Zn(AcO)₂) as catalyst and ~1,200 grams of toluene
as solvent. The system is pressurised with hydrogen to 90 bar (cold), and the reaction conducted
in the leach reactor under controlled operating conditions. An induction heating system is used
to achieve the desired temperature ramp rate.
For initial production runs, a retention time of 60 minutes at target conditions was maintained.
These runs achieved consistent temperature and pressure profiles, with a reaction temperature
of approximately 400 °C and a reaction pressure of approximately 26 MPa. These operating
parameters were aligned with those established during TP7 Milestone 2 and previous Test
Program 6 (TP6) work program.
Temperature and pressure profiles for the first four production runs can be seen in Figures 1 and
2.
Figure 1 – Temperature ramp profile and 1 hour of retention time at target rates (first four
production runs)
1 Refer to ASX Announcement Key milestone achieved with Alpha Project TP7 – bulk sample production to commence released
16 December 2025.
Greenvale Energy Limited ASX Release
Page | 3
Figure 2 – Pressure ramp profile and 1 hour of retention time at target rates (first four
production runs)
Test Program 7 – Scaling and Optimisation
As previously announced2
key findings from Greenvale’s previous test programs had determined
the optimal process controls to maximise product yields from Alpha’s torbanite. Specific
controls include temperature ramp profile, reaction pressure, temperature cooling profile,
optimal catalysts and optimal carriers.
TP7 was design to repeat the performance of TP6 but at a significantly increased operating scale
(from 100ml reactor to 4l reactor) in order to both demonstrate scalability and also efficiently
derive a bulk sample. This scale increase required custom designed and procured equipment
and the validation of TP6 operating parameters. TP6 optimal conditions were met in TP7
Milestone 2, and production of bulk sample began in December 20253
.
Weekly process reviews between the Company and Monash University identified potential
optimisation opportunities. For the most recent production runs (runs five and six), the system
was pressured with hydrogen at 94 bar (cold) with an increase of 4 bar compared to runs one to
four, and also saw a reduced retention time from 60 mins to 30 mins. Under these conditions an
overall recovery of 99 wt% with a gas yield of approximately 1.5 wt% at dry basis has been
achieved. The retention time reduction by a material factor of 50% is a significant gain for the
project as it has immediate impacts on the ability to reduce the size of a pressure leach reactor
at pilot/commercial scale – assessed at this stage as delivering a potential CAPEX and OPEX cost
saving.
Further optimisation opportunities identified included the need for a change in impeller design in
the reactor to improve mixing consistency during the pressure leach process. A new impeller was
designed, manufactured and installed into the Monash reactor and has been utilised from
production run four onwards. An immediate improvement was observed with reduced solid
residue in the reactor - the improved flow dynamics of the material giving confidence that the
hydrometallurgical process will continue to scale up.
2
Refer to ASX Announcement TP6 delivers positive results with highest product conversion to date and the introduction of catalysts
improving viscosity of the final product released 8 April 2025.
3
Refer to ASX Announcement Key milestone achieved with Alpha Project TP7 – bulk sample production to commence released
16 December 2025.
Greenvale Energy Limited ASX Release
Page | 4
The net result of optimisation efforts are currently yielding high overall recovery (~99 wt%) with a
32% yield in primary product. The remaining test runs will replicate the optimised processing
parameters to maximise the bulk sample production yield and thoroughly validate the operating
parameters. The processing yields and recovery for each run can be seen in table 1
Figure 3 – Upgraded Reactor Impeller design to achieve mixing consistency
Table 1 – Bulk sample production - process conditions and yields
Production
Run
Sample Catalyst Solvent
Peak
Temperature
(o
C)
Retention
Time
(hours)
Conversion
yield (Wt%)
Toluene
Soluble yield
(Wt%)
Toluene
Insoluble
yield (Wt%)
1
GM12C Zn(CH3COO)2 Toluene
400 1 99.5 40.7 57.8
2 400 1 97.2 28.2 67.2
3 400 1 98.2 27.3 72.7
4 400 1 95 27.6 72.4
5 410 0.5 99 32 65
6 410 0.5 99 32 65
Notes:
Conversion yield includes gas produced during reaction
Production run 1 derived much higher yields and a different product characteristic and has been deemed an outlier and not
representative.
Technix Preliminary Assessment
Technix of New Zealand have been engaged to conduct a preliminary assessment of the material
produced thus far. A sample of approximately 210ml has been dispatched to Technix to allow for
preliminary characterisation and assessment of further beneficiation requirements to derive a
final product.
Future Work
Following the successful optimisation of bulk pressure leach conditions in production runs five
and six, TP7 will continue to replicate the optimal conditions for the remaining production runs
(seven, eight and nine). Consideration of additional production runs is being discussed and will
be guided by preliminary assessment work to be undertaken by Technix.
The Company expects Technix preliminary assessment to occur over the next three weeks with
a decision to be made on next steps in mid-March.
Greenvale Energy Limited ASX Release
Page | 5
Authorised for release
This announcement has been approved for release by the Board of Directors.
For further information please contact
Alex Cheeseman Nicholas Read
CEO Read Corporate
E: admin@greenvaleenergy.com.au E: nicholas@readcorporate.com.au
M: +61(0)419 929 046
About Greenvale Energy Limited
Greenvale is an ASX-listed exploration company, committed to building a portfolio of Uranium Resources
in Tier-1 mining jurisdictions. The Company is building a large land holding in the world-class Pine Creek
region of the Northern Territory, and also owns the advanced, high-grade Oasis Uranium Project in
Queensland. The Company has additional new-energy/forward facing projects all aligned with the global
need for reliable, sustainable, low-emissions energy and supply chains. The Company believes the best
way to create long-term shareholder value is by investing in exploration, to make discoveries and grow its
resource-base.
Competent Person Statement
The information in this announcement, as it relates to exploration results, interpretations and conclusions,
is based on information reviewed by Mr Mark Biggs, who is an independent technical adviser to Greenvale
Energy Ltd and is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM, #10788). Mr
Biggs is a Director of ROM Resources Consultant to the Company, and has sufficient experience that is
relevant to the style of mineralisation and type of deposit under consideration, and to the overseeing of
activities being undertaken to qualify as a Competent Person (as defined in the JORC 2012 edition of the
“Australasian Code for Reporting of Mineral Resources and Ore Reserves”. Mt Biggs consents to the
inclusion of this information in the form and context in which it appears.
Forward Looking Statements
This announcement may contain certain forward-looking statements and projections. Such forward
looking statements/projections are estimates for discussion purposes only and should not be relied upon.
Forward looking statements/projections are inherently uncertain and may therefore differ materially from
results ultimately achieved. The Company does not make any representations and provides no warranties
concerning the accuracy of the projections and disclaims any obligation to update or revise any forward-
looking statements/projects based on new information, future events or otherwise except to the extent
required by applicable laws.While the information contained in this report has been prepared in good faith,
neither the Company nor any of its directors, officers, agents, employees or advisors give any
representation or warranty, express or implied, as to the fairness, accuracy, completeness or correctness
of the information, opinions and conclusions contained in this announcement.
Greenvale Energy Limited ASX Release
Page | 6
Appendix 1 – Sample Details
Table A1-1, below, lists the origin data for the test sample.
Table A1-1: Borehole Data Details for Composite Test Sample
Hole ID Sample ID Easting Northing RL
Total
Depth
(m)
Azimuth (°)
Inclination
(°)
Depth
From
(m)
Depth
To (m)
Interval
(cm)
Seam
GM11C GM11C3 481332 7333200 447 45 0 -90 37.53 37.73 20 LT
GM12C
GM12C5 +
C6
481867 7333226 440 33 0 -90
22.09 22.75 66
LT/L2
GM12C 25.07 25.30 23
GM13C GM13C5 482325 7333171 445 25 0 -90 17.47 17.74 27 LT
GM57C GM57C3 482346 7332917 443 37.7 0 -90 24.72 25.22 50 LT
GM72C GM72C3
483103 7331906 446 42.7 0 -90
36.00 36.08 8 LT
GM72C GM72C4 36.08 36.21 13 LT
GM73C GM73C3
483605 7331921 461 49.05 0 -90
39.40 39.60 20 LT
GM73C GM73C4 39.60 39.75 15 LT
GM78C GM78C3 482041 7333418 445 27 0 -90 18.37 18.71 34 LT
GM80C GM80C4
482545 7333400 452 25 0 -90
16.43 16.49 6 LT
GM80C GM80C5 16.49 16.93 44 LT
GM81C GM81C3 482840 7333389 465 37 0 -90 26.92 27.56 64 LT
Total 390
Note: all coordinates are provided in GDA2020, zone 55
Greenvale Energy Limited ASX Release
Page | 7
Appendix 2 - JORC Code, 2012 Edition – Table 1 Report
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples
should not be taken as limiting the broad meaning of
sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been done
this would be relatively simple (e.g. ‘reverse circulation
drilling was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fire assay’).
In other cases, more explanation may be required, such
aswherethere is coarse goldthat has inherent sampling
problems. Unusual commodities or mineralisation
types (e.g. submarine nodules) may warrant disclosure
of detailed information.
Samples for metallurgical testing (Test Program 7) were
selected from 2023 exploration drilling, specifically HQ
core as outlined in Appendix 1 (Table A1-1).
Details of the drilling program been provided in previous
ASX releases in October 2023 and May 2025.
Standard drilling and core techniques were employed in
generally shallow holes drilled vertically.
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (e.g. core diameter, triple or standard tube,
depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
Standard RAB and diamond HQ coring rigs were utilised.
Drill sample
recovery
• Method of recording and assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximise sample recovery and
ensure representative nature of the samples.
• Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
All core selected from testing was from boreholes with
core recovery >90%.
Logging • Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining
studies and metallurgical studies.
• Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
• The total length and percentage of the relevant
intersections logged.
Detailed logging was not undertaken at the site but later
after sample delivery to the lab. Logging was to the Coal
Log V2 standard.
Whereas previously outcrop sampling of material has
only been used for sighter testing; with all Mineral
Resource estimation, mining, and metallurgical studies
to be developed based evaluation of the core sample
material.
Photographic records have been taken which shows
each horizon sampled and the weight of samples taken
from each sample location has been recorded.
Sub-sampling
techniques and
sample
preparation
• If core, whether cut or sawn and whether quarter, half or
all core taken.
• If non-core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
The bulk sample was taken in substantial quantities of
about 20 kilograms and of both torbanite and cannel
coal portions of the 63mm core. Samples were held by
Stratum and Subsampling for this exercise was
undertaken by Stratum Laboratories.
Splits of approximately 400 grams were cut from
Greenvale Energy Limited ASX Release
Page | 8
Criteria JORC Code explanation Commentary
• Quality control procedures adopted for all sub-
sampling stages to maximise representivity of samples.
• Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size
of the material being sampled.
subsamples obtained from Stratum splits of the subcrop
samples. Smaller samples were used in the program to
facilitate subsequent processing in the laboratory.
The splits were pulverised to sub 200 microns
undertaken immediately prior to the tests being
conducted.
Subsamples were cut and placed under nitrogen and
forwarded to Melbourne for the test program at the
Melbourne University.
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (i.e.
lack of bias) and precision have been established.
The subsamples had been held in refrigeration below
zero in sealed bags.
Post pulverization the samples held under nitrogen
overpressure until used.
A range of tests were conducted on the carrier oil and the
sample types to ensure the program could be
meaningfully executed. Subsequent tests were then
undertaken to a standard set of procedures. In all 19
tests were conducted to establish the set of 12 test
result sets.
Laboratory tests were conducted based on standard
analytical techniques such as TGA, Proximate and
Ultimate.
Verification of
sampling and
assaying
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
• Discuss any adjustment to assay data.
The samples derived from the core have been observed
by multiple personnel including Engineers, Geologists
and Greenvale employees have been involved in the
sample acquisition.
Location of data
points
• Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches, mine
workings and other locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
The samples taken are described in Table A1-1 in
Appendix 1. Coordinate system MGA55 GDA94 datum is
expected to be accurate to +/- 30m.
Data spacing
and distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient
to establish the degree of geological and grade
continuity appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and classifications
applied.
• Whether sample compositing has been applied.
Not relevant for this discussion of metallurgical testing.
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
this is known, considering the deposit type.
• If the relationship between the drilling orientation and
the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
Not relevant for this discussion of metallurgical testing.
The deposit strikes at 300 degrees with gentle dips to the
south and southwest. The intersecting boreholes were
planned as vertical.
Sample security • The measures taken to ensure sample security. Sampleshavebeenstoredindedicatedfreezers fromthe
time the sample was acquired and after sample
Greenvale Energy Limited ASX Release
Page | 9
Criteria JORC Code explanation Commentary
preparation.
Chain of custody was managed by ALS.
Samples have been transported in sealed bags, from
ALS Brisbane to Monash University in Melbourne.
Audits or
reviews
• The results of any audits or reviews of sampling
techniques and data.
No audits or reviews have been conducted.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and ownership
including agreements or material issues with third
parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
• The security of the tenure held at the time of reporting
along with any known impediments to obtaining a
licence to operate in the area.
MDL 330 is held by Alpha Resources Pty Ltd, a subsidiary
of Greenvale Energy Limited. MDL 330 was first granted
on 1 February 2002. An application for a renewal for an
additional 5-year term was submitted in July 2021 and
approved in July 2022.
The current 5-year term expires on 31 January 2027.
MDL 330 covers an area of 1,904.5 Ha.
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by other
parties.
Historically there has been exploration carried out over
85 years since the 1940’s. The various titles have been
held by Alpha Resources since 2002.
Table A2-1 lists the various explorers:
Geology • Deposit type, geological setting and style of
mineralisation.
The Alpha deposit lies within the axis of the Glen Avon
Syncline, a southwest plunging fold structure that
occurs on the eastern flank of the Galilee Basin.
The deposit is part of the Permian Colinlea Sandstone,
which contains 150 m of cross-bedded sandstones with
minor conglomerate, siltstones, and mudstones.
The Geology of the deposit consists of an Upper and
Lowerseamof cannel witha torbanite lenspresent in the
Lower seam.
The Colinlea Sandstone is thought to be a lower delta
plain deposit with the coal deposited in swamps and
shallow lakes in this near shore environment. The
torbanite is thought to have been deposited from algae
in a lacustrine environment when water entering the
system held little sediment or organic material.
Greenvale Energy Limited ASX Release
Page | 10
Criteria JORC Code explanation Commentary
Drill hole
Information
• A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material
drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above
sea level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the
basis that the information is not Material and this
exclusion does not detract from the understanding of
the report, the Competent Person should clearlyexplain
why this is the case.
See Table A1-1 in Appendix 1, which includes all relevant
new drill hole information and seam intercepts.
All Greenvale and IMC exploration holes have been
either traditional theodolite or DGPS surveyed with
stated accuracies of 0.1m in X & Y and 0.2m in Z.
Top of coal depths are accurate to 0.1m and interpreted
from chip logs / core logging and downhole geophysics,
where carried out.
Where available verticality was loaded, and the holes
were modelled accounting for any inclination. An
alternative model was generated treating all holes as
vertical.
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade
truncations (e.g. cutting of high grades) and cut-off
grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of
high-grade results and longer lengths of low-grade
results, the procedure used for such aggregation should
be stated and some typical examples of such
aggregations should be shown in detail.
• The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Torbanite and cannel coal horizons were modelled
separately and not aggregated.
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important in the
reporting of Exploration Results.
• If the geometry of the mineralisation with respect to the
drill hole angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are
reported, there should be a clear statement to this
effect (e.g. ‘down hole length, true width not known’).
All drill holes were drilled at 90° to the surface and
although some verticality logs are available, the deposit
was modelled where holes are assumed to be vertical.
Downhole verticality survey is available for all drill
holes.
Seam intercepts are recorded on a downhole basis.
Downhole geophysical logs were used to confirm the
seam intercepts and thicknesses.
As the deposit is gently dipping and drill holes are
generally shallow, the downhole seam thickness will
approximate the true thickness of the coal.
Diagrams • Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should
include but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
All appropriate diagrams have been released in
preceding ASX Releases in March 2023 and May 2025
Balanced
reporting
• Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration
Results.
All available data for the Torbanite area has been
collated and reported.
This release contains all relevant information.
Other
substantive
exploration data
• Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
GEOLOGY
The updated interpretation is predominantly based on
the 2023 and 2021 drilling results.
Limited historical drill hole information was used to
supplement the 2021 and 2023 drilling and support the
continuity of the Upper and Lower seams outside the
Greenvale Energy Limited ASX Release
Page | 11
Criteria JORC Code explanation Commentary
substances. bounds of the MDL area.
METALLURGY
Supported by a base lube oil free or additives and then
jointly subjected to pressure and one temperature under
a hydrogen atmosphere with varying amounts of an
industry standard catalyst. The program focussed on
three sub-samples of cannel coal. The same procedure
was applied.
The results showed that the cannel coal sample weight
loss continues to increase at progressively higher
temperatures, 365C, compared with the first test
campaign at 348C and with a different catalyst at
increasing catalyst concentration.
Cannel coal weight loss increased from about 22%
(increased from 19% without toluene wash) to about
39% based on tests including an additional wash of the
resultant solids in toluene to remove adhered
asphaltenes.
Weight loss due to gas evolution remains low.
The results focused on achieving higher reactor
temperatures using the outcrop samples as in previous
programs.
The resultsfor Cannel Coal and Torbaniteand respective
blends demonstrate a continued improvement at higher
temperature such that the conversions rates of 52%, 63,
and 67wt% respectively with no added catalyst on an as
receivedbasis, which convertedto 67%,66% and 56wt%
on the addition of 2wt% catalyst all at 400oC.
All tests showed conversion to Asphaltenes and Pre-
Asphaltenes of over 10 wt%.
TGA tests have been conducted on the resultant solids
post reaction and solvent extraction. Some
hydrocarbon volatiles remain, and so future programs
will investigate this further.
Further work • The nature and scale of planned further work (e.g. tests
for lateral extensions or depth extensions or large-scale
step-out drilling).
• Diagrams cle
Share your feedback
Discover