Alpha TP7 Milestone 3 production udpate
Released
Released
Announcement PDF
ASX Release 23 February 2026
Interactive Investor Hub - Engage directly with the Company through our Investor hub, you can ask questions, review
comments and get direct access to the Company – follow the link greenvaleenergy.com.au/announcements
Greenvale Energy Limited ABN 54000743555 W: greenvaleenergy.com E: admin@greenvaleenergy.com.au
Perth: Level 1, 1 Alvan St, Subiaco, 6008 Brisbane: Suite 5-Level 12, 10 Market St, Brisbane 4000 Page | 1
ALPHA PROJECT TEST PROGRAM 7 ADVANCES WITH BULK
SAMPLE PRODUCTION ON SCHEDULE
Greenvale Energy Limited ASX: GRV (“Greenvale” or “the Company”) is pleased to provide an
update on the current phase of work for the Alpha Torbanite Project, Test Program 7 (TP7). TP7
continues as planned, the Monash University processing team has completed one production
run a week, commencing in December, and will continue through to the first week of March 2026.
Greenvale has initiated discussions with Monash regarding the possibility of extending the bulk
sample production phase if needed. The bulk sample production is being undertaken for the
purpose of independent product certification, initial product characterisation work will
commence in the coming weeks.
Greenvale CEO Alex Cheeseman said:
“Milestone 3 is advancing as planned, with six bulk pressure leach runs completed so far and
three remaining under the current contract scope. This phase of work has always been about
deriving a bulk sample to allow further refinement and ultimately certification. We may choose to
extend the production phase if needed, and those discussions have commenced.
Highlights
▪ Test Program 7 (TP7) for the Alpha Torbanite Project has the single
objective of producing a bituminous product that can be independently
certified to commercial C-170 specification.
▪ TP7 Milestone 3 – the production of a bulk sample – continues to progress
as planned, with six of nine contracted production runs completed.
▪ Weekly process reviews have identified optimisation opportunities in the
initial test runs, leading to changes to mechanical equipment, peak
temperature and reaction retention times.
▪ Current production runs are achieving consistent results with ~99wt%
conversion of torbanite, resulting in an average ~32wt% of toluene soluble
yield as the primary pressure leach intermediate product.
▪ Initial samples have been sent to Technix in New Zealand for product
characterisation and preliminary testing for the next phase of processing
and product certification.
Greenvale Energy Limited ASX Release
Page | 2
“As part of the downstream process development, Greenvale will engage Technix to apply their
own proprietary process to the product derived by Monash University. We are getting this work
started early with an initial sample dispatched, we are pleased to be initiating this concurrent
phase of work.”
Bulk Leach Production Runs
TP7 bulk leach runs have utilised drill core GM12C1
from the LT seam of the Alpha Project. The
core sample is pulverised and sieved to a P80 of 200µm, with oversize material removed to
ensure particle size consistency. A homogeneous sample blend was prepared and used across
all bulk production runs to maintain repeatability and feed product consistency.
Each production run employs a charge of approximately 400g (dry basis) of GM12C material,
together with ~10g (dry basis) of Zinc Acetate (Zn(CH3COO)2) as catalyst and ~1,200 grams of
toluene as solvent. The system is pressurised with hydrogen to 90 bar (cold), and the reaction
conducted in the leach reactor under controlled operating conditions. An induction heating
system is used to achieve the desired temperature ramp rate.
For the initial production runs, a retention time of 60 minutes at target conditions was
maintained. These runs achieved consistent temperature and pressure profiles, with a reaction
temperature of approximately 400°C and a reaction pressure of approximately 26MPa. These
operating parameters were aligned with those established during TP7 Milestone 2 and the
previous Test Program 6 (TP6) work program.
Temperature and pressure profiles for the first four production runs are shown in Figures 1 and
2. Figure 1 highlights the consistent and repeatable operating temperatures achieved by the
Monash processing team. Figure 2 illustrates varying pressure profiles for the same process
conditions, highlighting the opportunity for process optimisation.
Figure 1 – Temperature ramp profile and 1 hour of retention time at target rates (first four
production runs)
1 Refer to ASX Announcement Key milestone achieved with Alpha Project TP7 – bulk sample production to commence released
16 December 2025.
Greenvale Energy Limited ASX Release
Page | 3
Figure 2 – Pressure ramp profile and 1 hour of retention time at target rates (first four
production runs)
Test Program 7 – Scaling and Optimisation
As previously announced2
, the key findings from Greenvale’s prior test programs had determined
the optimal process conditions and controls to maximise product yields from Alpha’s torbanite.
Specific controls include temperature ramp profile, reaction pressure, temperature cooling
profile, optimal catalysts and optimal carriers.
TP7 was design to repeat the performance of TP6 but at a significantly increased operating scale
(from 100ml reactor to 4l reactor) in order to both test scalability and also efficiently derive a bulk
sample. This scale increase required custom designed and procured equipment and the
validation of TP6 operating parameters. TP6 optimal conditions were achieved in TP7 Milestone
2, and the production of a bulk sample began in December 20253
.
Weekly process reviews between the Company and Monash University identified potential
optimisation opportunities. For the most recent production runs (runs five and six), the system
was pressured with hydrogen at 94 bar (cold) with an increase of 4 bar compared to runs 1-4,
which also saw a reduced retention time from 60 mins to 30 mins. Under these conditions, an
overall recovery of 99wt% with a gas yield of approximately 1.5wt% at dry basis has been
achieved. The retention time reduction by a material factor of 50% is a significant gain for the
project as it has immediate impacts on the ability to reduce the size of a pressure leach reactor
at pilot/commercial scale – assessed at this stage as delivering a potential CAPEX and OPEX cost
saving.
Further optimisation opportunities identified included the need for a change in impeller design in
the reactor to improve mixing consistency during the pressure leach process. A new impeller was
designed, manufactured and installed into the Monash reactor and has been utilised from
production run four onwards. An immediate improvement was observed with reduced solid
residue in the reactor – the improved flow dynamics of the material giving confidence that the
hydrometallurgical process will continue to scale up.
2
Refer to ASX Announcement TP6 delivers positive results with highest product conversion to date and the introduction of catalysts
improving viscosity of the final product released 8 April 2025.
3
Refer to ASX Announcement Key milestone achieved with Alpha Project TP7 – bulk sample production to commence released
16 December 2025.
Greenvale Energy Limited ASX Release
Page | 4
The net result of optimisation efforts are currently delivering high overall conversion (~99wt%)
with a 32% yield in primary product. The remaining test runs will replicate the optimised
processing parameters to maximise the bulk sample production yield and thoroughly validate
the operating parameters. The processing yields and recovery for each run are shown in Table 1.
Figure 3 – Upgraded Reactor Impeller design to achieve mixing consistency
Table 1 – Bulk sample production - process conditions and yields
Production
Run
Sample Catalyst Solvent
Peak
Temperature
(o
C)
Retention
Time
(hours)
Conversion
yield (Wt%)
Toluene
Soluble yield
(Wt%)
Toluene
Insoluble
yield (Wt%)
1
GM12C Zn(CH3COO)2 Toluene
400 1 99.5 40.7 57.8
2 400 1 97.2 28.2 67.2
3 400 1 98.2 27.3 72.7
4 400 1 95 27.6 72.4
5 410 0.5 99 32 65
6 410 0.5 99 32 65
Notes:
Conversion yield includes gas produced during reaction
Production run 1 derived much higher yields and a different product characteristics and has been deemed an outlier and not
representative.
Technix Preliminary Assessment
Technix of New Zealand has been engaged to conduct a preliminary assessment of the material
produced thus far. A sample has been dispatched to Technix to allow for preliminary
characterisation and assessment of further beneficiation requirements to derive a final product.
Future Work
Following the successful optimisation of bulk pressure leach conditions in production runs five
and six, TP7 will continue to replicate the optimal conditions for the remaining production runs
(seven, eight and nine). Consideration of additional production runs is being discussed and will
be guided by the preliminary assessment work undertaken by Technix.
The Company expects a preliminary assessment by Technix to be undertaken over the next three
weeks with a decision to be made on next steps in mid-March. Data generated from TP7 will be
used to inform future technical and economic assessments of the Alpha Torbanite Project.
Greenvale Energy Limited ASX Release
Page | 5
Authorised for release
This announcement has been approved for release by the Board of Directors.
For further information please contact
Alex Cheeseman Nicholas Read
CEO Read Corporate
E: admin@greenvaleenergy.com.au E: nicholas@readcorporate.com.au
M: +61(0)419 929 046
About Greenvale Energy Limited
Greenvale is an ASX-listed exploration company, committed to building a portfolio of Uranium Resources
in Tier-1 mining jurisdictions. The Company is building a large land holding in the world-class Pine Creek
region of the Northern Territory, and also owns the advanced, high-grade Oasis Uranium Project in
Queensland. The Company has additional new-energy/forward facing projects all aligned with the global
need for reliable, sustainable, low-emissions energy and supply chains. The Company believes the best
way to create long-term shareholder value is by investing in exploration, to make discoveries and grow its
resource-base.
Forward Looking Statements
This announcement may contain certain forward-looking statements and projections. Such forward
looking statements/projections are estimates for discussion purposes only and should not be relied upon.
Forward looking statements/projections are inherently uncertain and may therefore differ materially from
results ultimately achieved. The Company does not make any representations and provides no warranties
concerning the accuracy of the projections and disclaims any obligation to update or revise any forward-
looking statements/projects based on new information, future events or otherwise except to the extent
required by applicable laws.While the information contained in this report has been prepared in good faith,
neither the Company nor any of its directors, officers, agents, employees or advisors give any
representation or warranty, express or implied, as to the fairness, accuracy, completeness or correctness
of the information, opinions and conclusions contained in this announcement.