Investor Presentation
Released
Released
Announcement PDF
15 September 2023
CEO TO PARTICIPATE AT THE SINGAPORE MINING DAY
CONFERENCE HOSTED BY SPARK PLUS
Greenvale Energy Ltd (“Greenvale”, the “Company” or ASX: “GRV”) is pleased to announce
that Chief Executive Officer, Mark Turner will be presenting at the Spark Plus Singapore
Mining Day Conference today.
Mr Turner will present on the Company’s two key projects – being the Alpha Torbanite
Project and the Geothermal Project.
Details of the event are as follows:
•
•
•
Date:
Location :
Timeslot :
15 September 2023
10 Bayfront Avenue, Singapore (Sands Expo & Convention Centre)
3:35 pm – 3:55 pm SST, or 5:35 pm – 5:55 pm AEST
A copy of the presentation to be delivered by Mr Turner is attached.
AUTHORISED FOR RELEASE:
This announcement has been approved for release by the Board of Greenvale.
FOR FURTHER DETAILS, CONTACT:
Mark Turner, CEO, 0459 519 999
MEDIA INQUIRIES:
Nicholas Read
Read Corporate
Nicholas@readcorporate.com.au
Mobile: 0419 929 046
REGISTERED OFFICE:
Level 5, Suite 6 189 Kent Street, Sydney, New South Wales 2000 | GPO Box 2733, Sydney NSW 2001
+61 8 6215 0372 | admin@greenvaleenergy.com.au | www.greenvaleenergy.com.au
ABN
54
000
743
555
DRIVING CHANGE
A dynamic fusion of bitumen and geothermal energy to help meet Australia’s infrastructure needs
Important Information
DISCLAIMER
This document and all other information (whether in writing or otherwise) which may be made available, or part thereof does not:
Contain all information that investors and their professional advisers would require to make an informed assessment of the
following:
a)
assets and liabilities, financial position and performance, profits and losses and prospects of the Company; and
b)
rights and liabilities attaching to the Company's securities.
Constitute, or form part of, any offer to sell or issue, or any solicitation of an offer to purchase or subscribe for any securities nor
shall this document, or any part of it, or the fact of its distribution or transmission, form the basis of, or be relied on, in connection
with any contract.
Constitute a promise or representation as to the future. Recipients must make their own investigations and inquiries regarding all
assumptions, risks, uncertainties and contingencies that may affect the future operations of the Company or the Company's
securities.
No representation or warranty, express or implied, is made or given by or on behalf of the Company, its directors and officers or any
other person as to the accuracy, completeness or fairness of the information or opinions contained in this document and all other
information (whether in writing or otherwise) which may be made available or part thereof or any further information supplied by
or on behalf of the Company or in connection with the Company and no responsibility or liability is accepted for any such
information or opinions.
All statements in this document (other than statements of historical fact) are forward looking statements that involve risks and
uncertainties. The Company can give no assurance that statements will prove accurate and results and future events could differ
materially.
The Company, its directors and officers or any other person:
Do not accept liability for any loss or damage suffered or incurred by any investor or any other person however caused (including
negligence) relating in any way to this document, including (without limitation) the information contained in it, any errors or
omissions however caused, or the investor or any other person placing any reliance on this document, its accuracy, completeness,
currency or reliability.
Do not accept any responsible to inform the recipient or any other person of any matter arising or coming to its notice which may
affect any matter referred to in this document.
To the maximum extent permitted by law, expressly disclaimed and excluded any liability of the Company, its directors and officers
or any other person to the recipient or to any other person arising out of this document.
FORWARD-LOOKING STATEMENTS
This presentation contains forward looking statements. Forward looking statements are often, but not always, identified by the use
of words such as "seek", “target”, "anticipate", “forecast”, "believe", "plan", "estimate", "expect" and "intend" and statements
that an event or result "may", "will", "should", "could" or "might" occur or be achieved and other similar expressions.
The forward-looking statements in this presentation are based on current expectations, estimates, forecasts and projections about
Greenvale Energy and the industry in which they operate. However, please note, they do relate to future matters and thus are
subject to various inherent risks and uncertainties. Actual events or results may differ materially from the events or results
expressed or implied by any forward-looking statements.
The past performance of Greenvale Energy is no guarantee of future performance.
None of Greenvale Energy’s Directors, Officers, Employees, Agents or Contractors makes any representation or warranty (either
express or implied) as to the accuracy or likelihood of fulfilment of any forward-looking statement, or any events or results
expressed or implied in any forward-looking statement, except to the extent required by law.
You are cautioned place no undue reliance on any forward-looking statement. The forward-looking statements in this presentation
reflect views held only as at the date of this presentation.
COMPETENT PERSON STATEMENT
The information in this presentation that relates to the Alpha Mineral Resource Estimate is based on information compiled by Mr.
Carl D’Silva, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy (Member number
333432). Mr. D’Silva is a full-time employee of SRK Consulting (Australasia) Pty Ltd, a group engaged by the Company in a consulting
capacity.
Mr D’Silva has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the
activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’. Mr D’Silva consents to the inclusion in the report of the matters based on
his information in the form and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the information included in the
Mineral Resource Estimate dated 9 March 2022 as announced to the ASX on that date and which is available at
www.greenvaleenergy.com.au. The Company confirms that in relation to the Alpha Torbanite Project Mineral Resource Estimate, all
material assumptions and technical parameters underpinning the estimate continue to apply and have not materially changed
when referring to its resource announcement made on 9 March 2022.
The information in this presentation that relates to liquefaction testing is based on information compiled by David Cavanagh, a
Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy AusIMM Member number 112318.
David Cavanagh is a full-time employee of Core Resources.
David Cavanagh has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and
to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. David Cavanagh consents to the inclusion in the report of
the matters based on his information in the form and context in which it appears.
This presentation has been authoirsed for release by the Greenvale Energy Ltd Board of Directors.
Corporate Summary
Greenvale Energy Ltd (ASX: GRV)
CAPITAL STRUCTURE
Shares on issue
M
433
Options
M
28
Share price (11 September 2023)
A$
$0.08
Market Capitalisation (11 September 2023)
A$
$32.9m
Cash & Liquid Investments (11 September 2023)1
A$
$7.93m
%
45%
Top 20 Shareholders
1. The above liquid assets amount includes the Company's shareholding in Astute Metals NL (ASX:ASE). It is noted that the
following shares held in Astute Metals NL by the Company remain subject to the following escrow terms:
(a) 13.80 million shares which are to be released from escrow on 28 November 2023; and
(b) 23.00 million shares which are to be released from escrow on 28 November 2024.
BOARD & MANAGEMENT
EK
Mr Neil Biddle
Non-Executive Chairman
Mr Mark Turner
Executive Director/CEO
Mr Elias Khouri
Non-Executive Director
Mr Vince Fayad
Co-Company Secretary
Greenvale Energy Ltd – Value Proposition
Two unique projects, one driving goal.
ALPHA
TORBANITE
PROJECT
SAFER
MORE SUSTAINABLE
High-grade bituminous shale
QLD
GEOTHERMAL
PROJECTS
Untapped renewable energy opportunity
SEALED ROADS
Australia’s only end-to-end producer of high-quality and sustainable bituminous products
ON THE ROAD TO SUCCESS
ALPHA TORBANITE PROJECT (QLD)
Alpha Torbanite Project – Summary
A unique and viable indigenous source of bitumen
18.6Mt
inferred resource of Torbanite & Cannel Coal
698ltrs
of hydrocarbons per tonne of Torbanite
21.29m
barrels of synthetic oil equivalent
Located in central QLD, 500km west of Rockhampton
Top of the class
Alpha among the highest yielding oil shales globally
Comparative data of various oil shales
Deposit
Torbanite/Coal/
Oil shale
Oil Yield (LTOM)
Range
Average
Torbanite
50 - 620
420
Cannel coal
50 - 150
120
Green River (USA)
Oil shale
45 - 460
135
Rundle, Qld
Oil shale
50 - 200
105
Stuart, Qld
Oil shale
50 - 220
94
Duaringa, Qld
Oil shale
50 - 130
82
Condor, Qld
Oil shale
50 - 120
65
Julia Creek, Qld
Oil shale
50 - 100
60
Alpha, Qld
Source: Crisp, P.T., Ellis, J., Hutton, A.C., Korth, J, Martin F.A., and Saxby, J.D., 1987, Australian Oils Shales – A compendium of geological
and chemical data: North Ryde, NSW, Australia, CSIRO Inst. Energy and Earth Sciences, Division of Fossil Fuels, 109pp.
Modified Fischer ASSAY (MFA) Results
Yield of 179 litres per tonne at zero moisture (LTOM) for 21.29 million barrels of synthetic oil equivalent
Mineral Resource Estimate
Maiden JORC MRE complete
MDL330 Inferred Mineral Resource estimate by seam and ply unit
Seam/Ply
Area
(m²)
Volume
(m³)
Waste
Thickness
(m)
Waste
Volume
(bcm)
Tonnes
(Air-Dried)
U
2,587,232
2,733,615
13.27
77,182,496
3,280,338
L1
6,322,012
6,466,130
13.18
111,466,664
7,912,602
LT
6,242,029
3,878,046
0.24
1,174,048
4,595,434
L2
6,081,965
2,344,780
0.10
522,118
2,862,935
Total
18,651,309
Alpha Project Seam Geology
Maiden Inferred JORC Resource Estimate of 18.6Mt of Torbanite and Cannel Coal
Alpha Project – Liquefaction Test Program
Extensive liquefaction test program underway and yielding exciting results
↑
72%
increase in conversion from
solids to oil and gas (Test
Program 2 to 3)
Alpha Project – Update
Resource Upgrade nears completion as Liquefaction Test Program Four commences
Drilling on location at Alpha
Globally recognised university
100 years bitumen experience
Leaders in hydrothermal liquefaction
Industry experts
Bitumen Market – Supply & Demand
Bitumen importation feeds critical infrastructure with a heavy reliance on China
Bitumen Market – Price
C170 bitumen prices remain strong
↑21%
Increase in average monthly gate prices for C170
bitumen since Sep-21
$1,497
QLD C170 closing price as at Sep-23
UNTAPPED POTENTIAL
GEOTHERMAL PROJECTS (QLD)
Why Geothermal?
Sustainable production, significant opportunity
Not Reliant on
Weather
24hr Dispatchable
Electricity
Ultra-Low Emissions
Profile
Geothermal – Project Status
Untapped Renewable Energy Opportunities in Queensland
Geothermal – Closed Loop Technology
Breaking new ground in Australia with CeraPhi Energy
No GHG
No water use
No fracking
No aquifer
contamination
Closed loop down hole heat exchanger
The road so far…and the road ahead
Major milestones achieved along the way and those to come
Bitumen Certification
Product samples sent
Technix for certification.
Modified Fischer Assay
62 drill holes completed, with
284m of 4C core samples; total
program meterage of 2,195m.
2020
2021
SRK Scoping Study
Focus project on higher
value products – bitumen
and activated carbon.
2022
Alpha Production
Alpha PFS
MFA results confirm highyielding nature and strong
commercial potential.
Expanded Field Program
to
Plant fully operational.
Delivery of preliminary feasibility
study est. Q1 2024
Alpha Upgrade
Alpha Pilot Plant
Delivery of upgraded
resource Q3 2023
2023
Mineral Resource Estimate
Maiden JORC Mineral Resource
Estimate (MRE) completed for
Alpha.
Liquefaction Test Work
Production of heavy oil fractions
required for bitumen – significantly
enhanced emissions profile.
PARR Reactor Tests
Third-party PARR reactor testing
and analysis
Commencement of Alpha
pilot plant trials Q2 2024.
2024
2025
EPG Grant
Longreach EPG granted
Q4 2023; Millungera
EPGs Q1 2024
Geothermal Plant
Feasibility & Design
Q2 2024 Millungera Basin
Alpha Plant Design & Build
Design, approvals, build and
commissioning of processing plant.
Q2 2025 – Q2 2027
2026
Enviro. Approvals
Geothermal
environmental
approvals est. Q4 2025
Drilling
Drilling at Millungera
est. Q3 2025
2027
Geothermal Power
Plant Operational
Geothermal power plant
commissioned.
Why Greenvale?
GRV is paving the way
VISION
To become the only sustainable, endto-end, domestic and fully carbonoffset producer of bitumen products
to feed the critical infrastructure
needs of Australia.
CAPABILITY
Experienced Board and Management
ACTION
Articulated renewable energy strategy
and clear actions being taken via
investments in geothermal energy.
Share your feedback
Discover