Alpha Torbanite Project Update - Test Program Four and PFS
Released
Released
Announcement PDF
13 March 2024
Alpha Torbanite Project – Development Update
GREENVALE TO ADOPT STAGED APPROACH AND TARGETS
100,000tpa BITUMEN PRODUCTION PLANT IN STAGE 1 AS
PFS MOVES INTO FINAL STAGES
Early results from Test Program 4 support a long-life project capable of meeting
accelerating domestic demand for bitumen from growing infrastructure needs.
Key Points:
•
Liquefaction Test Program 4 continues to make strong progress.
•
Greenvale to adopt a staged development approach to bitumen production,
with initial results supporting a conceptual design basis for an initial 100,000tpa
bitumen processing plant at Alpha, increasing later to 200,000tpa.
•
This would position Alpha to meet a portion of rapidly growing demand for
bitumen and blended products to meet local supplier and infrastructure needs.
•
Extended Liquefaction Test Program 4 expected to deliver robust oil yields.
•
Pre-Feasibility Study (PFS) expected to be finalised in Q2 2024.
Greenvale Energy Limited (ASX: GRV, “Greenvale” or “the Company”) is pleased to provide
an update on progress with the current Liquefaction Test Program (‘Test Program 4’) and
delivery of the maiden Preliminary Feasibility Study (PFS) for its flagship 100%-owned Alpha
Torbanite Project in Central Queensland.
The Alpha deposit is currently being analysed on a number of fronts in preparation for the
delivery of the PFS. The key areas of mine planning, processing and product marketing are
all taking shape, with considerable advancements also being made on the initial process plant
design.
GRV is taking a staged approach to the project based on the development of two trains, with
the design of Train 1 underpinned by the results from the completed Liquefaction Test
Programs to date (Programs 1, 2 & 3) and preliminary indications from Test Program 4.
This information has informed the conceptual design basis of the plant, initially aimed at
producing 100,000 tonnes of bitumen and blended products annually from 500,000 tonnes of
mined resource.
REGISTERED OFFICE:
Level 5, Suite 6 189 Kent Street, Sydney, New South Wales 2000 | GPO Box 2733, Sydney NSW 2001
+61 2 8046 2799 | admin@greenvaleenergy.com.au | www.greenvaleenergy.com.au
ABN
54
000
743
555
Train 2 would commence on completion of Train 1 construction and would increase annual
production to 200,000 tonnes of bitumen by expanding the process plant and increasing
mining by a further 500,000 tonnes, resulting an estimated mine life of 20 years.
The projected mine life of 20 years is based on preliminary assessments only and this could
be further extended or expansion via an additional Train 3 could be contemplated if further
exploration of the known 10km strike length and further metallurgical test work justifies it. It is
important to note that this estimate, while useful for initial planning, does not fully reflect the
mine's operational potential and resource base.
A more rigorous, data-supported evaluation of the Alpha Project’s lifespan will be provided as
part of the PFS.
Drawing on the preliminary insights from Test Program 4, together with the conclusive results
received from the initial three Liquefaction Test Programs, the Train 1 process plant will be
designed to produce 100,000 tonnes of bitumen and blended products annually, underpinned
by a robust and data-driven foundation.
This is further substantiated by several key operational efficiencies and technological
innovations identified through these test programs and the broader development of the
project's PFS.
Firstly, the mining operation benefits from the straightforward extraction of ore from two distinct
and relatively shallow seams, ensuring a reliable and consistent ore feed. The feasibility of
blending different ore layers at the mine face guarantees a steady supply to the plant,
supported by the ease of crushing and the consistently low moisture content of the deposit,
which eliminates the need for additional drying processes.
The strategic choice of an oil-based carrier, together with the plant's ability to adjust product
yield with minor adjustments in temperature and residence time, exemplifies the flexibility and
responsiveness of the design to operational needs.
The cost-effectiveness and availability of the catalyst, combined with the simplicity and
affordability of construction techniques for solids preparation and processing equipment, adds
to the plant's operational viability. The design incorporates environmentally sustainable
practices, such as early separation of asphaltenes, energy recovery from by-products and the
recycling of oils, contributing to the plant's operational efficiency and environmental
performance.
Additionally, specific treatment processes are employed to ensure that solids returned to the
mine are devoid of volatile hydrocarbons, further demonstrating the project's commitment to
minimizing its environmental impact. These operational insights, together with the commitment
to tailoring products to meet local bitumen manufacturing demands, not only affirm the
projected annual production volume but also enhance the plant's potential economic and
environmental sustainability.
The final preliminary process plant design is reliant on proving up the deposit and process
yields, work that Greenvale is currently completing.
As previously reported, the Company’s current liquefaction testing regime has focused on the
outcropping materials initially sampled when the program commenced some two years ago.
The results to date have been extremely encouraging with the outcropping material achieving
extremely high yields at temperatures of approximately 400°C.
GREENVALE
ENERGY
LIMITED
2
The latest test program, Test Program 4, has seen the conditions under previous programs
interrogated and then re-performed utilising core samples taken from a representative model
across the maiden (2022) Mineral Resource Estimate (MRE) area.
On 13th November 2023, the Company announced a 51% increase in the size of the Alpha
deposit (ASX Announcement: Substantial Increase to Alpha Resource). The updated Mineral
Resource Estimate (MRE) saw a 9.4Mt increase in the total dry tonnes of the deposit, up from
18.6Mt in the maiden 2022 Resource, to 28Mt of combined cannelite and torbanite.
This significant increase in the size of the Alpha deposit has meant that, in order for the
additional 9.4Mt of cannelite and torbanite to be included in final modelling for the PFS, a
supplementary sampling and liquefaction testing campaign on samples selected from of the
20 additional HQ core holes completed in early October 2023 (see ASX announcement, 2
October 2023) will be undertaken in later stages.
The Company previously envisaged that Liquefaction Test Program 4 would be sufficient to
extrapolate the yield calculations across the additional 9.4Mt of Resource.
However, after consulting with the Company’s technical advisors, the Greenvale management
team believes it is prudent to extend Test Program 4 to include samples from the core holes
acquired in October 2023 which embrace both seams.
Given that Test Program 4 is nearing completion and that the testing apparatus, technical
teams and third-party partners are all up to speed, it is not anticipated that the additional testing
will result in a significant delay to the delivery of the PFS.
Assuming a smooth completion of this additional testwork, the Company expects to finalise
and deliver the PFS in Q2 2024. This in turn will pave the way for off-take and strategic
investment discussions that are likely to commence immediately after delivery.
Management Comment
Commenting on the latest progress, Greenvale CEO Mark Turner said: “We are now well and
truly at the pointy end of bringing everything together for the Alpha Project PFS. Liquefaction
Test Program 4 is progressing well and delivering very promising results which support the
design premise for a facility initially capable of producing 100ktpa of bitumen and blended
products over a 20-year plant life with significant expansion potential beyond that to 200ktpa.
“While the additional time required to extend Liquefaction Test Program 4 to include the
additional Resource defined late last year is frustrating, we do not want to compromise the
very high standard of work that has been put into this Project from the outset.
“All of the work completed to date points towards a very robust, long-life project with the
potential to become a significant producer of bitumen and blended products into the domestic
market in Australia. Given the forecast increase in demand for bitumen over the next decade,
particularly from major infrastructure-driven projects such as those associated with the
Brisbane Olympics in 2032, this is a very opportune time to be commercialising a project such
as Alpha.
“While I appreciate the frustrations that our shareholders have experienced with the delays
with the various test programs over the past year, I do feel that we are now closing-in on the
delivery of what will be a pivotal document for the future of this Company.
“I would like to thank shareholders and investors for their patience and ask them to bear with
us as we complete the final stages of the work programs required to deliver the PFS and get
ready for what should be a very important 2-3 months ahead for Greenvale.”
GREENVALE
ENERGY
LIMITED
3
Technical Discussion
Studies undertaken so far have included:
•
•
•
•
•
•
Variability in the Outcrop ply – Torbanite and the Cannelite yield.
Impact of temperature on the extent of conversion on Outcrop and Core on an as
received and dry ash free bases.
Impact of the use of a standard liquefaction catalyst versus no added catalyst.
Impact of water versus oil as the carrier fluid to support the liquefaction studies
Impact of time on the extent of conversion.
Comparison of yields versus Modified Fisher Assay conversions.
The products have been analysed from a number of perspectives:
Variable
Gas yield
Oil Yield
Cannelite
Oil yield on
torbanite
Blends
Result
Yield is reasonably constant at
about 8 wt% average
Oil yield increases with
temperature, finding the best
conditions is on going
Better than for Coaly Shale as
anticipated and follows the MFA
results
Results are quite predictable by
the ratio of the masses and the
respective liquefaction yields of
the different ply from the deposit
Using toluene
as carrier of
solids for a
batch test
A product which has properties of
the top hardness bitumen used in
Australia were produced.
Using water as
a carrier in
liquefaction
trials
Good asphalt and relative low oil
yields were achieved. Optimal
processing conditions are
relatively difficult to achieve in a
batch reactor so the oil carrier had
been favoured
This shows promise with good
yields above the proposed
minimum are achievable. Yields
better than MFA have been
achieved, as is expected if the
process has merit.
Using a base
lube oil as
carrier
GREENVALE
ENERGY
LIMITED
Compared with MFA
Gas yield is about 8 wt%
Similar oil yields can be
achieved
Oil yield equal to and better
than have been achieved
Similar outcomes as
anticipated for blends of ply
when undertaking MFA, as
results are proportional to
the amount of respective ply
represented
While not representative of
the process on the proposed
plant it is a clear
demonstration of the type of
products which are possible.
The bulk samples were
prepared at low
temperatures of about 360C,
increasing this to 400C
increases yields and lightens
the products. These tests
are on going
Ongoing work is nearing
completion and the
laboratory results will be
added in to the development
of the yield structure for the
PFS.
4
Product is produced to achieve a high yield of the most productive blends:
A range of samples have been produced for testing for use as and incorporating into
bitumen.
The campaigns are ongoing.
The product quality will be targeting local bitumen main products which are based on
viscosity.
We have made very high viscosity over 880 Pa.sec close to the top hardness for locally
used bitumen, this was derived from low temperatures (370 – 380C) and long
residence times (over 60 minutes).
Increasing the temperature of the reaction at lower residence times can reduce
viscosity of the oil closer to the 160 Pa.s for the prime bitumen products.
Australia imports about 1 million tonnes of bitumen annually. The supply of 100,000
tonnes would not greatly affect a market if the supply is regular and of uniform
specification, which is the benefit of this process over the production of bitumen from
potentially variable refinery heavy bottoms.
•
•
•
•
•
•
Figure 1.
% Yield on As-received basis
80
TP4 Well 28,7MPa, 390-396oC for blend and 400-407oC for torbanite/cannel coal,
Oil as carrier, with catalyst
60
40
Gas
Total Conversion
Oil
Asphaltene
Preasphaltene
Oil+As+PreAs
20
0
0.0
0.2
0.4
0.6
0.8
1.0
Ratio (Cannel coal/Total)
The graph shows that processing of the cannelite and torbanite are not necessarily impacted
by variations in their ratios, hence the blends of feed shale is a weighted average of their
relative performance in isolation. This provides confidence that the processing yields for
different blend ratios can be anticipated with confidence.
GREENVALE
ENERGY
LIMITED
5
Figure 2
Comparison of yields for Outcrop materials (lines) versus Yields for Core samples for
Cannelite
Effect of temperature on Blend liquefaction
60
Gas from Core liquefaction
Total conversion from Core liquefaction
Oil from Core liquefaction
Asphaltene from Core liquefaction
Oil+As from Core liquefaction
Gas from Outcrop liquefaction
Total conversion from Outcrop liquefaction
Oil from Outcrop liquefaction
Asphaltene from Outcrop liquefaction
Oil+As from Outcrop liquefaction
% Yield on As-received basis
50
40
30
20
10
0
340
350
360
370
380
390
400
Temperature (oC)
The results show similar yields for both Outcrop material (taken from the weathered zone)
compared to Core taken from wells below the weathering zone. Outcrop material processes
well compared with the Core material and should represent upside to the operation. Core
material generally requires higher temperatures to achieve equivalent yields or a longer
processing time.
GREENVALE
ENERGY
LIMITED
6
In Figure 3 below, the yields from the cannelite require longer processing times. Results show
that the desired conversion of 30 % is achievable and is largely unaffected by temperature for
the Core, but the Outcrop materials were positively influenced by the increase in temperature
towards 400C at longer residence times.
The process will be designed to achieve about 420C as a maximum to ensure the best results
are achieved dependent on the feed material to the plant.
Effect of temperature on Cannel Coal liquefaction
% Yield on As-received basis
80
Gas from Outcrop liquefaction
Total conversion from Outcrop liquefaction
Oil from Outcrop liquefaction
Asphaltene from Outcrop liquefaction
Oil+Asphaltene from Outcrop liquefaction
Gas from Core liquefaction
Total conversion from Core liquefaction
Oil from Core liquefaction
Asphaltene from Core liquefaction
Oil+As from Core liquefaction
60
40
20
0
340
350
360
370
380
390
400
410
Temperature (oC)
GREENVALE
ENERGY
LIMITED
7
In the following graph, the impact of processing conditions on torbanite is shown for Outcrop
and Core samples.
Effect of temperature on Torbanite liquefaction
Gas from Core liquefaction
Total conversion from Core liquefaction
Oil from Core liquefaction
Asphaltene from Core liquefaction
Oil+As from Core liquefaction
Gas from Outcrop liquefaction
Total conversion from Outcrop liquefaction
Oil from Outcrop liquefaction
Asphaltene from Outcrop liquefaction
Oil+As from Outcrop liquefaction
% Yield on As-received basis
80
60
40
20
0
340
350
370
360
380
390
400
410
Temperature (oC)
Only Three points were studies for Outcrop processing and so the lines are only an estimate
of how yields vary with temperature. However the Core samples show the positive impact of
only 10 degrees with overall conversion increasing from about 38 % to over 65% at 400C.
Under these conditions the Torbanite Core has performed better than the outcrop material.
A further comparison of yields is being undertaken to compare liquefaction yields with standard
MFA yields for a number of Wells.
Product yields can be as high as MFA or higher. Results show that Liquefaction does have
advantages with the correct processing conditions as can be seen from the following graphs
which is plotting MFA in Litres per dry tonne and the liquefaction yield also quoted in these
terms using a Specific Gravity of 0.95.
Well 9 and Well 14 tests are being repeated by Monash to see if improved yields can be
achieved in line with the later results for Well 28 under modified temperature and residence
times.
GREENVALE
ENERGY
LIMITED
8
MFA Oil Yield
Oil+asphaltene yield from experiment
800
800
Relative oil yield from MFA (LTOM)
700
600
600
400-407oC
60 min
400
500
400
300
200
200
100
0
Well 28 Blend
Well 28 L
Well 28 LT
Well 21 Blend
Well 21 L
Well 21 LT
Well 9 Blend
Well 9 L
Well 9 LT
0
Oil+Asphaltene yield (L/T) from experiment daf basis
Comparision between MFA vs experimental Oil +Asphaltene yield
Comparison between MFA and experimental oil + Asphaltene yield from Well 9, 21 and 28
torbanite and cannelite are shown.
Note tests were conducted at 390 – 395 C for Wells 9 and 21 and higher for the torbanite and
cannelite in Well 28 with conversion equal to or better than MFA for Well 28.
The tests on Well 9 were the first tests undertaken and the temperatures were lower at about
390C. Increasing the temperature and time for Well 28 show marked increase in conversion
of torbanite to above the MFA yields.
Supporting tests to evaluate yields against an additional number of wells which contain Upper
Seam material are being conducted to confirm the higher yields than MFA are achievable in
preparation for the PFS.
Analytical results are still coming into provide more detail on the oil fractions produced and will
be reported in due course.
The work to date is focused on an average yield of about 30 wt% of the mined material being
processed into bitumen products on an average blend of torbanite with the cannelite. Where
the torbanite concentrations are higher than there is potential for higher conversions than the
target 30% average yield.
GREENVALE
ENERGY
LIMITED
9
Comparison of product yields obtained from liquefaction of shale from different wells under TP4
Note high yield of oil from Torbanite on Well 28 is achieved at slightly higher temperatures (390 to 405
C) shows marked increase in conversion with negligible change in gas production and similar
asphaltene contents. Confirmatory tests are being undertaken to demonstrate the higher yield can be
achieved across other Wells.
The overall programs which are almost finished and together with the final laboratory analyses
will provide added detail to the plant design and confidence in the yield values and the product
structure of the yields.
Comparing different bore holes across the deposit under similar conditions provides a basis
that the different ply will process comfortably to an average yield represented by the average
mass portions of the yields of the separate ply. The test results also show that yield structure
can be changed by relatively small variations in temperature and residence time to change
products so as to make desirable products for the market.
Discussions are ongoing on the product and their quality to allow statements to be made in
relation to the likely value of the products.
GREENVALE
ENERGY
LIMITED
10
AUTHORISED FOR RELEASE:
The Board of Greenvale has approved this announcement for release.
FOR FURTHER DETAILS, CONTACT:
Mark Turner, CEO, 0459 519 999
MEDIA INQUIRIES:
Nicholas Read
Read Corporate
Nicholas@readcorporate.com.au
Mobile: 0419 929 046
Competent Person’s Statement:
The information in this report that relates to Exploration Results (Liquefaction Testwork 4 and
yield data) is based on information reviewed by David Cavanagh, a Competent Person who is
a Member of The Australasian Institute of Mining and Metallurgy AusIMM Member number
112318. David Cavanagh is a full-time employee of Core Resources.
David Cavanagh has sufficient experience that is relevant to the style of mineralisation and
type of deposit under consideration and to the activity being undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’.
David Cavanagh consents to the inclusion in the report of the matters based on his information
in the form and context in which it appears.
The information in this report that relates to Exploration Results (Resource Estimation) is
based on information compiled by Mr. Carl D’Silva, a Competent Person who is a Member of
The Australasian Institute of Mining and Metallurgy (Member number 333432). Mr. D’Silva is
a full-time employee of SRK Consulting (Australasia) Pty Ltd, a group engaged by the
Company in a consulting capacity. Mr D’Silva has sufficient experience that is relevant to the
style of mineralisation and type of deposit under consideration and to the activity being
undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’. Mr D’Silva consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
GREENVALE
ENERGY
LIMITED
11
FUTURE STATEMENTS
Statements contained in this release are or may be forward looking statements. Such
statements relate to future events and expectations and as such involve known and unknown
risks and significant uncertainties, many of which are outside the control of Greenvale. Actual
results, performance, actions and developments of Greenvale Energy may differ materially
from those expressed or implied by the forward-looking statements in this release. Such
forward looking statements speak only as of the date of this release. There can be no
assurance that actual outcomes will not differ materially from these statements. A number of
important factors could cause actual results or performance to differ materially from the
forward-looking statements. Investors should consider the forward-looking statements
contained in this release in light of those disclosures. To the maximum extent permitted by law
(including the ASX Listing Rules), Greenvale and any of its affiliates and their directors,
officers, employees, agents, associates and advisers disclaim any obligations or undertaking
to release any updates or revisions to the information in this release to reflect any change in
expectations or assumptions; do not make any representation or warranty, express or implied,
as to the accuracy, reliability or completeness of the information in this document, or likelihood
of fulfilment of any forward-looking statement or any event or results expressed or implied in
any forward-looking statement; and disclaim all responsibility and liability for these forwardlooking statements (including, without limitation, liability for negligence). Nothing in this
document will under any circumstances create an implication that there has been no change
in the affairs of Greenvale since the date of this release.
GREENVALE
ENERGY
LIMITED
12
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Sampling techniques
Nature and quality of sampling (e.g., cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such as
downhole gamma sondes, or handheld XRF instruments,
etc.). These examples should not be taken as limiting the
broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done; this
would be relatively simple (e.g., ‘reverse circulation drilling
was used to obtain 1 m sample from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases, more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.,
submarine nodules) may warrant disclosure of detailed
information.
Drilling techniques
54
000
743
The samples refer to in this announcement were taken from the 2021 partly
cored (4C – 100mm diameter) hole drilling program on a nominal 250 x 250m
grid for the purpose of obtaining torbanite and cannel coal quality samples
from the Upper and Lower seams.
Refer to ASX Announcement date – 9 March 2022.
Drill type (e.g., core, reverse circulation, open-hole hammer, Not applicable to this announcement
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g.,
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit, or other type, whether core is
oriented and if so, by what method, etc.).
REGISTERED OFFICE:
Level 5, Suite 6 189 Kent Street, Sydney, New South Wales 2000 | GPO Box 2733, Sydney NSW 2001
+61 2 8046 2799 | admin@greenvaleenergy.com.au | www.greenvaleenergy.com.au
ABN
Commentary
555
Criteria
JORC Code explanation
Drill sample recovery
Method of recording and assessing core and chip sample Not applicable to this announcement
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
Logging
Whether core and chip samples have been geologically and Not applicable to this announcement
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core
(or costean, channel, etc.) photography.
The total length and percentage of the relevant intersections
logged.
GREENVALE
ENERGY
LIMITED
Commentary
14
Criteria
JORC Code explanation
Sub-sampling techniques
If core, whether cut or sawn and whether quarter, half or all 8 Core samples from different holes in total have been prepared and
held as sub 200 micron by ply
core taken.
If non-core, whether riffled, tube sampled, rotary split, etc. Subsamples have been cut from the separate sub 200 micron samples of each
ply which have been held in refrigeration for test program 4 including samples
and whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness to Monash University and Licella.
of the sample preparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is representative
of the in situ material collected, including for instance results
for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
and sample preparation
Quality of assay data and
laboratory tests
Verification of sampling
and assaying
Location of data points
GREENVALE
Commentary
The nature, quality and appropriateness of the assaying and Test Program 4 involved repeating the tests conducted on Outcrop material but
laboratory procedures used and whether the technique is now utilising core from 8 wells across the resource.
considered partial or total.
A detailed range of tests have been performed to understand the core material
For geophysical tools, spectrometers, handheld XRF and liquefaction tests using oil and water-based carriers have been conducted
instruments, etc., the parameters used in determining the on the subsamples using standardised test procedures.
analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
Refer to ASX Announcement date – 27 December 2023.
Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision
have been established.
The verification of significant intersections by either Torbanite and cannel coal quality results were verified by experienced SRK
independent or alternative company personnel.
personnel before inclusion in the geological model and resource estimate and
The use of twinned holes.
representative samples provided.
Documentation of primary data, data entry procedures, data Core samples from 8 wells has now been used from Greenvale storage sites
verification, data storage (physical and electronic) protocols. and split by Greenvale contractors, prepared as sub 200 micron for each ply
Discuss any adjustment to assay data.
and held in closed labelled plastic bags and stored in a freezer.
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings and
other locations used in Mineral Resource estimation.
ENERGY
LIMITED
The wells chosen are 9, 14, 21, 28 for the initial work and further
supplemented by wells 19, 128, 137, 138.
15
Criteria
JORC Code explanation
Specification of the grid system used.
Quality and adequacy of topographic control.
Commentary
Well
Easting
Northing
9
482757
7333602
14
482872
7333231
21
483334
7332843
28
483813
7332150
19
482251
7332674
128
484816
7331276
137
480843
7332637
138
481532
7333468
There is high confidence in the location of data points associated with this
announcement.
Refer to ASX
Share your feedback
Discover