Full Year Statutory Accounts
Released
Released
Announcement PDF
GREENVALE ENERGY LIMITED
A.B.N. 54 000 743 555
ANNUAL FINANCIAL REPORT
YEAR ENDED
30 JUNE 2023
TABLE OF CONTENTS
Corporate Directory
2
Chairman’s Letter
3
Review of Operations
5
Directors’ Report
19
Auditor’s Independence Declaration
35
Consolidated Statement of Comprehensive Income
36
Consolidated Statement of Financial Position
37
Consolidated Statement of Changes in Equity
38
Consolidated Statement of Cash Flows
39
Notes to the Consolidated Financial Statements
40
Directors’ Declaration
74
Independent Auditor’s Report
75
1 | GRV – Annual Financial Report 2023
CORPORATE DIRECTORY
DIRECTORS
Mr Neil Biddle (Non-Executive Chairman)
Mr Elias (Leo) Khouri (Non-Executive Director)
Mr Mark Turner (Executive Director and Chief Executive Officer)
JOINT COMPANY SECRETARIES
Vince Fayad
Kurt Laney
REGISTERED OFFICE & PRINCIPAL PLACE OF BUSINESS
Suite 6, Level 5
189 Kent Street
Sydney NSW 2000
Tel: +61 2 8046 2799
SHARE REGISTRY
Link Market Services
Level 12, 680 George Street
Sydney NSW 2000
Tel: +61 2 82807111
AUDITORS
RSM Australia Partners
Level 13, 60 Castlereagh Street
Sydney NSW 2000
STOCK EXCHANGE
Australian Securities Exchange
20 Bridge Street
Sydney NSW 2000
ASX CODE
GRV
WEBSITE
www.greenvaleeenergy.com.au
2| G R V – Annual R e p o r t 2 0 2 3
CHAIRMAN’S LETTER
significant expertise in liquefaction studies – to
undertake Test Program Three. Upon completion of
Test Work Three at the UoJ, the maximum
conversion rates yielded a 72% increase in
conversions for Cannel Coal from those achieved in
Test Program Two. The Company remains confident
there is room for further improvement, with Test
Program Four now in progress to assess this.
Dear Fellow Shareholders,
The past year has seen Greenvale make substantial
refinements to its commercialisation strategy and
strategic focus in order to position the Company for
long-term growth and success.
The results of the liquefaction test work programs
will lay the foundation for a Preliminary Feasibility
Study, which is expected to be completed by
quarter 1 of 2024. Following this, the Pilot Plant
trials which commence shortly thereafter.
The development of our flagship Alpha Torbanite
Project in Queensland to supply locally sourced,
sustainable bituminous products represents an
enormous opportunity for Greenvale shareholders.
However, one of the main issues that we have faced
in unlocking the potential of the Alpha Project to
date has been the need to achieve a sustainable
development pathway. Traditional methods of
extraction (such as pyrolytic retorting) undertaken
previously have not yielded the optimal product
results that are required to achieve sufficient
energy efficiency and emissions standards.
The nature of the Company’s liquefaction work is
ground-breaking, which is testament to
resourcefulness shown by the Greenvale
management team – headed by our CEO Mark
Turner. The ground-breaking nature of the work is
evidenced by the eligibility of the Alpha Project to
participate under the Australian Government’s
Research and Development (R&D) grant. For the
costs incurred at Alpha during the 2022 financial
year, the Company received $0.46 million in the
form of a tax refund.
During the past year, the Company has made
enormous progress towards resolving these
challenges, with the conceptualisation of what we
now refer to as the ‘Liquefaction Strategy’. In
August 2022, Greenvale announced that it had
received initial positive results from the Stage One
Liquefaction Test Work (Test Work One) – which
was undertaken by industry experts PROCOM
Consultants Pty Ltd. The results of Test Work One
warranted further investigation of the liquefaction
concept as a potentially viable processing route for
bitumen production.
In light of this, the Company undertook further
testing during the 2023 financial year to refine its
liquefaction strategy and to develop a commercial
processing pathway for Alpha. To this end, the
Company completed Test Work Programs Two and
Three in March 2023 and May 2023 respectively,
with each test program conducted at higher
temperatures for the purposes of optimising the
conversion settings of the heavy oil fractions.
Notably, the Company engaged the University of
Jordan (UoJ) – a world-class institution that has
In conjunction with progressing the Alpha strategy,
the Company also made solid advancements with
its geothermal strategy. The Company’s "dual-lane"
strategy announced in September 2022 provided
that both projects are strategically aligned to assist
the Company in becoming a sustainable Australian
bitumen producer and renewable energy provider.
To confirm the geothermal potential of the
Company’s assets, an independent assessment was
undertaken by Ascendience Geoscience and
published by the Geological Survey of Queensland.
This assessment confirmed the geothermal
potential of the Millungera Basin, a region where
the Company holds several geothermal licences.
The assessment indicated that the total stored
thermal energy potential in the Millungera Basin is
likely to exceed 611,000 petajoules at a 90%
probability.
Building on the positive results received from the
Ascendience Geoscience assessment, the Company
proceeded to assess the technical viability of
developing a geothermal power station in the
3| G R V – Annual R e p o r t 2 0 2 3
CHAIRMAN’S LETTER
Millungera Basin. To do this, the Company engaged
CeraPhi Energy (CeraPhi), a prominent geothermal
development company, to conduct a feasibility
study for the Company’s Longreach Geothermal
Project in North Queensland. CeraPhi's proprietary
patents for its closed-loop geothermal technology
(known as CeraPhiWellTM), are considered to be
essential in delivering on the Company’s strategy to
become a sustainable energy provider.
Given Greenvale’s strategic focus on developing the
Alpha Torbanite Project and becoming a
sustainable geothermal energy provider, the
Company completed the disposal of an 80% interest
in the Georgina Basin IOCG Project in East Tennant
Creek to Astute Metals NL (ASX: ASE) in November
2022.
The transaction sees Greenvale retain exposure to
future upside from the Georgina Basin Project, both
through its investment in Astute Metals NL
(formerly Astro Resources NL) as Well as through its
20% interest in the tenement holder of the
Georgina Project, Knox Resources Pty Ltd, 2% Net
Smelter Royalty.
The Board is confident that the refined
commercialisation pathway developed for the
Alpha Torbanite Project during the year will allow
the Company to realise its vision of becoming a
sustainable producer of bituminous products to
meet Australia’s infrastructure needs.
In conclusion, I would like to thank the Greenvale
team, led by our CEO Mark Turner, for their hard
work and dedication. I have every confidence that
we will see these efforts rewarded over the year
ahead.
I would also like to take this opportunity to thank
Ms Dagmar Parsons and Mr Tony Leibowitz for their
contribution to the Company, noting that they both
departed the Company during the year. I look
forward to updating shareholders throughout the
coming year about the progress made across the
Company’s exciting projects.
Neil Biddle
Chairman
4| G R V – Annual R e p o r t 2 0 2 3
REVIEW OF OPERATIONS
OVERVIEW
Greenvale has two key projects within its portfolio:
The Alpha Torbanite Project, located in Alpha, Queensland; and
The Geothermal Projects, located in the Millungera Basin and Longreach, Queensland.
Greenvale also holds a 20% shareholding in Knox Resources Pty Ltd (Knox), which is the tenement holder of
seven granted Exploration Licences, with three under application, in the highly prospective East Tennant
province in the Northern Territory.
ALPHA TOBANITE PROJECT, QLD
Background
The Alpha Torbanite Project is located approximately 50km south of the town of Alpha in Central Queensland,
Australia.
The deposit consists of two seams, an upper seam of mostly lower-grade mineralisation with an average
thickness of 1.12m and a lower seam containing lenses of torbanite up to 1.9m thick. The Project has been subject
to extensive exploration and laboratory testing since its initial discovery in 1939.
Figure 1: Location of the Alpha Torbanite Project
In the 2022 financial year, the Company received Modified Fischer Assay (MFA) results for Alpha, which improved
significantly on previously un-verified historical oil yield ranges published for the deposit.
These results increased the Company’s confidence in the commercial exploitability of the project and
demonstrated that the Alpha Project ranks amongst the highest-yielding deposits in the world when compared
with similar style deposits (Table 1).
The oil yield values for the 12 Alpha samples (Figure 2) were all extremely positive and were either in line with
or above expectations.
5| G R V – Annual R e p o r t 2 0 2 3
REVIEW OF OPERATIONS
Figure 2: Comparison of MFA results between Torbanite and Cannel Coal samples
Deposit
Torbanite/Coal/
Oil shale
Oil Yield (LTOM)
Range
Average
Torbanite
50 - 620
420
Cannel coal
50 - 150
120
Green River (USA)
Oil shale
45 - 460
135
Rundle, Qld
Oil shale
50 - 200
105
Stuart, Qld
Oil shale
50 - 220
94
Duaringa, Qld
Oil shale
50 - 130
82
Condor, Qld
Oil shale
50 - 120
65
Julia Creek, Qld
Oil shale
50 - 100
60
Alpha, Qld
Table 1: Comparative data of various oil shales
Work Undertaken
Commercialisation Strategy – Liquification and Test Work One
In August 2022, the Company refined its commercialisation strategy for the Alpha Torbanite Deposit (Alpha).
As outlined in the ASX release of 22 September 2021, a commercialisation strategy for Alpha had been designed
which incorporated a “green” power generation model, with the aim of positioning Greenvale to become a longterm provider of power into a local power grid from a 100MW solar and gas-fired hybrid power station. However,
after extensive retort testing was conducted on samples obtained from the Company’s core hole program
(completed in June 2021), it was deemed that traditional retorting would not deliver the optimal product yields.
In light of this, the Company revisited its geological modelling and test retort work for Alpha. Based on this
review, the Company announced on 24 August 2022 that ‘liquefaction’ – an alternate processing route – had
been tested and generated the necessary heavy oil fractions required for bitumen production.
The initial liquefication test work was conducted in a Parr Reactor by PROCOM Consultants Pty Ltd during the
December 2022 Quarter, enabling the Company to break down the torbanite in a hydrogen-rich environment at
a controlled temperature (Test Work One).
6| G R V – Annual R e p o r t 2 0 2 3
REVIEW OF OPERATIONS
The samples generated were subsequently analysed by Bureau Veritas Laboratories in Brisbane, Adelaide and
Mackay, which concluded that liquefaction can be used effectively to generate oils within the heavy oil fractions
necessary to produce or can be added to bitumen blends (Table 1).
Additionally, Test Work One was successful in:
Deriving the desired heavy oil fractions without the relative amounts of associated gaseous waste
materials present in the previous pyrolytic retort program; and
Demonstrating that the torbanite component of the Resource is amenable to liquefaction even at 25
Centigrade degrees low temperatures.
MFB2
(Note 1)
Comment
B1 HT
B1 LT
F1 LT
F2 HT
MFB1
HT
Feed Total (grams)
716.3
716.3
716.3
716.3
716.3
716.3
555.7
555.7
592.7
455.8
615
587.1
22%
22%
17%
36%
14%
18%
160.6
160.6
123.6
260.5
101.3
129.1
48.01
23.40
4.29
9.49
36.83
-
112.59
137.20
119.31
251.01
64.47
-
16%
19%
17%
35%
9%
-
0.17
0.56
0.50
6.29
1.32
-
112.42
136.64
118.82
244.71
63.15
-
Solids separated from reactants
(grams)
Overall conversion of solids (%)
Solids converted total (grams)
Solids to waste gas (grams)
Solids converted to Hydrocarbons
(grams)
Solids converted to Hydrocarbons (%)
HC Gas (grams)
HC Liquid (grams)
Note 1: no gas sample was taken for analysis for the MFB2 sample hence conversion data is not available.
Table 2: Summary of results from Test Work One
Test Work Two Completed
Further to the initial phase of Parr Reactor test work using liquefication to produce bitumen blends (Test Work
One), additional test work was undertaken at a higher temperature to determine an optimum percentage of
heavy oil fractions (Test Work Two).
The Test Work Two samples were retorted at the maximum temperature of the available Parr Reactor at the
time (approximately 365⁰C and a capacity of 7 litres), with the trial samples sent to Intertek’s Perth laboratory
for analysis. The results of Intertek’s testing for Test Work Two were reported by the Company on 30 March
2023 and confirmed that, with a mild increase in temperature together with fractional changes to other
variables, an improved yield from the cannel coal samples could be achieved while continuing to produce low
amounts of gas.
A comparison between the cannel coal test results derived from Test Work One and Test Work Two are as
follows:
A 57% increase in conversion from solids to oil and gas, noting that Test Work One achieved a
conversion of approximately 24.8wt% at 340oC, 3500 kPa and 1.5wt% catalyst. In contrast, Test Work
Two achieved a maximum of 39.0wt% (avg. 34.9wt%) conversion at 365oC, 3500 kPa and 6wt% (average
4 wt%) of catalyst; and
Test Work One returned a total cannel coal conversion of 24.9wt%, comprising 22.4wt% oil and gas and
2.5wt% asphaltenes. However, Test Work Two saw the percentage of asphaltenes jump to a maximum
of 6.5wt%, with an average of 4wt%.
7| G R V – Annual R e p o r t 2 0 2 3
REVIEW OF OPERATIONS
The results from Test Work Two further reinforced the suitability of liquefaction over pyrolysis when attempting
to produce the target oil.
Figure 3: Comparison of Cannel Coal Sample Conversions between Test Work One and Test Work Two
Test Work Three Completed
During to ongoing delays caused by Australian personnel shortages and capacity constraints that were
encountered in Test Work Two, the Company engaged the University of Jordan to undertake the next stage of
the liquefaction test program (Test Work Three). The appointment of the University of Jordan (UoJ), a worldclass institution with significant expertise in liquefaction studies, represented a positive step to overcome the
challenges faced in conducting specialised tests for the Alpha Torbanite Project in Australia.
Test Work 3 focused on increasing temperatures, varying catalysts and changing carrier fluids from Test Work
Two to improve the yields of heavy hydrocarbons required for bitumen production from cannel coal and
torbanite. Unlike Test Work One and Two, which were conducted in a 7-litre Parr Reactor, Test Work Three’s
liquefaction reactions were carried out in a 0.1-litre stirred autoclave reactor in order to achieve higher
temperatures.
A comparison between the cannel coal test results derived from Test Work Two and Test Work Three were as
follows:
The Cannel Coal portion of the Alpha Resource achieved a conversion rate of 67.3 wt%, the Torbanite
portion achieved 65.9 wt%, and a blended sample achieved 66.3 wt% conversion in Test Work Three.
In contrast, Test Work Two achieved a maximum of 39.0wt% (avg. 34.9wt%) conversion at 365oC, 3500
kPa and 6wt% (average 4 wt%) of catalyst (Figure 4); and
A 72% increase from Test Program Two to Test Program Three a total cannel coal conversion.
With the successful completion of Test Program Three, the Company commenced preparations to undertake
Test Work Program Four. This program has been designed to improve on the conversions demonstrated in Test
Work Three, emphasising enhancement of the yields of heavy oil and asphaltenes.
8| G R V – Annual R e p o r t 2 0 2 3
REVIEW OF OPERATIONS
Figure 4: A comparison of the maximum conversions achieved for cannel coal samples across the threeliquefaction test programs
Commencement of Stage Two Drilling
In June 2023, the Company commenced its second phase of drilling at the Alpha Torbanite Project. The purpose
of the drilling campaign is to increase the size and confidence level in the Inferred JORC Mineral Resource (18.6
million tonnes) The drilling program will facilitate upgraded structural and geological modelling and provide key
geotechnical data for mine planning purposes, as well as for definitive process design work.
The drilling program, which commenced on 28 June 2023, comprised 25 HQ core holes and 15 open holes,
totalling 2,000 metres.
Process Plant Design
Upon receipt of the results from Test Work One at Alpha, the Company commenced conceptual design work for
the Alpha Processing Plant in August 2022.
The conceptual design is currently based on publicly available data in the literature and past related projects,
with the objective of evaluating emissions and energy balance estimates. It is anticipated that these conceptual
works, when combined with the results from the Parr Reactor test program, will provide for a near-final process
plant concept for the Alpha site.
Simulations of the initial plant design have been initiated to better understand and optimise the processing flow
for greater yields of desired heavy hydrocarbon fractions. The results from Test Programs 3 and 4 have guided
further refinements in plant design and processing flow. Additionally, simulation work is ongoing to estimate
likely emissions and overall balances, which will inform Greenvale's geothermal energy and offsetting strategy.
COMPETENT PERSONS STATEMENTS – ALPHA PROJECT
The information in this report that relates to Exploration Results is based on information compiled by Mr Carl
D’Silva, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy (Member
number 333432).
Mr D’Silva is a full-time employee of SRK Consulting (Australasia) Pty Ltd, a group engaged by the Company in a
consulting capacity.
Mr D’Silva has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.
Mr D’Silva consents to the inclusion in the report of the matters based on his information in the form and context
in which it appears.
9| G R V – Annual R e p o r t 2 0 2 3
REVIEW OF OPERATIONS
The information in this report that relates to Metallurgical Results is based on information compiled by David
Cavanagh, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy AusIMM
Member number 112318 David Cavanagh is a full- time employee of Core Resources.
David Cavanagh has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.
David Cavanagh consents to the inclusion in the report of the matters based on his informationin the form and
context in which it appears
MINERAL RESOURCES AND ORE ESTIMATES – CORPORATE GOVERNANCE STATEMENT
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the Mineral Resource Estimate dated 9 March 2022 as announced to the ASX on that date and which
is available at www.greenvalemining.com. The Company confirms that in relation to the Alpha Torbanite Project
Mineral Resource Estimate, all material assumptions and technical parameters underpinning the estimate
continue to apply and have not materially changed when referring to its resource announcement made on 9
March 2022.
GEOTHERMAL PROJECTS
Background
The Company’s geothermal portfolio comprised applications for six Exploration Permits for Geothermal (EPG)
located within central and north-western Queensland, Australia.
Of the Company’s geothermal licences, three licences are located within the highly prospective Millungera Basin
(EPG 2023 (Julia Creek), EPG 2024 (Lara Downs) and EPG2025(Ouchy)). The Millungera applications are located
approximately 120km east of Mount Isa within the North-West Minerals Province (see Figure 5). They lie in the
catchment of the $1.7 billion CopperString 2.0 project, which will connect remote parts of north-western
Queensland to existing power infrastructure in Townsville.
An independent study conducted by the Geological Survey Queensland (GSQ) in June 2018 has highlighted the
Millungera Basin to be the most prospective geothermal site in Australia, believed to have stored thermal energy
likely to exceed 611,000 petajoules.
Moving forward the company will direct its focus on two key projects at Millungera and Longreach. After an
internal review identified that there is limited geothermal potential, the company has withdrawn it EP 2021
(Winton) and EP2022 (Quilpie) applications.
Additionally, the Company’s geothermal projects will enable the Company to develop a carbon offsetting
strategy, thereby providing sufficient carbon credits to offset future production at the Alpha Torbanite Project.
Work Undertaken
Licences Granted
On 29 August 2022, the Company was successfully awarded two EPMs (EPM 28487 – Julia Creek and EPM 28488
– Longreach).
The Company has since decided to forgo the extraction of subsurface brines and associated elements to focus
on exclusively on sustainable energy production. As a result, company has decided not to proceed with the
associated applications and has relinquished the two permits that have been granted.
Also during the 2023 financial year, the Company engaged in discussions with native title parties to ascertain a
likely negotiation timeline for the granting of native title approvals.
10| G R V – Annual R e p o r t 2 0 2 3
REVIEW OF OPERATIONS
Discussions with the respective native title parties remain ongoing and the Company will provide shareholders
with an update on the status of the permit approvals once received.
Desktop Analysis
On 6 September 2022, the Company commissioned an independent assessment of the previously inferred
geothermal resource estimates in the Millungera Basin – as reported by the Geological Survey of Queensland
(GSQ)1. The independent assessment was conducted by Ascendience Geoscience (Ascendience).
The brief provided to Ascendience by the Company was to review GSQ’s report and ascertain whether the
conclusions pertaining to the assessment of a geothermal resource potential of two identified sites in the
Millungera Basin were sound.
The Ascendience review concluded that the GSQ report was of high quality and provides a comprehensive
assessment that accurately describes the presence of an inferred geothermal resource within the Millungera
Basin. The assessment indicated that the total stored thermal energy potential in the Millungera Basin is likely
to exceed 611,000 petajoules at a 90% probability.
Geological Mapping
Of particular focus for the Company during the 2023 financial year was the geological and geophysical modelling
of the geothermal prospect EPG2029 (Longreach).
Work undertaken on EPG2029 during the year included mapping the average temperature gradient across the
entirety of the permit and refining the depth of potential reservoir intervals. The models generated will
subsequently be used in the planning of a drill program.
Feasibility Study – Longreach
Building on from the Ascendience Geoscience, the Company assessed the potential for geothermal power
generation as a sustainable energy source in the Millungera Basin. To assess this, the Company engaged CeraPhi
Energy (CeraPhi), a prominent geothermal development company, to conduct a Feasibility Study for the
Company’s Longreach Geothermal Project in North Queensland.
CeraPhi was selected by the Company to undertake the feasibility study due to its proprietary patents which use
a closed-loop geothermal technology, known as CeraPhiWellTM. The Company is of the view that this technology
will enable Greenvale to produce 24/7 baseload renewable energy with no groundwater usage, making it an
environmentally friendly and sustainable option. The results of the Feasibility Study were delivered and
announced by the Company in September 2023.
Within Energy Transaction
During the 30 June 2022 financial year, the Company announced the proposed acquisition of Within Energy Pty
Ltd (Within), a Queensland-based company which held three geothermal licences in southeast Queensland.
Under the terms of the conditional agreement, Greenvale was to acquire an initial 51% controlling interest in
Within, which could increase to 100% upon completion of a predetermined milestones.
With the Company’s own applications for several geothermal licences (as noted above) and the opportunities
these presented to the Company, the Company decided to not proceed with the Within transaction during the
2023 financial year.
1
Queensland Geology 14: An assessment of the geothermal energy potential of northern and eastern Queensland (Talebi et al.,
2011).
11| G R V – Annual R e p o r t 2 0 2 3
REVIEW OF OPERATIONS
COMPETENT PERSONS STATEMENTS – GEOTHERMAL PROJECTS
The geological information presented in this document for the Geothermal Projects has been based on
information compiled by Dr Mark Lisk.
Dr Mark Lisk is Chief Geologist for Ascendience Group and holds a PhD in petroleum systems analysis from Curtin
University and an MSc. Honours degree in geothermal systems from the University of Auckland.
Dr Lisk has more than 30 years’ experience in the oil and gas sector, with a specialty in assessing the thermal
history of sedimentary basins. He has previously worked as a Principal Geologist for Woodside Energy Ltd and a
Senior Research Scientist with the Commonwealth Scientific and Industrial Research Organisation (CSIRO).
GEORGINA BASIN IOCG PROJECT, EAST TENANT CREEK, NORTHERN TERRITORY
Background
Located in the highly prospective East Tennant province in the Northern Territory, the Georgina Project is 20%owned by Greenvale, with the remaining 80% owned by Astute Metals NL (ASX: GASE). The divestment to Astute
was completed in November 2022. The Project comprises seven granted Exploration Licences, with three under
application, for a combined total area of approximately 4,500km2 (Figure 5).
The East Tennant Province has been the subject of intense geoscientific investigation by both Geoscience
Australia and the Northern Territory Geological Survey over the last five years. Pre-competitive work undertaken
as part of the Federal Government’s $225 million “Exploring for the Future” Program (EFTF) included solid
geology interpretation, alteration proxy mapping and mineral prospectivity mapping for Iron Oxide Copper Gold
(IOCG) deposits. The collaborative MinEx CRC National Drilling Initiative, conducted in late 2020, confirmed the
highly prospective nature of the region by intersecting prospective host rocks, IOCG-style alteration and sulphide
mineralisation as part of a 10-hole program at East Tennant.
Figure 5 – Georgina IOCG Project tenements and Geoscience Australia mineral potential ‘heat map’, with
hotter colours indicating greater prospectivity, noting the Ranken Project tenements EL32285 and EL32286 to
the far east of the Project
12| G R V – Annual R e p o r t 2 0 2 3
REVIEW OF OPERATIONS
Terms of the sale
Greenvale disposed of 80% of its interest in the Georgina Basin Project to Astute Metals NL (ASX: ASE or Astute)
in November 2022. The Georgina Basin Project and associated tenement licences are owned by a company called
Knox Resources Pty Ltd (Knox).
The key terms of the acquisition of Knox are summarised as follows:
•
46,000,000 fully-paid Astute ordinary shares (Shares) (Share Consideration). The Share Consideration
is subject to the following escrow provisions:
o
o
o
20% - no escrow;
30% - one year escrow; and
50% two years escrow.
•
Greenvale will be required to contribute to the funding of its share of Knox’s future costs;
•
A 2% net smelter royalty (Royalty) for all IOCG product exploited in the future from the existing
tenements owned by Knox;
•
Astute has the right to acquire the remaining 20% of Knox shares for cash or shares (at the election of
Astute) for a period of two years following the completion of the initial acquisition. The value of the
acquisition is to be based on an independent valuation to be commissioned by Astro and Greenvale.
Where the consideration is to be Astro shares, the number of shares to be issued is to be based on
Astro’s volume weighted average share price (VWAP);
•
In addition to the above, Greenvale granted to Astute an option to purchase the Royalty within a period
of five years from the date of acquisition at an independent valuation for either cash or shares (at
Astro’s election). Again, to the extent that Astute Shares are issued to satisfy the acquisition, the
number of shares is to be based on the volume weighted average trading price, without a discount; and
•
The approval of the acquisition of the remaining 20% and/or Royalty will be subject to future
shareholder approval.
Work Undertaken
Assay results – Leichardt West and Banks
During the March 2023 Quarter, assay results were received by Astute for two diamond drill-holes completed
by Greenvale at the Banks and Leichhardt West prospects in mid-2022.
Visual results reported by Greenvale at the time drilling was undertaken indicated that both drill-holes had
intersected trace to minor chalcopyrite (copper mineral) mineralisation in prospective altered host-rocks.
Laboratory assay results subsequently confirmed these visual observations of copper, as well as revealing
anomalous levels of other elements commonly associated with IOCG deposits (e.g., bismuth, which is commonly
associated with Tennant Creek-
Share your feedback
Discover