13 November 2023
51% INCREASE IN ALPHA RESOURCE SUBSTANTIALLY
EXPANDS PROJECT SCALE AND POTENTIAL
Significantly upgraded Mineral Resource sets a strong foundation for the upcoming PreFeasibility Study (PFS) as Greenvale makes strong progress towards its goal of becoming
Australia’s only end-to-end, domestic supplier of sustainable bituminous products.
Highlights:
•
Updated JORC Mineral Resource Estimate (MRE) completed for the Alpha
Torbanite Project in Queensland by SRK Consulting.
•
Updated Inferred Resource of 28Mt of Torbanite and Cannelite.
•
This represents a 51% increase on the maiden 18.6Mt MRE (March 2022).
•
Mineral Resource Estimate includes 4.3Mt of Torbanite.
•
Increase to volumetrics with 27.7 million barrels of synthetic oil
equivalent – up 30% on the previously stated MRE.
•
Potential to further expand the Resource both down-dip, as well as on
the adjacent EPM 27718 with further drilling.
Summary
Greenvale Energy Limited (ASX: GRV, “Greenvale” or “the Company”) is pleased to advise
that it has taken another key step towards the commercial development of its flagship, 100%owned, Alpha Torbanite Project in Queensland with the completion of an updated JORC
Mineral Resource Estimate (MRE) for the deposit.
The updated MRE sees a 9.4Mt increase in the total dry tonnes of the deposit, up from 18.6Mt
in the maiden 2022 to 28Mt of combined cannelite and torbanite. This represents a
significant 51% increase in the total size of the Inferred Resource and reinforces the scale and
potential of the Alpha deposit.
The synthetic oil equivalency of the deposit has also seen a noticeable improvement, adding
6.4 million barrels for a total of 27.7 million barrels of synthetic oil equivalent. It is also
important to note that the updated MRE synthetic oil equivalency has been calculated utilising
yield estimations from the standardised Modified Fischer Assay (MFA) results reported back
in December 2021.
REGISTERED OFFICE:
Level 5, Suite 6 189 Kent Street, Sydney, New South Wales 2000 | GPO Box 2733, Sydney NSW 2001
+61 2 8046 2799 | admin@greenvaleenergy.com.au | www.greenvaleenergy.com.au
ABN
54
000
743
555
Yield results and subsequent synthetic oil equivalency estimations are likely to improve
following completion of the final stage of liquefaction testing, currently being undertaken by
Monash University.
The completion of Test Program Four will not only allow for a potential improvement in yields,
but also an increase in the confidence level of the MRE from Inferred to Indicated for inclusion
in the upcoming Pre-Feasibility Study (PFS).
Overall, the substantial upgrade in the MRE is a compelling result. The data from the updated
MRE will now be utilised in the final delivery of the PFS and, with the increase in the overall
size of the deposit, will potentially enhance the overall economic profile of the project.
A modest decline in the total tonnage of torbanite has been observed. However, as evidenced
by the results from liquefaction Test Program Three (see ASX Announcement dated 17 May
2023), the Company and its technical advisors, Procom, have been able to achieve much
greater yields from the cannelite than first observed in the initial MFA results.
Holistically, it is expected that improvements in the processing of the cannelite will negate any
observed decrease in the total estimated tonnes of torbanite at this stage of the project. There
is also scope for further increases in the total torbanite Resource with further extensional
drilling into EPM 27718.
Greenvale’s CEO, Mark Turner, stated: “This is a fantastic outcome for our shareholders and
a very exciting milestone for the Company in our journey to develop the Alpha Project. The
completion of the updated MRE ticks another major box towards the completion of the PFS.
“The significant improvement in the scale of the Inferred Resource is extremely positive and
is expected to improve further when combined with the results from the final liquefaction test
program.
“While we are all very pleased with the 51% increase in the MRE, we know that there is still
work to be done and we look forward to further updating the market on the Alpha Project and
the advancements of our partners Monash, Technix and Lycella in the coming weeks.”
Local Geology of the Alpha Deposit
The Alpha Torbanite deposit consists of two seams, namely an Upper and Lower Seam which
sit at the base of the Colinlea Sandstone. The Lower Seam is equivalent to the ‘E’ seam within
the Colinlea Sandstone within the Galilee Basin.
The seam structure of the deposit is simple with the two seams – the Upper and Lower Seam
– having an average interburden of 16 metres. The interval between the two seams is
dominantly quartzose to lithic sandstone with minor conglomerate, siltstone and claystone
(Figure 1).
The Upper Seam is classified as cannelite and has an average thickness of ~1m and the
Lower Seam has an average thickness of ~2m. The Lower Seam is the main oil-yielding unit
of the deposit. It consists of two main types of oil shale namely cannelite and torbanite, which
is olive-grey to olive-black and is finely laminated.
The torbanite is lenticular in shape and has a variable thickness.
GREENVALE
ENERGY
LIMITED
2
The Lower Seam can generally be split into three plies, as described below:
•
L1 – comprising a relatively clean cannelite interval.
•
LT – comprising the main torbanite interval, including coal bands.
•
L2 – comprising a relatively clean cannelite interval.
Figure 1: Summary of the seam geology within MDL330.
Alpha Phase 2 Drilling Program
The Company completed the Phase 2 drilling program at the Alpha Project in early October
(see ASX announcement, 2 October 2023). The core drilling programme comprised a total of
20 HQ core holes for a combined 1,053.5m of drilling.
The program involved the acquisition of 16 cores targeting the Upper & Lower Seams and four
cores targeting just the Lower Seam. All core hole locations have been geophysically logged
with wireline tools providing down-hole gamma, density and verticality surveys.
The 15-hole chip reconnaissance drilling program which was planned to facilitate the
delineation of potential extensions of the Resource outside the geological model area has
been rescheduled to take place next year.
It is hoped that this program will improve on the reported MRE results and further boost the
potential economics of the project.
GREENVALE
ENERGY
LIMITED
3
Figure 2: Alpha drill program hole locations from the recently completed field program.
Alpha JORC Mineral Resource
The updated JORC Mineral Resource Estimate for the Alpha Deposit is set out in Table 1
and Table 2 below, with the Inferred Resource Area shown in Figure 2:
Table 1: MDL 330 Inferred Mineral Resource Estimate by seam and ply unit (plus % +/- from maiden MRE)
Seam
/Ply
Area
(m2)
Volume
(cu m)
Waste
Thickness
(m)
Waste
Volume
(bc m)
Tonnes
% +/(Air Dried) (Air Dried)
Tonnes
(Dry)
Tonnes
(In Situ)
U
5,199,146
5,409,700
21
181,383,104
6,491,640
+97%
6,653,931
6,437,543
L1
9,056,464
10,548,503
16
142,970,480
12,995,530
+64%
13,291,114
12,869,174
LT
6,774,137
3,635,190
0
157,694
4,301,324
-6.4%
4,325,876
4,289,524
L2
8,684,433
3,465,159
0
41,993
4,267,732
+49%
4,366,100
4,192,842
Total
28,056,227
+51%
28,637,021
27,789,083
The Mineral Resources were estimated for each of the modelled plies for which there are
reasonable prospects for economic extraction. Mineral Resources are limited to the area within
MDL 330 and do not, as previously stated, allow for any extension of the deposit into the
Company’s surrounding exploration permit, EPM27718.
GREENVALE
ENERGY
LIMITED
4
Table 2: MDL 330 preliminary volumetrics for Mineral Resource estimate
Seam
/Ply
Inferred Dry
Tonnes
(Mt)
% of Total
Synthetic
Oil
(MMboe)
% of Total
Oil Yield
LTOM
No. of
Drill Holes
U
6.7
23%
4.4
16%
105
2
L1
13.3
46%
8.7
31%
104
4
LT
4.3
15%
10.7
39%
395
4
L2
4.4
15%
3.8
14%
140
4
Total
28.6
100%
27.7
100%
154
6
Figure 3: Inferred Resource Area at Alpha Torbanite Project, QLD.
GREENVALE
ENERGY
LIMITED
5
Mineral Resources have been estimated for Upper and Lower seams (U, L1, LT, L2). Points
of Observation for determining cannel coal and torbanite thickness and continuity include
cored seam intersections, with geophysical wireline log.
The up-dip (northern and northeastern) limits of the Inferred Resource were defined by the
modelled base of weathering. An improved topographic surface model obtained from airborne
LiDAR acquired in 2022 has changed the projected base of weathering in the northern section
of the deposit where terrain is more variable.
The down-dip (western, southern and southeastern) extent of the inferred resource was limited
to a maximum open cut mining depth of 60 m to the floor of the Lower Seam and to the
tenement boundaries of MDL330.
The cannel coal and torbanite lens Resource tonnage calculations were based on the bulk
density model for the coal seam on an in-situ basis. The modelled laboratory air dried bulk
density data for the cannel coal and torbanite units was used to calculate air dried tonnages
and was subsequently adjusted to an in-situ moisture basis using the Preston and Sanders
(1993) calculation.
As in-situ moisture cannot be measured directly, an assumed in situ moisture of 14% was
used for the Alpha cannel coal, based on an air-dried moisture regression equation developed
by Fletcher and Sanders (2003). The resultant in-situ moisture for the sampled cannel coal
seams typically equates to the air-dried moisture of 9.4%.
A lower in-situ moisture of 6% was assumed for the torbanite lens. Due to its finer pore
structure, lack of cleat and resultant lower air-dried moisture content (av. 5.1% ad) compared
with the cannel coal plies.
No torbanite or cannel coal quality limits/grade cut-offs were applied to the MRE and the
Resource is considered amenable to open cut mining methods.
Authorised for release:
This announcement has been approved by the Board of Greenvale for release.
For further details, contact:
Mark Turner
CEO
Mobile: 0459 519 999
Media Inquiries:
Nicholas Read
Read Corporate
Nicholas@readcorporate.com.au
Mobile: 0419 929 046
GREENVALE
ENERGY
LIMITED
6
Competent Person’s Statement:
The information in this report that relates to Exploration Results is based on information
compiled by Mr. Carl D’Silva, a Competent Person who is a Member of The Australasian
Institute of Mining and Metallurgy (Member number 333432). Mr. D’Silva is a full-time
employee of SRK Consulting (Australasia) Pty Ltd, a group engaged by the Company in a
consulting capacity. Mr D’Silva has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr D’Silva consents
to the inclusion in the report of the matters based on his information in the form and context in
which it appears
GREENVALE
ENERGY
LIMITED
7
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Sampling techniques
Nature and quality of sampling (e.g., cut channels, random 2023 partly cored hole drilling program
chips, or specific specialised industry standard
20 partly cored holes drilled (HQ3 – 61.1 mm diameter), on a nominal
measurement tools appropriate to the minerals under
250 m × 250 m grid, for the purpose of obtaining torbanite and cannel coal
investigation, such as downhole gamma sondes, or
quality samples from the Upper and Lower seams (total drilling 1,058.7 m). The
handheld XRF instruments, etc.). These examples should
drilling includes 20 new holes and 1 redrill.
not be taken as limiting the broad meaning of sampling.
The core was briefly logged on surface, before being cut into variable lengths
Include reference to measures taken to ensure sample
with the core preserved in PVC splits and wrapped plastic and refrigerated on
representivity and the appropriate calibration of any
site. All samples were transported to ALS Coal Laboratories, Richlands, on
measurement tools or systems used.
completion of the coring program for the follow-up assay program.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done; this
would be relatively simple (e.g., ‘reverse circulation drilling
was used to obtain 1 m sample from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases, more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.,
submarine nodules) may warrant disclosure of detailed
information.
Drilling techniques
Drill type (e.g., core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc.) and
details (e.g., core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit, or other type, whether
core is oriented and if so, by what method, etc.).
GREENVALE
ENERGY
LIMITED
Commentary
2023 partly cored hole drilling program
All core holes were drilled vertically from surface using a hammer bit until the
coring point was reached.
Rods were then pulled and a HQ3 (96 mm) core barrel was run into the drill
hole.
A total of ~464 m of HQ3 core was acquired during the program.
The partly cored program drill hole depths ranged from 15.3 m to 88.8 m,
averaging approximately 50.4 m in depth.
8
Criteria
JORC Code explanation
Drill sample recovery
Method of recording and assessing core and chip sample
Chip samples were collected at approximately 1 m intervals.
recoveries and results assessed.
All chip samples were geologically logged and photographed.
Measures taken to maximise sample recovery and ensure
All drill samples were collected and stored in sample trays at a Greenvale
representative nature of the samples.
Energy storage facility.
Whether a relationship exists between sample recovery and Core recovery was good, and samples are representative of the seams.
grade and whether sample bias may have occurred due to Poor mechanical state was noted in some holes due to ground conditions. The
preferential loss/gain of fine/coarse material.
upper ply of Lower Seam (L1) had broken and fragmented core in some drill
holes. However, core recovery from these holes was still good.
Xenith Consulting supervised the field acquisition program under the technical
guidance of Greenvale personnel.
All core was measured, geologically logged and photographed.
The core on-site was cut into variable lengths with the core preserved in PVC
splits and wrapped in plastic and refrigerated on site and preserved to avoid
oxidation of torbanite and cannel coal and to ensure a chain of custody from
the field to the laboratory.
Due to the good core recovery, no relationship exists between sample
recovery and torbanite and cannel coal quality results. It is highly unlikely that
any sample bias has occurred.
Logging
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc.) photography.
The total length and percentage of the relevant
intersections logged.
GREENVALE
ENERGY
LIMITED
Commentary
Chip samples were collected every metre, geologically logged and
photographed.
All core was collected, measured, geologically logged and photographed.
All drill holes have been geophysically logged with the minimum suite of tools
run including Density, Calliper, Verticality/Deviation and Gamma.
The calibration of the geophysical tools was conducted by the geophysical
logging company engaged in the project at the time.
9
Criteria
JORC Code explanation
Sub-sampling techniques
If core, whether cut or sawn and whether quarter, half or all Chip samples were recovered from each drill hole at 1 m intervals for
core taken.
lithological logging, but no laboratory analysis of the samples was undertaken.
If non-core, whether riffled, tube sampled, rotary split, etc. Detailed core logging of the core and marking of sample intervals occurred at
and whether sampled wet or dry.
the ALS Coal Laboratories, Richlands, by experienced SRK personnel.
For all sample types, the nature, quality and
The core was then sampled into plies crushed and prepared for laboratory
appropriateness of the sample preparation technique.
analysis as per Australian Standards.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected, including for
instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of
the material being sampled.
and sample preparation
Quality of assay data and
laboratory tests
The nature, quality and appropriateness of the assaying and Laboratory analysis will be undertaken on the core samples from the partly
laboratory procedures used and whether the technique is
cored holes.
ALS Coal Laboratories, Richlands, complies with Australian Standards for all
considered partial or total.
For geophysical tools, spectrometers, handheld XRF
torbanite and coal quality tests and is certified by the National Association of
instruments, etc., the parameters used in determining the
Testing Authorities (NATA) in Australia.
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (i.e. lack of bias)
and precision have been established.
Verification of sampling and The verification of significant intersections by either
assaying
GREENVALE
Commentary
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
ENERGY
LIMITED
Torbanite and cannel coal quality results were verified by experienced SRK
personnel before inclusion in the geological model and resource estimate.
10
Criteria
JORC Code explanation
Commentary
Location of data points
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
All holes were professionally surveyed by Precise Positioning Solutions Pty Ltd.
The origin of the survey was based on the calculated site base station
coordinates.
All surveyed coordinates are recorded in Map Grid of Australia 1994 (MGA94)
Zone 56 using the GDA datum.
A topographic surface model was constructed using satellite data (SRTM) and
drill hole collar data.
A draft topographic surface was developed from SRTM data contoured at 2 m
intervals and triangulated to develop a draft model topographic surface
(TOPO).
Analysis of surveyed drill hole collar RLs versus the TOPO grid indicated that
the TOPO grid was on average 5.51 m higher than the drill hole collar value.
A revised topography grid was created (TOPS) by subtracting 5.51 m from the
TOPO grid.
The TOPS grid has been used as the model topographic surface from which the
base of weathering grid was subsequently developed.
Confidence in the topographic model is considered low – acquisition of
high resolution topographic survey data is recommended to support detailed
mine planning investigations.
Data spacing and
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
Stratigraphic drilling is on a nominal grid of 500 m × 500 m.
Partly cored holes are on a nominal grid of 250 m × 250 m.
However, the open holes do not support an assessment of the torbanite lens
within Lower Seam. This unit cannot be accurately determined in chip samples
or readily distinguished in the downhole wireline logs (due the similar density
of the coal and torbanite lens).
The density and distribution of drill holes supports a reasonable level of
confidence in the depth and thickness of the Upper and Lower seams across
the MDL area.
distribution
GREENVALE
ENERGY
LIMITED
11
Criteria
JORC Code explanation
Commentary
Orientation of data in
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this
is known, considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed
and reported if material.
All drill holes were drilled at 90° to the surface and are assumed to be vertical.
Downhole verticality survey is available for all drill holes.
Seam intercepts are recorded on a downhole basis.
Downhole geophysical logs were used to confirm the seam intercepts and
thicknesses.
As the deposit is gently dipping and drill holes are generally shallow, the
downhole seam thickness will approximate the true thickness of the coal.
Sample security
The measures taken to ensure sample security.
All chip samples are secured in a Greenvale facility.
All core samples are secured at ALS Coal Laboratories in Richlands.
Audits or reviews
The results of any audits or reviews of sampling techniques
and data.
A logging and sampling procedure was developed by SRK.
The Competent Person is adequately satisfied that sampling techniques and
procedures have been followed.
relation to geological
structure
GREENVALE
ENERGY
LIMITED
12
Section 2 Reporting of Exploration Results
(Criteria listed in section 1 also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral tenement and land Type, reference name/number, location and ownership
tenure status
MDL 330 is held by Alpha Resources Pty Ltd, a subsidiary of Greenvale Energy
including agreements or material issues with third parties
Limited. MDL 330 was first granted on 1 February 2002. An application for a
such as joint ventures, partnerships, overriding royalties,
renewal for an additional 5-year term was submitted in July 2021 and approved in
native title interests, historical sites, wilderness or national July 2022. The current 5-year term expires on 31 January 2027.
MDL 330 covers an area of 1,904.5 ha.
park and environmental settings.
The security of the tenure held at the time of reporting
along with any known impediments to obtaining a licence
to operate in the area.
Exploration done by other Acknowledgment and appraisal of exploration by other
parties
parties.
Historically (since the late1930s), the title has been held by a number of other
parties.
The title has been held by Alpha Resources Limited since 2002.
GREENVALE
ENERGY
LIMITED
Asset name
Licence holder
License
type
Date
Anderson
H Anderson
EPM 134
1939
Anderson & other
H Anderson & others
EPM 137
1940
Anderson
H Anderson
ML 90-95
1941–42
IMC Alpha
International Mining
Corporation
EPM 2240
1979–82
EPM 2203
1978–85
Alpha Oil Shale Project
Greenvale Mining &
Esperance Minerals
Alpha Torbanite Project
Alpha Resources
Limited
EPM 4023
1985–96
MDL 211
1996–2001
MDL 330
2002 to
present
13
Criteria
JORC Code explanation
Commentary
Geology
Deposit type, geological setting and style of
mineralisation.
The Alpha deposit lies within the axis of the Glen Avon Syncline, a southwest
plunging fold structure that occurs on the eastern flank of the Galilee Basin.
The deposit is part of the Permian Colinlea Sandstone, which contains 150 m of
cross-bedded sandstones with minor conglomerates, siltstones and mudstones.
The geology of the deposit consists of an Upper and Lower seam of cannel coal
with a torbanite lens present in the lower seam.
The Colinlea Sandstone is thought to be a lower delta plain deposit with the coal
deposited in swamps and shallow lakes in this near shore environment. The
torbanite is thought to have been deposited from algae in a lacustrine
environment when water entering the system held little sediment or organic
material.
Drill hole Information
A summary of all information material to the
A detailed list of the drill holes including downhole depths and seam intersects
understanding of the exploration results including a
are shown in Table 1-1 and Table 1-2.
tabulation of the following information for all Material drill Geophysical deviation logs (verticality) are available for all holes.
All drill holes have been surveyed.
holes:
easting and northing of the drill hole collar
The verticality data for all deeper holes have been loaded and the holes were
elevation or RL (Reduced Level – elevation above sea level
modelled accounting for any inclination.
in metres) of the drill hole collar
dip and azimuth of the hole
downhole length and interception depth
hole length.
If the exclusion of this information is justified on the basis
that the information is not Material and this exclusion
does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the
case.
GREENVALE
ENERGY
LIMITED
14
Criteria
JORC Code explanation
Commentary
Data aggregation methods In reporting Exploration Results, weighting averaging
Torbanite and cannel coal were treated separately and not aggregated.
Relationship between
All drill holes were drilled at 90° to the surface and are assumed to be vertical.
Downhole verticality survey is available for all drill holes.
Seam intercepts are recorded on a downhole basis.
Downhole geophysical logs were used to confirm the seam intercepts and
thicknesses.
As the deposit is gently dipping and drill holes are generally shallow, the
downhole seam thickness will approximate the true thickness of the coal.
techniques, maximum and/or minimum grade truncations
(e.g. cutting of high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate short lengths of
high-grade results and longer lengths of low-grade results,
the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be
shown in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
mineralisation widths and
intercept lengths
These relationships are particularly important in the
reporting of Exploration Results.
If the geometry of the mineralisation with respect to the
drill hole angle is known, its nature should be reported.
If it is not known and only the downhole lengths are
reported, there should be a clear statement to this effect
(e.g. ‘down hole length, true width not known’).
Diagrams
Appropriate maps and sections (with scales) and
All appropriate diagrams are contained in the report.
tabulations of intercepts should be included for any
significant discovery being reported These should include,
but not be limited to a plan view of drill hole collar
locations and appropriate sectional views.
Balanced reporting
Where comprehensive reporting of all Exploration Results
is not practicable, representative reporting of both low
and high grades and/or widths should be practiced
avoiding misleading reporting of Exploration Results.
GREENVALE
ENERGY
LIMITED
All available exploration data for the Alpha Torbanite area has been collated and
reported.
This release describes all relevant information.
15
Criteria
JORC Code explanation
Other substantive
Other exploration data, if meaningful and material, should The updated interpretation is predominantly based on the 2023 and 2021 drilling
be reported including (but not limited to): geological
results.
Limited
historical drill hole information was used to supplement the 2023 and
observations; geophysical survey results; geochemical
2021 drilling and support the continuity of the Upper and Lower seams outside
survey results; bulk samples – size and method of
the bounds of the MDL area.
treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics;
potential deleterious or contaminating substances.
exploration data
Further work
GREENVALE
The nature and scale of planned further work (e.g. tests
for lateral extensions or depth extensions or large-scale
step-out drilling).
Diagrams clearly highlighting the areas of possible
extensions, including the main geological interpretations
and future drilling areas, provided this information is not
commercially sensitive.
ENERGY
LIMITED
Commentary
The updated geological model has enabled a more robust interpretation of the
deposit structure, and the limits of the torbanite lens.
The geological model will be used support the planning and execution of a core
drilling program to target down-dip areas to better define the limits of the
torbanite lens in Lower Seam.
Additional core drilling is also recommended in the northern sector to provide
higher confidence in the modelled subcrop of Lower Seam