Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX Release 27 January 2026
Interactive Investor Hub - Engage directly with the Company through our Investor hub, you can ask questions, review
comments and get direct access to Management – follow the link greenvaleenergy.com.au/announcements
Greenvale Energy Limited ABN 54000743555 W: greenvaleenergy.com E: admin@greenvaleenergy.com.au
WA Office: Level 1, 1 Alvan St, Subiaco, 6008 QLD Office: Suite 5-Level 12, 10 Market St, Brisbane 4000 Page | 1
DECEMBER 2025 QUARTERLY ACTIVITIES REPORT
Key strategic and operational outcomes achieved across the portfolio,
underpinning strong potential for uranium resource definition and growth
Greenvale Energy Limited ASX: GRV (“Greenvale” or “the Company”) is pleased to report on its
activities for the quarter ended 31 December 2025 (“the Quarter”), during which the Company
advanced its uranium-focused growth strategy across a portfolio of assets.
During the Quarter, Greenvale prioritised ongoing exploration at the Oasis Uranium Project, with
initial results reinforcing the scale potential of the Oasis deposit and surrounding regional
targets.
In parallel, the Company progressed the Test Program 7 for the Alpha Torbanite Project, including
the commencement of individual production runs designed to generate a bulk sample for future
testing and certification.
Highlights
High-grade chemical assays from recently completed drilling have significantly
expanded the geological model at the Oasis Uranium Project. The mineralisation
remains open along strike and at depth, providing further growth potential.
Follow-up field work at Oasis identified near‑surface mineralised extensions and a
possible second northeast‑trending structure, increasing confidence in the scale
potential of the deposit. Detailed results from the Oasis trenching program are
pending.
Test Program 7 on the Alpha Torbanite Project progressed through a milestone-gate
with the successful commissioning of specialist processing equipment and the
commencement of bulk sample production.
Farm-in and JV executed to unlock the Millungera Basin geothermal asset value
through a strategic partnership with a subsidiary of Sunrise Energy Metals (ASX: SRL),
with up to A$5 million in partner‑funded expenditure.
Greenvale strengthened its balance sheet, raising ~A$1.9 million through a
Placement and an oversubscribed Share Purchase Plan, enhancing funding
capability for ongoing uranium exploration.
A strengthened technical foundation, funded exploration pipeline, and multiple
uranium-focused exploration opportunities set Greenvale ready for a value-driven
start to 2026.
Greenvale Energy Limited ASX Release
Page | 2
Greenvale also completed a successful capital raising via a Placement and Share Purchase Plan
(SPP), strengthening the balance sheet and funding the Company’s immediate work priorities in
2026.
Operational Activities
Oasis Uranium Project (100%) – EPM 27565, Queensland
During the Quarter, the Company continued to receive chemical assay data and results from the
drilling program completed in the previous quarter. The results confirmed the presence of high-
grade uranium mineralisation and demonstrated that the Oasis system remains open both along
strike and at depth.
Initial results delivered high-grade mineralisation and highlighted significant depth extensions to
the Oasis mineralisation envelopes. Importantly, assay results identified the potential existence
of a second, parallel, north–south striking mineralised structure that may represent a splay
coming off, but separate to, the main Oasis Shear.
Final chemical assays were received and released in December 2025, with the completed
program confirming consistent, high-grade uranium mineralisation across the majority of drill-
holes, including standout intercepts exceeding 1,000 ppm U₃O₈. A summary of highlight drilling
results is provided in Table 1.
These results are shown in Figures 1 and 2, with Figure 2 clearly highlighting the significantly
expanded Oasis mineralised envelope. The mineralisation remains open, both along-strike and
down-dip of the known Oasis Shear.
Table 1 – Standout Assays from the Oasis Uranium Project 2025 Drilling
Hole ID
Chemical Assay Intercepts
Comments
From (m) To (m) Thickness (m) Avg. U (ppm) Avg. U3O8 (ppm)
25GRV001 40 53 13 471.57 519.01
incl. 1m @ 1,637ppm U3O8from
40m; and
2m @ 1,273ppm U3O8 from 46m
25GRV002 84 92 8 1,805.85 2,124.70
incl. 5m @ 3,263ppm U3O8
from 84m, and
1m @ 6,929ppm U3O8 from
86m.
25GRV003 279 284.5 5.5 612.23 721.94
incl. 2m @ 1,188ppm U3O8 from
279m; and
0.5m @ 1,838ppm U3O8 from
283m
25GRV004
62 64 2 486 573
incl. 1m @ 900ppm U3O8 from
63m
76.25 80 3.75 849.08 1,001.23
incl. 1m @ 2,423ppm U3O8 from
78m; and
0.25m @ 2,729ppm U3O8 from
79.5m
25GRV008 109.5 118 8.5 480.39 566.48
incl. 3.0m @ 1,276ppm U3O8
from 113.0m
25GRV009 64.5 66.5 2 1,042.91 1,229.80
incl. 1m @ 2,061ppm U3O8 from
65.5m
25GRV010 84 88.5 4.5 679.64 801.43
incl. 1.5m @ 1,685ppm U3O8
from 86.5m
25GRV012 249 250 1 363.62 428.78
Greenvale Energy Limited ASX Release
Page | 3
Figure 1 – 2025 drilling at Oasis, showing the expanded mineralised envelope. The white
line represents the line of the long-section shown in Figure 2 and the interpreted plane of
the mineralised shear.
Greenvale Energy Limited ASX Release
Page | 4
Figure 2 – Updated long-section of the Oasis Uranium Deposit, looking west, highlighting
the successful expansion of the mineralisation envelope and confirming mineralisation
remains open.
High-Resolution Geophysics and Structural Refinement
During the Quarter, Greenvale completed a close-spaced ground magnetic survey over the Oasis
deposit. This high-resolution dataset revealed a complex network of cross-cutting north–south,
northwest–southeast and northeast–southwest faults. This detail was not identified from
previous, lower-resolution surveys and therefore greatly enhanced the geological understanding
of the Oasis deposit.
The newly-identified structures are interpreted to exert a primary control on uranium
mineralisation at Oasis and provide critical context for integrating drilling, geochemistry and
trenching results into a coherent geological model.
Trenching Program and Near-Surface Controls
In order to test extensions and newly-interpreted structures, Greenvale completed an extensive
trenching program during the Quarter. Six trenches totalling approximately 775 metres were
excavated, mapped and sampled. A flexible, data-driven approach was adopted, using real-time
scintillometer readings to optimise trench placement. This strategy led to the identification of a
second, northeast-trending mineralised structure, with scintillometer readings locally exceeding
Greenvale Energy Limited ASX Release
Page | 5
2,000 cps. Figure 3 shows the location of all trenches, relative to the 12-hole drilling program
completed in the previous quarter.
Figure 3 – Oasis deposit final trench plan.
The trenching program was a cost-effective way to obtain sub-surface geological, geochemical
and structural data. The program was completed under strict operating and rehabilitation
controls agreed with the local Pastoralists. At the conclusion of the trenching program, all sites
were rehabilitated, including legacy trenches dug by historical exploration companies, along with
all drill pads and sumps from the Company’s 2025 drilling program.
Greenvale Energy Limited ASX Release
Page | 6
Figure 4 – Collection of samples from trench 25GRVT02.
The trenches were deliberately designed to test both areas of potential strike extensions to Oasis
and lateral targets identified from the high-resolution ground magnetics and coincident Sentinel-
2 multispectral gas anomalies.
Field mapping observed background radiometric values of less than 350 counts per second (cps)
to the west of the deposit, increasing eastwards with readings exceeding 2,000 cps in certain
areas. The drop in surface scintillometer counts in the western areas supports the model of a
steep, westerly-dipping, mineralised structure, which matched field observations during drilling
and corresponding structural data from the drill core.
The second, potentially mineralised north-northeast (NNE) to northeast (NE) trending structure
coincides with a linear, NNE-striking, demagnetised zone on the north-western edge of a NE-
trending, highly magnetic feature. Based on the pattern of high scintillometer readings on the
eastern sides of trenches 25GRVT03 and 25GRVT04, trenches 25GRVT05 and 25GRVT06 were
repositioned to further explore this potential structure.
Maximum scintillometer readings within both trenches exceeded 700 cps, along strike and to the
north of the >2,000 cps readings recorded in trench 25GRVT04. On excavation, these anomalies
were observed to occur within megacrystic, K-feldspar-rich granites and the same biotite-
chlorite schists known to host uranium mineralisation at Oasis.
A total of 449 trench samples were submitted to Intertek for analysis, with results pending.
Greenvale Energy Limited ASX Release
Page | 7
Regional Target Development
Complementing the field work completed during the Quarter, the Company also undertook a
comprehensive prospectivity assessment across the entire landholding of EPM 27565. The aim
of the prospectivity analysis was to evaluate growth potential beyond the known Oasis deposit.
This work integrated historical airborne radiometric, reprocessed ground magnetics, new rock-
chip geochemistry and structural interpretation.
Nine priority uranium anomalies were confirmed through ground-truthing during the period June–
July 2025, with rock-chip sampling returning anomalous uranium values of up to 187ppm U.
Structural analysis identified consistent north–south and northeast–southwest mineralisation
trends, mirroring orientations observed at the main Oasis deposit.
These results support the interpretation that Oasis may form part of a broader intrusive-
related uranium system with district-scale upside.
To further refine this model, Greenvale acquired Sentinel-2 multispectral data. To date, the
interpretation of this data has been limited to the immediate area over/around the Oasis deposit,
however the interpretation has identified coincident anomalies in helium, radon, hydrogen and
alteration minerals aligned with mapped structures.
The Company is currently interpreting the Sentinel-2 data for the broader/regional targets and
will report the results as available. Ultimately, these datasets have collectively underpinned the
selection of new targets and will inform the next phase of field work to be completed at the Oasis
Project.
Geological mapping confirmed the presence of uranium mineralisation associated with biotite–
chlorite schists and megacrystic granites consistent with drilling results. All trenches, drill pads
and sumps were fully rehabilitated following the completion of fieldwork, concluding
Greenvale’s first uranium field season in compliance with best-practice environmental
standards.
Elkedra-Henbury Uranium Project (80%) – EL33756, EL33637 and EL33638, Northern Territory
During the Quarter, the Company streamlined its exploration approach to its NT projects by
grouping the Elkedra and Henbury Projects into one. This approach seeks to ensure more
efficient engagement with local stakeholders, project reporting and efficiency of exploration
programs as the two projects are relatively closely located and at similar stages. Sentinel-2
multispectral data has been acquired for the combined Project and is currently being interpreted.
Douglas River Uranium Project (80%) – EL33670, ELA33900, ELA34114 and ELA34157,
Northern Territory
The Douglas River Uranium Project is situated within the world-class mineral province of the Pine
Creek Orogen. This province hosts multiple high-grade uranium resources, such as Thunderball
(JORC 2004, 1.05Mt of uranium oxide, for 1.69Mlbs @ 924ppm U3O8); Cleo (6.8Mt of uranium
oxide for 5.2Mlbs @ 345ppm U3O8); and Jabiluka (137Kt of uranium oxide @ 0.55% U3O8); and
former/historical uranium mines such as Ranger (produced 132Kt U3O8 @ 0.23% U3O8); Rum
Jungle (produced 3Kt @ 0.4% U3O8) and Coronation Hill (El Sherana mine, produced 411t @
0.64% U3O8).
Greenvale Energy Limited ASX Release
Page | 8
The Douglas River Project sits less than 8km due south of the Thunderball deposit (refer to Figure
5), hosted in a geological environment that is also cut by multiple, steep-angled faults connected
to the Hayes Creek Fault Zone, a key structural control on the formation of the major uranium
deposits in this part of the province.
The tenement application process (to convert ELA to EL) has involved ongoing Native Title
consultations with the Northern Land Council (NLC) and, in particular, the communities of the
Wagiman, Waral and Jawoyn Peoples. Greenvale has committed to a process of dialogue through
the National Native Title Tribunal (NNTT) process, which was a key focus for the Quarter.
The Tribunal process is ongoing, and the Company plans to initiate meetings with the key
stakeholders in Q1 CY2026.
Figure 5 – Douglas River Project area and proximal uranium deposits.
Greenvale Energy Limited ASX Release
Page | 9
Alpha Torbanite Project (100%) – MDL 330 and EPM27718, Queensland
During the Quarter, the Company advanced technical development activities at the Alpha
Torbanite Project through Test Program 7 (TP7), which is being undertaken in collaboration with
Monash University. While procurement delays were encountered earlier in the year, the
Company reported in early December the successful completion of the second milestone of TP7,
being the commissioning of specialist equipment and initial test runs. This milestone increased
processing capacity from the 100 mL reactor utilised in TP6 to a 4-litre reactor in TP7,
representing a material scale-up of laboratory capability.
Following completion of this milestone, the next phase of work commenced immediately,
comprising the production of bulk samples. Under the current contract, Monash University is
expected to undertake a series of production runs from mid-December through to late
February/early March 2026. Each production run will produce high-asphaltene, bituminous
material from torbanite, under controlled laboratory conditions.
The Company, together with its Engineering Consultant and Monash University, has established
a weekly review process during the bulk production phase, the weekly review process is
principally to evaluate results from each production run and identify potential areas for
incremental optimisation. Data generated from this phase of work, including power inputs,
catalyst and carrier consumption, retention times, mechanical agitation, product yields and
product characteristics, will be used to inform future technical and economic assessments of
the Alpha Torbanite Project.
Millungera Basin Geothermal Project (100%) – EPG 2023, EPG 2024 and EPG 2025 –
Queensland
No work was undertaken on the Millungera Basin tenements during the Quarter.
During the Quarter, the Company was granted EPG2023, EPG2024 and EPG2025, each with an
initial term of five years, expiring in 2030 (refer to Appendix 1 for details).
During the Quarter, the Company entered into a Farm-in agreement for the Millungera Basin
Geothermal Project with SRL Hot Rocks Pty Ltd (“SRL-HR”), a subsidiary of Sunrise Energy Metals
(ASX: SRL). Under the agreement, SRL-HR will sole fund up to $5 million in exploration and
development to earn an 80% interest in the project.
This partnership allows Greenvale to retain exposure to a highly prospective geothermal asset
while prioritising capital and management focus on its uranium portfolio.
The Millungera Basin is recognised as one of Australia’s most prospective geothermal regions,
with substantial estimated stored thermal energy. The agreement, supported by granted
geothermal exploration permits and nativetitle access arrangements, positions the project ready
for exploration and project development efforts.
Longreach Geothermal Project (100%) – EPG 2029 Queensland
No work was undertaken on EPG 2029 during the Quarter.
Schedule of Tenements
The Company’s tenement schedule is provided in Appendix 1.
Greenvale Energy Limited ASX Release
Page | 10
ESG and Sustainability
During the Quarter, Greenvale continued to engage with a number of the Traditional Owners
across the Company’s uranium exploration portfolio, along with the landowners/pastoralists at
the Oasis Uranium Project. The Company maintained regular dialogue with the Queensland
Department of Natural Resources and Mines, Manufacturing and Regional and Rural
Development regarding the progression of its Geothermal Exploration Permits, leading to the
successful grant of the remaining EPGs.
During the Quarter, Greenvale was also proud to provide sponsorship to the Greenvale Horse
Sports Day, an annual event that provides a sense of community and friendly competition for the
families that live and work in the Greenvale-township/Charters Towers regional area.
Finance
Funding and Balance Sheet Strengthening
To support the ongoing investment in exploration, Greenvale secured approximately AUD $1.05
million through a Placement to sophisticated investors in early November 2025. This was
followed by a Share Purchase Plan, which closed significantly oversubscribed, raising
approximately AUD $856,000.
Together, these raisings materially strengthened the Company’s balance sheet and ensured
funding continuity for ongoing uranium exploration in Queensland and the Northern Territory. The
strong shareholder support reflected growing confidence in the Oasis discovery and broader
uranium market fundamentals.
Cash Position
The Company held cash and cash equivalents of approximately AUD$2.8 million (unaudited) at
31 December 2025.
Exploration Expenditure
During the Quarter, the Company invested approximately AUD$805,000 in exploration and
evaluation activities across its project portfolio. Approximately 87% was focused on uranium
exploration, with expenditure principally allocated to drilling, drilling-related costs and trenching
at the Oasis Uranium Project.
R&D Expenditure and Tax Rebate
During the Quarter, the Company lodged its 2024/25 R&D tax claim for AUD$359,000 and expects
to receive these funds in Q1 CY2026.
Other Disclosure
As disclosed under item 6 in Appendix 5B, the Company made payments to related parties for a
total consideration of A$68,000. This consideration relates to payments attributable to routine
Director fees including statutory superannuation.
Greenvale Energy Limited ASX Release
Page | 11
The Company maintains a Director-provided finance facility, which remains undrawn. The
Company therefore ended the Quarter with zero debt.
The Company confirms that there was no mine production nor mine development activities for
the Quarter.
Corporate Activity
During the Quarter, the Company continued its active shareholder and investor engagement,
presenting at the Noosa Mining Conference and releasing a number of recorded interviews
through its Investor-Hub/website and social medial channels.
In October 2025, the Company hosted an Investor & Shareholder Webinar, facilitated by Read
Corporate, providing both a company update as well as the opportunity for a live Q&A session
with the Company’s CEO.
The Company also engaged Peloton Shareholder Service to support its SPP outreach. The
outreach provided a significant update of shareholder contact details which have since been
added to Greenvale’s Investor Hub for email outreach. Greenvale encourages all shareholders
and potential investors to register their details on the Greenvale Investor Hub/website to be kept
fully informed of the Company’s progress and activities.
AGM and EGM
The Company held its Annual General Meeting on 10 November 2025 in Brisbane, with all
resolutions passed.
The Company advised on 15 December 2025 of a General Meeting to be held on 19 January 2026.
The key resolutions for the meeting pertained to the ratification and issue of shares and options
linked to the Placement and SPP completed during the quarter.
Capital Structure
At the end of the Quarter, the Company had 588,235,588 shares on issue, and 23,000,000
performance rights on issue.
Key ASX Announcements during the Quarter
Oasis Uranium Prospectivity Report dated 2 October 2025
Next Phase of exploration underway at Oasis dated 21 October 2025
Significant Expansion to Oasis Geological Model dated 29 October 2025
Successful Placement and launch of SPP dated 6 November 2025
Results of meeting (AGM) dated 10 November 2025
Further high-grade assays and second structure dated 12 November 2025
Noosa Mining Investor Conference Presentation dated 13 November 2025
Trenching program completed dated 25 November 2025
Geothermal Farm-in and JV dated 26 November 2025
Oversubscribed SPP dated 4 December 2025
Key Milestone achieved with Test Program 7 dated 16 December 2025
Final assays from Oasis drilling dated 18 December 2025
Greenvale Energy Limited ASX Release
Page | 12
All announcements are available at: greenvaleenergy.com.au/announcements
Authorised for release
This announcement has been approved for release by the Board of Directors.
For further information please contact
Alex Cheeseman Nicholas Read
CEO Read Corporate
E: admin@greenvaleenergy.com.au E: nicholas@readcorporate.com.au
M: +61(0)419 929 046
About Greenvale Energy Limited Greenvale is an ASX-listed exploration company with a portfolio of projects that will
support a sustainable, low-carbon future. The Company has greenfield, uranium exploration projects in the Northern
Territory, the high-grade Oasis Uranium project in Queensland and the Alpha Torbanite project in Queensland. The
Company believes the best way to create long-term shareholder value is by investing in exploration, to make
discoveries and grow its resource-base.
Compliance Statement This announcement contains information on the Oasis, Douglas River, Henbury and Alpha
projects, extracted from ASX market announcement dated 1 October 2025, 21 October 2025, 29 October 2025, 12
November 2025, 25 November 2025 and 16 December 2025 reported in accordance with the 2012 JORC code and
available for viewing at greenvaleenergy.com.au/announcements. The Company confirms that it is not aware of any
new information or data that materially affects the information included in any original announcement and that all
material assumptions and technical parameters underpinning the estimates in the original market announcement
continue to apply and have not materially changed.
Forward Looking Statements This announcement may contain certain forward-looking statements and projections.
Such forward looking statements/projections are estimates for discussion purposes only and should not be relied
upon. Forward looking statements/projections are inherently uncertain and may therefore differ materially from
results ultimately achieved. The Company does not make any representations and provides no warranties concerning
the accuracy of the projections and disclaims any obligation to update or revise any forward-looking
statements/projects based on new information, future events or otherwise except to the extent required by applicable
laws. While the information contained in this report has been prepared in good faith, neither the Company nor any of
its directors, officers, agents, employees or advisors give any representation or warranty, express or implied, as to the
fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
announcement.
Greenvale Energy Limited ASX Release
Page | 13
Appendix 1 – Schedule of Tenements at 31 December 2025
Alpha Project, Queensland
Tenement Owned by Status
Acquired
Interest during
Quarter
Disposed
Interest during
Quarter
Interest at end of
Quarter
MDL 330 Alpha Resources Pty Ltd Current to 31 January 2027 - - 100%
EPM 27718 Alpha Resources Pty Ltd Renewal submitted Nov 2025 - - 100%
Geothermal Projects, Queensland
Tenement Owned by Status
Acquired
Interest during
Quarter
Disposed
Interest during
Quarter
Interest at end of
Quarter
EPG 2023 Greenvale Energy Ltd Current to 18 September 2030 - - 100%
EPG 2024 Greenvale Energy Ltd Current to 11 September 2030 - - 100%
EPG 2025 Greenvale Energy Ltd Current to 5 November 2030 - - 100%
EPG 2029 Greenvale Energy Ltd Current to 7 July 2030 - - 100%
Uranium Project, Queensland
Tenement Owned by Status
Acquired
Interest during
Quarter
Disposed
Interest during
Quarter
Interest at end of
Quarter
EPM 27565 Greenvale Utilities Pty Ltd Current to 23 February 2026 - - 100%
Tenement Applicant Status
EPM 29203 Greenvale Utilities Pty Ltd Under Application - - 100%
Uranium Projects, Northern Territory
The Company holds an exclusive right to acquire up to 80% of the legal and beneficial interest in the Northern Territory Uranium
Projects under is Farm-in Agreement with Gempart (NT) Pty Ltd
Tenement Owned by Status
Acquired
Interest during
Quarter
Disposed
Interest during
Quarter
Interest at end of
Quarter
EL 33670 Greenvale Utilities Pty Ltd Current to 19 May 2030 - - 80%
EL 33756 Greenvale Utilities Pty Ltd Current to 26 September 2030 - - 80%
EL 33637 Greenvale Utilities Pty Ltd Current to 14 April 2030 - - 80%
EL 33638 Greenvale Utilities Pty Ltd Current to 14 April 2030 - - 80%
Tenement Applicant Status
ELA 33900 Greenvale Utilities Pty Ltd Under Application - - 80%
ELA 34157 Greenvale Utilities Pty Ltd Under Application - - 80%
ELA 34114 Greenvale Utilities Pty Ltd Under Application - - 80%
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Greenvale Energy Ltd
ABN Quarter ended (“current quarter”)
54 000 743 555 31 December 2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date (6
months)
$A’000
1. Cash flows from operating activities
1.1 Receipts from customers
1.2 Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs
(e) administration and corporate costs (263) (665)
1.3 Dividends received (see note 3)
1.4 Interest received 6 19
1.5 Interest and other costs of finance paid
1.6 Income taxes paid
1.7 Government grants and tax incentives
1.8 Other (provide details if material)
1.9 Net cash from / (used in) operating activities (257) (646)
2. Cash flows from investing activities
2.1 Payments to acquire or for:
(a) entities
(b) tenements - (47)
(c) property, plant and equipment
(d) exploration & evaluation (805) (1,499)
(e) investments
(f) other non-current assets
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Consolidated statement of cash flows Current quarter
$A’000
Year to date (6
months)
$A’000
2.2 Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
2.3 Cash flows from loans to other entities
2.4 Dividends received (see note 3)
2.5 Other (provide details if material)
2.6 Net cash from / (used in) investing activities (805) (1,545)
3. Cash flows from financing activities
1,897
(44)
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
1,897
3.2 Proceeds from issue of convertible debt
securities
3.3 Proceeds from exercise of options
3.4 Transaction costs related to issues of equity
securities or convertible debt securities (45)
3.5 Proceeds from borrowings
3.6 Repayment of borrowings
3.7 Transaction costs related to loans and
borrowings
3.8 Dividends paid
3.9 Other (provide details if material)
3.10 Net cash from / (used in) financing activities 1,853 1,852
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
989 2,118
4.2 Net cash from / (used in) operating activities
(item 1.9 above)
(257) (646)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(805) (1,545)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
1,853 1.852
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Consolidated statement of cash flows Current quarter
$A’000
Year to date (6
months)
$A’000
4.5 Effect of movement in exchange rates on cash
held
- -
4.6 Cash and cash equivalents at end of period 1,779 1,779
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 379 589
5.2 Call deposits 1,400 400
5.3 Bank overdrafts
5.4 Other (provide details)
5.5 Cash and cash equivalents at end of quarter
(should equal item 4.6 above)
1,779 989
6. Payments to related parties of the entity and their associates Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their associates
included in item 1
68
6.2 Aggregate amount of payments to related parties and their associates
included in item 2
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an explanation
for, such payments.
More information concerning the breakdown of the above payments to directors and their related parties can be
found within the accompanying Quarterly Activities Report.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an