ASX ANNOUNCEMENT
25 January 2024
DECEMBER 2023 QUARTERLY REPORT
SIGNIFICANT PROGRESS AT ALPHA PROJECT AND EXCITING
HELIUM ACQUISITION IN CENTRAL AUSTRALIA
Highlights
Alpha Torbanite Project, QLD (100%-owned):
•
Updated Inferred Resource of 28Mt of Torbanite and Cannelite, representing a 51% increase
on the maiden 18.6Mt MRE (March 2022).
•
Increase to volumetrics with 27.7 million barrels of synthetic oil equivalent – up 30% on the
previously stated MRE.
•
Technix provide first the indications of bituminous product potential and LicellaTM completes
supercritical test program in two significant advancements with Test Program Four.
•
Monash University program gathering momentum with 9 of 16 test runs now complete and
Test Program Four expected to be completed in early 2024.
Geothermal Project – 100%-owned
•
Native Title Discussions for consent of exploration progressing well.
Georgina Basin IOCG Project, NT (20%-owned):on continued for the Ambient Noise Tom
• Data processing and interpretation continued for the Ambient Noise Tomography (“ANT”)
geophysical survey, which commenced in the previous quarter.
•
Survey results will be used to generate future drill targets.
Corporate:
• Farm-in agreement executed with Mosman Oil and Gas Ltd to acquire a 75% interest in the
highly prospective EP 145 Permit in the Amadeus Basin in Central Australia:
o
•
P 145 hosts an existing Prospective Resource Estimate with a “Best Estimate” of 440
Billion cubic feet (“Bcf”) Total Gas, including 26.4 Bcf of Helium and 26.4 Bcf of Hydrogen.
Issue of $477,000 of fully-paid shares to Pioneer Resources which reduces loan exposure to
that Company.
Overview
Greenvale Energy Limited (ASX: GRV or the Company) achieved a number of significant
milestones during the December Quarter, with its principal focus being to further advance its
100%-owned Alpha Torbanite Project in Queensland towards development.
REGISTERED OFFICE:
Level 5, Suite 6 189 Kent Street, Sydney, New South Wales 2000 | GPO Box 2733, Sydney NSW 2001
+61 2 8046 2799 | admin@greenvaleenergy.com.au | www.greenvaleenergy.com.au
ABN
54
000
743
555
1
The completion of an updated JORC Mineral Resource Estimate (MRE) for the deposit marked
a key step toward the commercial development of this flagship project. The updated MRE
revealed a substantial 51% increase in the total dry tonnes of the deposit, reaching 28Mt of
combined cannelite and torbanite, compared to the maiden 2022 estimate of 18.6Mt.
This enhancement underscores the scale and potential of the Alpha deposit, positioning it as
an asset of considerable commercial significance. The synthetic oil equivalency of the deposit
also saw a notable improvement, with an additional 6.4 million barrels bringing the total to 27.7
million barrels of synthetic oil equivalent.
The updated MRE, calculated using yield estimations from the Modified Fischer Assay (MFA)
results reported in December 2021, is expected to be further enhanced with the imminent
completion of the final stage of liquefaction testing led by Monash University. This progress
not only holds the potential for increased yields but also an elevation of the confidence level
of the MRE from Inferred to Indicated, crucial for the upcoming Pre-Feasibility Study (PFS).
The Company's commitment to refining the extraction process was evident in the positive
outcomes achieved from liquefaction Test Program Four. Greenvale's technical bitumen
advisors, Technix, assessed initial liquefaction bulk samples from PROCOM, indicating the
potential to supply bituminous products of commercial interest to the market. The asphaltene
content of the produced oil extract showed promising properties, with a higher percentage
than standard bitumen, positioning the product as a high-quality blend stock. The observed
extract aligns closely with Class 600 bitumen, a grade commonly used in road construction,
indicating the potential for a premium product. Further exploration of bitumen properties from
additional bulk samples is underway, and the early indications suggest the potential for a suite
of high-value products.
The completion the supercritical water program by LicellaTM, under PROCOM direction,
represented another positive step in Test Program Four. The results obtained from LicellaTM's
test apparatus will contribute valuable insights to Monash University's broader program,
optimising processing conditions and evaluating different seams in four drill holes.
Greenvale's Board and management team are very encouraged by the recent developments
and the positive trajectory toward the maiden PFS for the Alpha Project. The significance of
the first indications of potential commercial products and the contribution from the team at
LicellaTM cannot be underplayed. With a majority of test runs now completed by Monash,
updates for shareholders are anticipated early in the March 2024 Quarter on the progress of
Test Program Four and the final delivery of the PFS.
In addition to these advancements, Greenvale finalised a farm-in agreement with Mosman Oil
and Gas Ltd to acquire a 75% interest in EP 145 in the Amadeus Basin, Central Australia. The
farm-in agreement, which is subject to Ministerial Consent and Government approval for the
transfer of operator rights, positions Greenvale as the operator of the project. EP 145 hosts
an existing Prospective Resource Estimate, including 26.4 Bcf of Helium and 26.4 Bcf of
Hydrogen, offering an exciting opportunity to target the rapidly expanding helium market. The
proximity to critical gas infrastructure provides a near-term commercialization pathway,
complementing the progress of the Alpha Torbanite Project in Queensland.
The transaction terms involved a cash payment of $160,000 for a 75% interest, with Greenvale
funding 100% of the seismic and well work program. The Company will act as the Operator,
overseeing the project through an Operating Committee that it controls. This acquisition aligns
with Greenvale's broad green energy strategy, tapping into the potential of helium and
hydrogen resources in Central Australia.
GREENVALE
ENERGY
LIMITED
2
Projects
Alpha Project, Queensland
Background
The Alpha Torbanite Project is located approximately 50km south of the town of Alpha in
Central Queensland. The Alpha torbanite deposit consists of two seams, an upper seam of
mostly lower-grade mineralisation with an average thickness of 1.12m and a lower seam
containing lenses of torbanite up to 1.9m thick. The Project has been subject to extensive
exploration and laboratory testing since its initial discovery in 1939.
During 2019, SRK Consulting Pty Ltd (“SRK”) was engaged to reassess the project’s
commercialisation strategy. SRK’s report set out a potential new development strategy based
on the production of a diversified suite of value-added products. SRK noted that, in contrast
with typical oil shale deposits, the Alpha torbanite deposit is exceptionally high-grade,
containing up to 650 litres of hydrocarbons per tonne of torbanite, and can produce high-value
bitumen, light crude oil and activated carbon.
The upper and lower bituminous shales also produce similar products, albeit at lower yields of
110-140 litres per tonne. Additionally, the torbanite and bituminous shales can deliver highquality value-added products through appropriate investment in processing infrastructure.
SRK was engaged to undertake a staged work program to assist in evaluating the project's
commercial viability.
Activities during the December Quarter
A key milestone during the December Quarter was the release to market of the updated
JORC Mineral Resource Estimate (MRE) for the Alpha Project on 13th November 2023 (ASX
Release - ‘51% Increase in Alpha Resource Substantially Expands Project Scale and
Potential’).
The updated MRE saw a 9.4Mt increase in the total dry tonnes of the deposit, up from
18.6Mt in the maiden 2022 to 28Mt of combined cannelite and torbanite. This represents a
significant 51% increase in the total size of the Inferred Resource and reinforces the scale
and potential of the Alpha deposit.
The synthetic oil equivalency of the deposit also saw a noticeable improvement, adding 6.4
million barrels for a total of 27.7 million barrels of synthetic oil equivalent.
It is also important to note that the updated MRE synthetic oil equivalency has been
calculated utilising yield estimations from the standardised Modified Fischer Assay (MFA)
results reported back in December 2021 and are likely to improve following completion of
the final stage of liquefaction testing due in the first quarter of 2024.
The updated JORC Mineral Resource Estimate for the Alpha Deposit is set out in Table 1
and Table 2 below, with the Inferred Resource Area shown in Figure 1:
GREENVALE
ENERGY
LIMITED
3
Table 1: MDL 330 Inferred Mineral Resource Estimate by seam and ply unit (plus % +/- from maiden MRE)
Seam
/Ply
Area
(m2)
Volume
(cu m)
Waste
Thickness
(m)
Waste
Volume
(bc m)
Tonnes
(Air Dried)
% +/(Air Dried)
Tonnes
(Dry)
Tonnes
(In Situ)
U
5,199,146
5,409,700
21
181,383,104
6,491,640
+97%
6,653,931
6,437,543
L1
9,056,464
10,548,503
16
142,970,480
12,995,530
+64%
13,291,114
12,869,174
LT
6,774,137
3,635,190
0
157,694
4,301,324
-6.4%
4,325,876
4,289,524
L2
8,684,433
3,465,159
0
41,993
4,267,732
+49%
4,366,100
4,192,842
Total
28,056,227
+51%
28,637,021
27,789,083
The Mineral Resources were estimated for each of the modelled plies for which there are
reasonable prospects for economic extraction. Mineral Resources are limited to the area within
MDL 330 and do not, as previously stated, allow for any extension of the deposit into the
Company’s surrounding exploration permit, EPM27718.
Table 2: MDL 330 preliminary volumetrics for Mineral Resource estimate
Seam
/Ply
Inferred Dry
Tonnes (Mt)
% of Total
Synthetic
Oil
% of Total
Oil Yield
LTOM
No. of Drill
Holes
(MMboe)
U
6.7
23%
4.4
16%
105
2
L1
13.3
46%
8.7
31%
104
4
LT
4.3
15%
10.7
39%
395
4
L2
4.4
15%
3.8
14%
140
4
Total
28.6
100%
27.7
100%
154
6
Mineral Resources have been estimated for Upper and Lower seams (U, L1, LT, L2). Points
of Observation for determining cannel coal and torbanite thickness and continuity include
cored seam intersections, with geophysical wireline log.
The up-dip (northern and north-eastern) limits of the Inferred Resource were defined by the
modelled base of weathering.
An improved topographic surface model obtained from airborne LiDAR acquired in 2022
has changed the projected base of weathering in the northern section of the deposit where
terrain is more variable.
The down-dip (western, southern and south-eastern) extent of the Inferred Resource was
limited to a maximum open cut mining depth of 60m to the floor of the Lower Seam and to
the tenement boundaries of MDL330.
The cannel coal and torbanite lens Resource tonnage calculations were based on the bulk
density model for the coal seam on an in-situ basis. The modelled laboratory air dried bulk
density data for the cannel coal and torbanite units was used to calculate air dried tonnages
and was subsequently adjusted to an in-situ moisture basis using the Preston and Sanders
(1993) calculation.
GREENVALE
ENERGY
LIMITED
4
Figure 1: Inferred Resource Area at Alpha Torbanite Project, QLD.
As in-situ moisture cannot be measured directly, an assumed in-situ moisture of 14% was used
for the Alpha cannel coal, based on an air-dried moisture regression equation developed by
Fletcher and Sanders (2003). The resultant in-situ moisture for the sampled cannel coal seams
typically equates to the air-dried moisture of 9.4%.
A lower in-situ moisture of 6% was assumed for the torbanite lens. Due to its finer pore
structure, lack of cleat and resultant lower air-dried moisture content (av. 5.1% ad) compared
with the cannel coal plies.
No torbanite or cannel coal quality limits/grade cut-offs were applied to the MRE and the
Resource is considered amenable to open cut mining methods.
GREENVALE
ENERGY
LIMITED
5
Additionally, as reported to the market on 27th December 2023 (ASX Release: ‘Test Program
Four Delivers First Indication of Bituminous Products as Licella Completes Supercritical Water
Program’), the Quarter saw the first indications from Greenvale’s technical bitumen advisors,
Technix, of the bituminous potential of the Alpha Deposit.
Technix assessed the initial liquefaction bulk samples from PROCOM and separated the
remaining solids and the produced oil. Initial testing of that bulk oil indicated the potential for
the Alpha Project to supply bituminous products of considerable commercial interest to market.
Technix has confirmed that the full range oil separated out from the bulk sample provided by
PROCOM has very promising properties. The asphaltene content of the produced oil extract is
higher than that of the standard bitumen at approximately 55% (55.3% heptane insoluble), while
the asphaltene content of standard bitumen varies up to 25%.
Without any additives, the viscosity of the cannelite and torbanite extract from core samples is
similar to 60/70 penetration grade bitumen. However, the penetration is significantly less and
therefore, as a blend stock, the product is considered to be of high quality. With respect to the
Australian Standard, the crude extract classification assessed by Technix is close to Class 600
bitumen, with its viscosity at 60C being slightly higher.
Class 600 bitumen refers to a specific grade of bitumen used for road construction and
pavement applications. The classification is determined based on various factors, including
penetration values, softening points and other rheological properties. These properties help in
specifying the suitability of bitumen for different climate conditions and road construction
requirements.
In general, higher-grade bitumen, such as Class 600, may attract a premium compared to
lower-grade bitumen such as Class 300. This premium is typically because higher-grade
bitumen often requires additional refining processes to meet specific performance
characteristics.
The observed extract requires further analysis and understanding of the blending potential
and/or the need for modification by Technix to satisfy the requirements of standard bitumen
used in road pavement applications. The early indications are extremely promising for a highvalue product.
In addition to the study on bitumen properties from two bulk samples of products, a number of
other studies are focusing on the evaluation of Alpha drill core samples to establish whether
they will strongly convert to suitable oils under similar processing conditions to the successful
trials used in Test Programs 1 – 3 on outcrop samples. This work is being undertaken on both
oil and water as carriers for the liquefaction process. To date, the emphasis has been on the
use of water as the carrier.
LicellaTM also completed its supercritical water program, marking another step forward in Test
Program Four under PROCOM direction. The information obtained from LicellaTM test
apparatus results has demonstrated the trends of increased conversion with Supercritical
density as reported in literature. Analysis of the results will provide sound input to the broader
based program being undertaken by Monash University to evaluate all the different seams in
four drill holes and optimise processing conditions.
Technix Bitumen Assessment:
The tests conducted by Technix involved a 2.5L sample of cannelite and torbanite processed
extract derived by using toluene as the carrier for the Alpha Torbanite Project, produced by
PROCOM. The separation of derived oil from the carrier (toluene) and the remaining reaction
solids was comprehensive, involved homogenising the sample, heating, filtration, toluene
washes and separation of the remaining toluene solvent at 110°C, resulting in a 100% heavy
oil Alpha Shale derived extract. Rigorous testing followed, encompassing dynamic viscosity,
penetration, and asphaltene content.
GREENVALE
ENERGY
LIMITED
6
Test methods:
Dynamic viscosity: ASTM D2171 or equivalent Australian Standards
Penetration: ASTM D5. or equivalent Australian Standards
SARA Analysis: ASTM D3279 or equivalent Australian Standards
Results:
Results indicate a total residue of 900g after filtration (not fully dried) and a total crude extract
of 128g after solvent removal. Viscosity measurements at 60°C (887.00 Pas) and 135°C (0.422
Pas). Penetration measured at 32 dmm, and Analysis showed 55.3% heptane insoluble
(asphaltene).
The above results are encouraging. However, toluene will not be used as a carrier in a
commercial plant, and it was used experimentally to allow easy separation of the produced oils.
Toluene will not play a role in the Alpha processing pathway on a large scale. Consequently,
the precise identification of products and determination of yields is not final but directionally
they are a good indicative measure. The derived oil-based bulk sample analyses which will
soon follow will help close this loop.
LicellaTM Test Program:
Unfortunately, the majority of trials fell short of achieving a sufficiently high supercritical fluid
density of around 0.35g/ml as indicated in literature as an optimal for the conversion of the
torbanite, cannelite and blend samples. The target conditions include holding the reagents at
about 400oC for 30 minutes in the reactors of various sizes and methods of agitation.
The collective findings indicate that conversions ranging from 28 wt% to 35 wt% can be
achieved using water as a carrier under the conditions of the experiments. There is potential
for improved yields if the correct conditions can be found. Catalysts have also not been
investigated in this program.
Notably, LicellaTM's liquefaction tests attained the highest conversions, which are reporting
primarily as oil, with lower asphaltene and pre-asphaltene yields compared to Monash
University's tests utilising water as the carrier.
Gas yields of about 8 wt% on an as received basis appeared relatively consistent between both
testing programs with water as a carrier (results appear to be different when oil is used as the
carrier).
Tests of supercritical water densities (0.1-0.16g/ml) at the lower end of the optimal range clearly
indicate improved conversions with increasing density. Yields of pre/asphaltene components
are however low.
Next Steps
The second bulk sample will be separated, and the oils analysed by Technix. This progression
will require a more involved separation procedure compared with the toluene-based product
already analysed. PROCOM has recommended distillation at atmospheric pressures and under
vacuum to split the oil carrier derived products. A vacuum cut at about 340C was suggested to
produce the base for bitumen analyses. Analysis of distillation products will provide insights into
the typical production process and will allow the evaluation of the heavier and the lighter oils
which can both be utilised in bitumen product formulations.
The methods used to separate out asphaltenes from the remaining shale solids will be
standardised according to good laboratory practices to ensure consistency in results and their
interpretation.
GREENVALE
ENERGY
LIMITED
7
Additional analytical tests have been recommended, including TGA on liquid sample to provide
information on the oil components within a specific temperature range. TGA, Proximate and
Ultimate Analysis on the solids will identify any organic materials that may still be present and
further characterise the sample.
In regard to the ongoing liquefaction test program, there are too few results available to make a
definitive call on the best conditions and how the different seams affect yield with water as
carrier. Further tests are planned with Monash at higher Supercritical Densities across all the
four wells.
PROCOM and Monash University will now take the findings of the LicellaTM supercritical water
program and integrate these findings into the ongoing work.
Monash University will continue their work and it is anticipated that the results from their test
runs will be released to the market in the coming Quarter. Their results, along with the ongoing
work by Technix, will be integrated into a final resource statement and the techno/commercial
modelling that will form part of the Pre-Feasibility Study.
Greenvale is confident that the first Quarter of 2024 will see a steady and rewarding flow of
news regarding the Alpha Project, with the Company’s Board and Management looking forward
to sharing updates on this ever-evolving project with shareholders as the news comes to hand.
Geothermal Project, Queensland
Background
Greenvale and its wholly-owned subsidiary, Alpha Resources, is the 100% owner of a number of
Exploration Licences in north Queensland of Geothermal energy projects. Geothermal energy is
the heat produced deep in the earth's core. Geothermal energy is regarded a clean, renewable
resource that can be harnessed for use as heat and electricity.
Activities during the December Quarter
The focus of GRV’s geothermal program has now shifted to the Millungera Basin, where the
company is exploring avenues for reducing well costs, including potential rig acquisition
tailored to the project's needs. A detailed sub-surface review has commenced to provide a
thorough sub-surface assessment to identify drilling risks and define subterranean stratigraphy
more accurately.
Native Title discussions regarding consent agreement for exploration with the Mitakoodi and
Mayi People is progressing and expected agreement to be in place by Q1 2024.
Next Steps
•
Finalisation of Native Title Agreement allowing the Queensland Government to Grant
EPG 2023, EPG2024 and EPG2025.
•
Detailed sub-surface review to complete a thorough sub-surface assessment to
identify drilling risks and define subterranean stratigraphy more accurately.
GREENVALE
ENERGY
LIMITED
8
Georgina Basin IOCG Project, Northern Territory
Background
The Georgina Basin Project, owned by Knox Resources Pty Ltd (Knox), a company which is
20% owned by Greenvale. As part of its ownership of Knox, the Company is required to
contribute to the funding of its share of Knox’s future costs. Greenvale is entitled to a 2% net
smelter royalty (Royalty) for all Iron Oxide Copper Gold (IOCG) product exploited in the future
from the existing tenements owned by Knox.
Located in the highly prospective East Tennant province in the Northern Territory, the Georgina
Project, which is 80% owned by Astute Metals NL (ASX ASE) and the remaining 20% is owned
by the Company and comprises seven granted Exploration Licences and three under
application, for a combined total of approximately 4,500km2 (Figure 2).
The East Tennant province has been the subject of intense geoscientific investigation by both
Geoscience Australia and the Northern Territory Geological Survey for over five years. Precompetitive work undertaken as part of the Federal Government’s $225 million Exploring for
the Future program (EFTF) included solid geology interpretation, alteration proxy mapping and
mineral prospectivity mapping for Iron Oxide Copper Gold (IOCG) deposits; and
The collaborative MinEx CRC National Drilling Initiative, conducted in late 2020, confirmed the
highly prospective nature of the region by intersecting prospective host rocks, IOCG-style
alteration and sulphide mineralisation as part of a 10-hole program at East Tennant.
IOCG deposits are typically large, economically attractive copper-gold deposits with some
smaller high-grade variants – most notably those at Tennant Creek. This style of deposit
contains elevated levels (10-60wt %) of the iron oxide minerals magnetite and hematite, which
gives rise to their (typically) elevated magnetic and gravity (density) properties.
Australian IOCG’s include the South Australian Olympic Dam, Prominent Hill, and
Carrapateena deposits, Ernest Henry in north-west Queensland, and the high-grade Northern
Territory Warrego and Juno deposits, located west of the Georgina Project at Tennant Creek.
Knox has been awarded a co-funding grant by the NT Government to conduct the ANT survey,
under Round 16 of the Geophysics and Drilling Collaborations program. The grant, valued at
$100k, is one of two awarded to the Company this year. The award of this grant is testament
to the sound technical rationale employed by the Astute technical team in the survey design.
The Company would like to acknowledge the Northern Territory Geological Survey for their
continued support and their commitment to establishing the Northern Territory as a Tier-1
exploration jurisdiction.
Work During the Quarter
During the quarter, Knox/ASE continued data processing and interpretation for the Ambient
Noise Tomography (“ANT”) geophysical survey, which commenced in the previous quarter.
The survey is located over its highly prospective central Georgina tenement, EL33375, in the
Northern Territory. The survey, conducted using Fleet Space Technologies “ExoSphere”
technology, is the first of its kind to be employed in the frontier IOCG-prospective East Tennant
region.
Full details of the findings from the ANT review were announced on 11th January 2024 and full
details will be released in the Company’s 31 March 2024 Quarterly Report.
GREENVALE
ENERGY
LIMITED
9
ExoSphere Technology
EXOSPHERE BY FLEET® is a solution for the mineral exploration industry that provides 3D
mapping of the subsurface at greater depths and increases accuracy in drilling targets. The
cutting-edge technology utilises Ambient Noise Tomography (ANT) and is helping the world in
the energy transition by creating a faster, more sustainable and less expensive route to finding
critical mineral deposits.
The sensors are deployed in a survey area and leverage real-time passive seismic methods
to ‘scan’ the land beneath in search for minerals. This is enabled through non-invasive ANT
which listens to seismic waves. The data is rapidly processed and transmitted through Fleet’s
low power satellite network to create a 3D model of the area in near real-time.
ANT surveys have been successfully employed by a number of resources companies across
Australia, including Northern Star Resources (ASX: NST), Hillgrove Resources (ASX: HGO)
and fellow IOCG explorer Coda Minerals (ASX: COD). More information is available at
https://fleetspace.com/mineral-exploration
Figure 2. Knox Resources tenements (green), neighbouring tenements and location of ANT Survey
GREENVALE
ENERGY
LIMITED
10
Corporate Activities
Acquisition of 75% interest in helium, hydrogen and hydrocarbon project in the
Amadeus Basin, Northern Territory
During the quarter, the Company executed a Farm-in Agreement with Mosman Oil and Gas
Ltd (AIM: MSMN, “Mosman”) to acquire a potentially ultra-high-grade helium, hydrogen and
hydrocarbon opportunity in the Amadeus Basin in Central Australia.
Under the terms of the agreement, the to the Company’s wholly owned subsidiary, Greenvale
Gas Pty Ltd (Greenvale Gas), will acquire 75% interest in EP 145 permit in the Northern
Territory which is 100% owned by Trident Energy Pty Ltd, which is a wholly subsidiary company
of Mosman Oil & Gas. The agreement is subject to Ministerial Consent by the Northern
Territory government approval for the 75% interest the transfer of Operator rights to Greenvale
Gas.
Mosman reported a Prospective Resource Estimate for EP 145 on 24 October 2022 which
included a “Best Estimate” (applying the SPE PRMS standard) of 440 Billion cubic feet (“Bcf”)
Total Gas, including 26.4 Bcf of Helium and 26.4 Bcf of Hydrogen.
The Amadeus Basin has a long history of hydrocarbon production in the Palaeozoic and late
Proterozoic succession. Helium and hydrogen production have been proven through
exploration drilling, with some of the highest concentrations of helium globally – highlighting its
potential to become a world-class province for helium and hydrogen.
Mosman’s Permits
Figure 3 – Location of Mosman Permits in the Amadeus Basin
The EP 145 permit sits within recognised play fairways for helium and hydrogen and contains
proven hydrocarbon discoveries. The permit lies on-trend with the producing Mereenie oil &
gas field and is optimally located for helium, hydrogen and hydrocarbons.
Successful helium wells are located along the margins of the Amadeus Basin at Mt Kitty-1 and
Magee-1, with existing gas pipeline infrastructure to Darwin and the Australian East Coast,
providing an opportunity for rapid development and commercialisation.
GREENVALE
ENERGY
LIMITED
11
A preliminary technical evaluation for EP 145 commissioned by Mosman in 2022 and
undertaken by Geognostics Australia Pty Ltd identified favourable scenarios for all three
essential play elements related to viable helium and hydrogen plays. These components are
also present in the Mount Kitty-1 and Magee-1 wells. The key findings of the Technical Report
included 1:
1. identified favourable scenarios for all three essential play elements related to viable
helium and hydrogen plays including:
(a)
basement composition as a source of helium;
(b)
basement structure and connectivity via faults systems to support entrapment
and / or migration of deeply-sourced gases (hydrogen and helium); and
(c)
possible seal facies above basement
2. EP 145 is underlain by felsic-intermediate granites, a known source of helium in the
basin.
3. EP 145 contains the West Walker anticline with traps at multiple levels and migration
pathways.
4. The Gillen Formation evaporites interlayered with thin salt could be present and could
act as viable seals.
Figure 4: Helium play fairway map, Amadeus Basin.
See Mosman Oil and Gas announcement 24 October 2022: “EP 145 Prospective Resource Estimate for Helium
and Hydrogen”.
1
GREENVALE
ENERGY
LIMITED
12
Since 2006, the helium market has experienced periods of severe supply shortages, with
strong forecast demand growth and very few new sources of