ASX ANNOUNCEMENT
30 October 2024
SEPTEMBER 2024 QUARTERLY REPORT
ALPHA PROJECT TEST PROGRAM 5 NEARING COMPLETION
AND EXCITING HELIUM ACQUISITION IN CENTRAL AUSTRALIA
Highlights
Douglas River Uranium Project, NT
• Binding Heads of Agreement to acquire an initial 80% interest in the Douglas River Uranium
Project, located 200km south of Darwin in the Pine Creek Mineral Field.
• The project is highly prospective for a suite of elements including uranium, tin and gold.
Alpha Torbanite Project, QLD (100%-owned):
• The University of Jordan, which completed the highly successful Test Program 3, has been
re-engaged to commence Test Program 5. Test Program 5 will aim to resolve issues raised
by Technix in terms of delivering a premium-grade C170 product from the Alpha Project.
West Walker Helium Project, NT (75%-owned):
• Application to extend the permit for the Company’s current Year 3 work commitments at
EP145 by six months was approved by the Northern Territory Department of Industry,
Tourism & Trade, providing additional time to finalise regulatory approvals.
Corporate:
• Shareholding in Astute Metals NL (ASX: ASE) sold down for $1.530 million.
• $0.85 million R&D Tax Incentive Rebate received for the 2023 financial year.
• Formal notification received from Astute Metals regarding the exercise of a call option in
relation to Greenvale’s 2% royalty over the Georgina Basin Project.
• Peter Harding-Smith appointed as Chief Financial Officer and Company Secretary.
Projects
Douglas River Uranium Project
Greenvale further enhanced its Australian energy portfolio during the Quarter with the
acquisition of a highly prospective sandstone-hosted uranium exploration project in the prolific
Pine Creek Mineral Field in the Northern Territory.
Greenvale has entered into an acquisition agreement with Gempart (NT) Pty Ltd over EL33670
and ELA33900 (Figure 1), comprising the Douglas River Uranium Project, located in the Daly
Basin on the south-western portion of the Pine Creek Mineral Field.
GREENVALE
ENERGY
LIMITED
1
Greenvale has secured the rights to obtain an immediate 80% interest in the two tenements,
Gempart (NT) Pty Ltd being free-carried through to a Definitive Feasibility Study (DFS).
Greenvale incurred a small upfront cost of approximately $20,000, payable to Gempart as
reimbursement of data acquisition costs to secure its 80% interest in the tenements.
Figure 1: Douglas Project Location Map
The Douglas Project is located about 200km south of Darwin in the Daly Basin on the southwestern side of the Pine Creek Mineral Field. The project area has been historically explored
for numerous minerals including uranium, gold, tin, base metals, REE’s and diamonds with
extensive anomalism defined from surface sampling (Figure 2).
The most recent exploration was that of United Uranium in 2012. It included a Tempest
airborne EM survey over the entire project area and a close-spaced (50m) airborne radiometric
survey over a well-defined geochemical anomaly in the eastern paleochannel.
United’s work defined significant paleochannels located on the eastern margin of the Project
area. Data reassessment commissioned by Greenvale using advanced interpretation software
highlighted palaeochannels on the eastern and western margins of the Project area (Figure 3).
Historical 400m line spaced airborne magnetics/radiometric survey by the NTGS had defined
multiple U/Th ratio anomalies which are concentrated within the eastern and western
paleochannels with two highly anomalous zones defined in the eastern paleochannel.
United followed up eastern paleochannel ground sampling with a close-spaced airborne
radiometric survey immediately over the south-eastern anomaly which defined a significant
drill target. United ceased work due to a downturn in the uranium market at that time. The
south-eastern anomaly is considered by Greenvale to be an immediate drill target.
The north-eastern uranium anomaly is defined by 400m line spacing radiometrics and requires
close-spaced (100m) airborne radiometrics to better define the anomaly prior to drilling.
Greenvale proposes to fly detailed airborne magnetics/radiometrics at 100 metre line spacing
over all interpreted palaeochannel target areas as a precursor to ground exploration.
GREENVALE
ENERGY
LIMITED
2
Figure 2: EL 33670 & ELA 33900 Historical surface sampling & exploration results
Figure 3: EL 33670 & ELA 33900 Interpreted palaeochannels and proposed Airborne surveys
GREENVALE
ENERGY
LIMITED
3
Key Terms of the agreement
The tenements vendor is Gempart (NT) Pty Ltd.
• Purchaser is Greenvale Utilities Pty Ltd, a 100% subsidiary of Greenvale Energy Ltd.
• Greenvale to earn an 80% project interest by completing a Definitive Feasibility Study.
The 80% interest is transferred to Greenvale upfront.
• There is no time limit on completing the DFS, Greenvale to maintain tenements in good
standing for duration of earn in period.
• Greenvale may withdraw at any time and the tenements will revert to Gempart.
• Once Greenvale has earned its 80% interest Gempart can opt to contribute pro rata to
maintain its 20% interest or 1. Negotiate to sell its interest to Greenvale 2. Convert its
20% interest to a 1.5% NSR.
Alpha Project, Queensland
Background
The Company’s 100%-owned Alpha Torbanite Project is located approximately 50km south of
the town of Alpha in Central Queensland. The Alpha torbanite deposit consists of two seams,
an upper seam of mostly lower-grade mineralisation with an average thickness of 1.12m and
a lower seam containing lenses of torbanite up to 1.9m thick. The Project has been subjected
to extensive exploration and laboratory testing since its initial discovery in 1939.
During 2019, SRK Consulting Pty Ltd (“SRK”) was engaged to reassess the project’s
commercialisation strategy. SRK’s report set out a potential new development strategy based
on the production of a diversified suite of value-added products. SRK noted that, in contrast
with typical oil shale deposits, the Alpha torbanite deposit is exceptionally high-grade,
containing up to 650 litres of hydrocarbons per tonne of torbanite, and can produce high-value
bitumen products.
The upper and lower bituminous shales also produce similar products, albeit at lower yields of
110-140 litres per tonne. Additionally, the torbanite and bituminous shales can deliver highquality value-added products through appropriate investment in processing infrastructure. SRK
was engaged to undertake a staged work program to assist in evaluating the project's
commercial viability.
Activities during the September Quarter
During the Quarter, Greenvale re-engaged the University of Jordan (UofJ) to undertake the
liquefaction Testwork Program 5 on samples from the Alpha Project.
The decision follows consultation with expert advisers and the University of Jordan following
the outcomes of the product identification and certification work completed by Technix,
Greenvale’s bituminous product advisor, during the June Quarter and consideration by the
Board of low-cost opportunities to pursue a potential forward pathway for the
commercialisation of the Alpha Project.
The University of Jordan is a world-class institution with significant expertise in
geotechnical/chemical engineering, liquefaction studies and bituminous products and
previously undertook the highly successful Test Program 3.
Test Program 5 is designed to examine the issues raised in Test Program 4 by Technix, whose
aim was to determine the potential of the Alpha Project to produce a premium-grade C170
GREENVALE
ENERGY
LIMITED
4
bitumen product.
Unfortunately, the analysis of bulk samples revealed that, while the shale extract from Alpha
could be used for manufacturing standard or modified types of bitumen, it did not meet the
stringent specifications required to deliver a premium C170 bitumen product.
The main issues identified were the viscosity of product and the lack of elasticity.
Test Program 5 is designed to be a small lab-scale trial using a blend of the three ply’s,
Cannelite L1, Torbanite LT and Cannelite L2 (L1, LT and L2). The aim is to take the blended
core samples, vary the reaction conditions of temperature and pressure to maximise the
asphaltene yield, and then using different catalysts to enhance the quality of the asphaltene
for its viscosity and penetration.
The viscosity and penetration tests then can be carried out by the UofJ on a small scale to
evaluate the product quality.
West Walker Helium Project, Northern Territory
Background
Greenvale Energy holds a 75% interest in EP145 in the Amadeus Basin. The Amadeus Basin
is considered one of the most prospective onshore areas in the Northern Territory for both
conventional and unconventional oil and gas and hosts the producing Mereenie and Palm
Valley fields.
The Basin has some of the highest concentrations of helium globally, as well as confirmed
hydrogen accumulations. Successful helium wells have been drilled along the margins of the
Amadeus Basin at Mt Kitty 1 and Magee 1. The existing pipeline infrastructure to the Australian
East Coast provides an opportunity for early commercialisation.
EP145 contains the West Walker anticline, which hosts Ordovician through to Neoproterozoic
stratigraphy with prospective targets at multiple levels over 30km in length. The significance of
the geology is its proximity to the nearby Mereenie oil and gas field, which produce from the
Ordovician Pacoota Sandstone unit.
Two wells have been drilled on the anticline. The first, West Walker-1, tested the western end
of the feature. Drilled on sparse seismic data in 1982, it flowed wet gas to the surface at a rate
of 3.5MMscf/d from the Pacoota Sandstone, the main producing reservoir in the Mereenie and
Palm Valley Fields. A follow-up well, Tent Hill-1, was drilled in 1984 to the south-east on the
same anticline. Oil was observed seeping from cores, but the well was not tested.
Reprocessing of vintage seismic data shows that both wells were drilled off-structure; West
Walker-1 was drilled downdip of the main closure, and Tent Hill-1 did not penetrate the target
sandstone within closure.
More recent technical work has highlighted the potential for helium and hydrogen in addition
to hydrocarbon resources. As a result, Mosman Oil & Gas reported the following "Best
Estimate" Prospective Resource Estimate for EP145 in October 2022: 440 billion cubic feet of
total gas, including an estimated 26.4 billion cubic feet of helium and 26.4 billion cubic feet of
hydrogen.
Activities during the September Quarter
During the Quarter, Greenvale received confirmation that its application to extend the permit
GREENVALE
ENERGY
LIMITED
5
for its current Year 3 work commitments at EP145 (the West Walker Helium Project) was
approved by the Northern Territory Department of Industry, Tourism & Trade.
Approval for the six-month extension provides the Company with additional time to complete
the permit work programme. Greenvale sought the extension due to potential delays in
obtaining the required environmental approvals for the planned Wild Horse 2D Seismic
Programme at the West Walker Project. The approval for the permit extension means that
Greenvale will now have until 21 February 2025 to complete the Year 3 Work Programme,
which includes:
•
•
•
•
Acquisition of 100km 2D seismic survey
Seismic data processing and interpretation
Identification of well locations
Detailed well planning and preparation.
Corporate Activities
Sale of Shareholding in Astute Metals
Greenvale sold its investment in Astute Metals NL (ASX: ASE) during the Quarter for $1.530
million. After the sale, Greenvale retains a 2.0% NSR over Astute’s Georgina IOCG Project
and is also entitled to a further milestone payment of 5 million fully paid ASE shares subject to
Astute achieving the milestones set out in the ASX release dated 29 January 2024.
R&D Tax Rebate
Greenvale received a $0.85 million R&D Tax Incentive Rebate during the Quarter for the 2023
financial year (Rebate). The Rebate relates to eligible R&D activities conducted on the
Company’s Alpha Torbanite Project in Queensland. The Australian Government’s R&D Tax
Incentive Program provides companies with a tax offset for eligible R&D activities.
Exercise of Call Option – Georgina Basin Project Royalty
Greenvale received formal notice from Astute Metals NL (ASX: ASE, “Astute”) on 30
September regarding the exercise of a call option in relation to the 2% royalty over the
Georgina Basin Project. The exercise of the Call Option by Astute is irrevocable.
In accordance with the terms of the Call Option Deed, executed on 28 November 2022, the
value of the Royalty is to be determined through an independent valuation. To this end, both
Greenvale and Astute have appointed SRK Australia to undertake the valuation process.
As per the Deed, Astute has the discretion to satisfy the Royalty consideration either through
a cash payment, or by issuing fully paid ordinary shares in Astute (“Shares”). Should Astute
opt for payment by way of Shares, the number of Shares issued will be calculated based on
Astute’s volume-weighted average price (VWAP) over the seven days preceding the exercise
of the Call Option (estimated to be $0.029 per share).
This transaction remains subject to the conclusion of the independent valuation and the
execution of the agreed-upon settlement terms.
The Company will provide further updates as they occur.
GREENVALE
ENERGY
LIMITED
6
Appointment of Chief Financial Officer and Company Secretary
Greenvale has appointed Peter Harding-Smith as Chief Financial Officer and Company
Secretary.
Mr Harding-Smith is a Chartered Accountant with extensive experience as a public company
CFO and Company Secretary, and is well versed in all aspects of company financial reporting,
corporate regulations and governance, M&A due diligence, capital raisings, initial public
offerings and company secretarial responsibilities.
He has served as CFO and/or Company Secretary of several Australian public companies,
most recently as CFO and Company Secretary for Litchfield Minerals Limited (ASX: LMS) and,
prior to that, for Orbis Gold Ltd (ASX: OBS), Metro Mining Limited (ASX: MMI) and several
other junior ASX-listed entities.
In addition to his qualifications as a Chartered Accountant, he is also a fellow of FINSIA and
the Governance Institute. Mr Harding-Smith will be the person responsible for Greenvale’s
communications with the ASX in relation to listing rule matters under Listing Rule 12.6.
He replaces Kurt Laney and Vince Fayad, who have stepped down from the joint Company
Secretary role. The Board would like to thank Kurt and Vince for their efforts in assisting the
Company over a significant period of time.
ASX Additional Information
The Company provides the following information pursuant to ASX Listing Rule requirements:
1. ASX Listing Rule 5.3.1:
Exploration and Evaluation Expenditure during the Quarter was $540,887. Full details
of exploration activity during the September 2024 Quarter are set out in this report.
Below is the breakdown of the expenditure incurred:
Table 1 Analysis of exploration expenditure
Property
Nature of expenses
Amount ($)
Uranium
Geophysical Assessment
88,580
Subtotal – Uranium Project
88,580
Alpha Testwork
352,870
Project Management & Engineering
43,815
Tenement Management
1,593
Subtotal – Alpha Project
398,278
Alpha Project
Geothermal Project
GREENVALE
ENERGY
LIMITED
7
Tenement Management
1,675
Subtotal – Geothermal Project
1,675
Project Management
23,940
Tenement Management
18,296
Engineering
17,648
Subtotal – Hydrogen and Helium Project
52,354
Hydrogen and Helium
Total Exploration costs
2.
ASX Listing Rule 5.3.2:
The Company confirms that there was no mine production and development activities
for the Quarter.
3.
ASX Listing Rule 5.3.5: Payment to related parties of the Company and their
associates during the quarter was $170,950 in cash.
The Company advises that this relates to remuneration of Directors only. Please see
the Remuneration Report in the Company’s Prospectus for further details on Directors’
Remuneration. Set out below is the following additional information in relation to the
cash flow statement:
Table 2: Director’s remuneration
Name of Director
Nature of Payment
Amount ($)
Neil Biddle
33,450
Elias (Leo) Khouri
Ongoing Director fees, including superannuation
entitlements
Ongoing Director fees
John Barr
Ongoing Director fees
20,000
Mark Turner
Ongoing Director fees, including superannuation
entitlements
Total Director Remuneration
87,500
30,000
170,950
Authorised for Release
This announcement and the accompanying Appendix 5B have been approved by the
Board for release.
GREENVALE
ENERGY
LIMITED
8
Contact
For further details, contact:
Mark Turner, CEO, 0459 519 999
Media Inquiries:
Nicholas Read – Read Corporate
Nicholas@readcorporate.com.au
Mobile: 0419 929 046
Tenements
In accordance with Listing Rule 5.3.3, Greenvale provides the following Information concerning
its exploration licences:
Tenement Details
Alpha Project, Queensland
Tenement
%age Ownership Owned by
MDL 330
100%
Alpha Resources Pty Ltd
EPM 27718
100%
Alpha Resources Pty Ltd
Geothermal Project, Queensland
Tenement
%age Ownership
Of Applicant
EPM 28265
100%
EPM 28266
100%
EPM 28487
100%
EPM 28488
100%
EPM 28489
100%
EPG 2019
100%
EPG 2020
100%
EPG 2021
100%
EPG 2022
100%
EPG 2023
100%
EPG 2024
100%
EPG 2025
100%
Status
Current to 31 January 2027
Current to 14 February 2026
Applicant
Status
Alpha Resources Pty Ltd
Alpha Resources Pty Ltd
Greenvale Energy Ltd
Greenvale Energy Ltd
Greenvale Energy Ltd
Alpha Resources Pty Ltd
Alpha Resources Pty Ltd
Alpha Resources Pty Ltd
Alpha Resources Pty Ltd
Greenvale Energy Ltd
Greenvale Energy Ltd
Greenvale Energy Ltd
Under Application
Under Application
Current to 29 August 2027
Current to 29 August 2027
Under Application
Under Application
Under Application
Withdrawn
Withdrawn
Under Application
Under Application
Under Application
Geothermal Project, Queensland
Tenement
%age Ownership Owned by
EP145
80%
Greenvale Gas Pty Ltd
Status
Current to 21 August 2026
•
Mining tenements acquired during the quarter and their location: Nil.
•
Mining tenements disposed during the quarter and their location: Nil.
•
The beneficial percentage interests held in farm-in or farm-out agreements at the end of the quarter:
At the end of the quarter, the Company holds an exclusive right to acquire up to 80% of the legal
and beneficial interest in the exploration licence EP145 (owned by Mosman Oil & Gas), located in
the Northern Territory.
•
The beneficial percentage interests in farm-in or farm-out agreements acquired or disposed of
during the quarter: During the quarter, the Company acquired the exclusive right to acquire up to
80% of the legal and beneficial interest in the exploration licence EP145 (owned by Mosman Oil &
Gas), located in the Northern Territory.
GREENVALE
ENERGY
LIMITED
9
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Greenvale Energy Ltd
ABN
Quarter ended (“current quarter”)
54 000 743 555
30 September 2024
Consolidated statement of cash flows
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Current quarter
$A’000
Year to date (6
months)
$A’000
(393)
(393)
6
6
851
851
464
464
(541)
(541)
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs
(e) administration and corporate costs
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Government grants and tax incentives
1.8
Other (provide details if material)
1.9
Net cash from / (used in) operating activities
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) exploration & evaluation
(e) investments
(f)
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (6
months)
$A’000
1,525
1,525
984
984
Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (provide details if material)
2.6
Net cash from / (used in) investing activities
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
3.2
Proceeds from issue of convertible debt
securities
3.3
Proceeds from exercise of options
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
3.5
Proceeds from borrowings
-
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (provide details if material)
3.10
Net cash from / (used in) financing activities
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
-
-
Cash and cash equivalents at beginning of
period
1,524
1,524
4.2
Net cash from / (used in) operating activities
(item 1.9 above)
464
464
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
984
984
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
-
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date (12
months)
$A’000
4.5
Effect of movement in exchange rates on cash
held
-
-
4.6
Cash and cash equivalents at end of period
2,972
2,972
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
2,972
2,972
2,972
2,972
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5.2
Call deposits
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of quarter
(should equal item 4.6 above)
6.
Payments to related parties of the entity and their associates
Current quarter
$A'000
6.1
Aggregate amount of payments to related parties and their associates
included in item 1
171
6.2
Aggregate amount of payments to related parties and their associates
included in item 2
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an explanation
for, such payments.
More information concerning the breakdown of the above payments to directors and their related parties can be
found within the accompanying Quarterly Activities Report.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
7.1
Loan facilities
7.2
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
3,000
-
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
3,000
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest rate,
maturity date and whether it is secured or unsecured. If any additional financing facilities have
been entered into or are proposed to be entered into after quarter end, include a note
providing details of those facilities as well.
3,000
(a)
Loan facilities – directors
The Company announced on 20 October 2022 that it had received a letter of support from its
directors for $3.00 million. The letter of support is to provide an unsecured loan to the Company,
with the following terms:
•
interest at 12.00% per annum; and
•
to be repaid at the earlier of the next capital raising (including an offer entitlement) or
18 months from when the final drawdown has been made by the Company.
(b) Facility – Pioneer Resources LLC
The Company has a facility with an institutional investor, Pioneer Resources LLC for
$4.320 million (inclusive of a premium paid). This facility was fully drawn at 31 March 2023.
The facility is repayable by way of issue of ordinary shares in the Company, unless Greenvale
otherwise elects to repay the facility in cash. For the purposes of Greenvale’s Appendix 5B, the
proceeds from this facility have been reflected as debt and not equity, as it represents the form
of the proceeds received. However, given that the substance of the of the facility is/will be in
the form equity, it has not been shown as part of the financing facilities under Response 7
above.
$A’000
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
464
8.2
(Payments for exploration & evaluation classified as investing activities)
(item 2.1(d))
(541)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(77)
8.4
Cash and cash equivalents at quarter end (item 4.6)
2,972
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
2,972
8.7
Estimated quarters of funding available (item 8.6 divided by item
8.3)
38.8
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”. Otherwise, a
figure for the estimated quarters of funding available must be included in item 8.7.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer:
Not applicable, as Item 8.7 is greater than 2 quarter.
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it believe that they will
be successful?
Answer:
Not applicable, as Item 8.7 is greater than 2 quarter.
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer:
Not applicable, as Item 8.7 is greater than 2 quarter.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
Date:
This statement gives a true and fair view of the matters disclosed.
30 October 2024
Authorised by: The Board of Directors of Greenvale Energy Ltd
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that
wishes to disclose additional information over and above the minimum required under the Listing Rules is encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows
apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by
ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the [name of
board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a disclosure committee,
you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out
as complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards and gives
a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a sound system of risk
management and internal control which is operating effectively.