SIGNIFICANT EXTENSIONAL OPPORTUNITIES OUTLINED BY
TRENCHING PROGRAM AT OASIS URANIUM PROJECT
Greenvale Energy Limited ASX: GRV (“Greenvale” or “the Company”) is pleased to advise that it
has identified exciting new extensional exploration opportunities at its Oasis Uranium Project in
Queensland following the completion of an extensive trenching and sampling program.
The trenching program, which ran from 28 October to 10 November, comprised six trenches dug
by excavator, each measuring 1.2m wide, variable depths between 1.6 and 2.5m deep and up to
150m in length. Structural data was obtained from within each trench, along with sampling for
geochemical analysis.
Once data and samples were obtained, the trenches were immediately backfilled and
rehabilitated. Concurrently, the drill pads and sumps from the Company’s recent drill program
were rehabilitated, by mid-November 2025, all 12 drill sites and the six trenches were completely
rehabilitated, with personnel and equipment cleared from the Project by 17 November 2025.
Detailed exploration results are provided in Appendix 1.
Greenvale CEO Alex Cheeseman said:
“We are very pleased with the initial outcomes of the trenching program, with preliminary hand-
held scintillometer readings returning highly encouraging results, while the geological and
structural information we’ve collected will add significant value to the ongoing development of
our geological model.
“We see consistent patterns emerging between the geological, geophysical, geochemical and
structural information we have acquired this field season at Oasis. This knowledge base will be
enhanced further by the trenching results. The insights gained from these combined datasets
Highlights
▪ Highly successful trenching program completed at the Oasis Uranium Project,
comprising six trenches for a total of ≈775 trench metres.
▪ Preliminary results support the existence of a second mineralised structure, with
hand-held scintillometer readings exceeding 2,000cps in areas of mapped
megacrystic granite and biotite-chlorite schists.
▪ Trenching samples have been submitted for analysis, with assay results pending.
▪ Results from the trenching and recent drilling programs will be incorporated into the
expanded Oasis geological model for future drill testing.
▪ All trenches, drill pads and drilling sumps have been rehabilitated, with all personnel
and equipment now demobilised from the project area.
Greenvale Energy Limited ASX Release
Page | 2
creates an excellent exploration blueprint for us to target exciting regional opportunities
surrounding Oasis – which will be our immediate focus in the New Year.”
Figure 1 – Project Location Map highlighting the Oasis Deposit within EPM27565
Trenching Program
The Oasis Uranium Project (EPM 27565) covers an area of 90km² in North Queensland,
approximately 300km west of Townsville and entirely within the Lynd Station pastoral lease (refer
to Figure 1).
Trench sampling is a well-established andvery cost-effective exploration technique whichallows
an explorer to build a solid geological, structural and geochemical understanding of the area in a
relatively short timeframe.
The trenching program was originally designed to consist of nine trenches, with each trench
planned to be 150m long and approximately 1-2m in width and depth. Prior to excavation, each
planned trench line was radiometrically surveyed at surface with a hand-held scintillometer.
The objective of the trenching program was to establish a geochemical, geological and structural
profile in areas of likely mineralised extensions along strike, both to the north and south of the
main Oasis Deposit.
The trenches were also designed to test lateral targets identified from the recent, close-spaced,
high-resolution, ground magnetic survey and coincident Sentinel-2 multispectral gas anomalies.
Preliminary hand-held scintillometer readings returned background values of less than 350
counts per second (cps) over the western areas of the deposit. These values were found to
Greenvale Energy Limited ASX Release
Page | 3
increase significantly towards the eastern part of the main shear zone, with readings in places of
more than 2,000 cps.
This pattern in surface scintillometer readings led to a more flexible and dynamic approach to
the trench excavation process whereby, instead of rigidly sticking to the original planned lines,
the field scintillometer readings were used to slightly adjust the position and length of each
trench before excavation began. Figure 2 shows the final trench location map and surface
scintillometer readings.
Figure 2 – Oasis project final trench location plan
Greenvale Energy Limited ASX Release
Page | 4
The drop in surface scintillometer counts in the western areas is an interesting factor, as it
supports the model of an increasing vertical depth-to-mineralisation that one would expect of a
steeply-dipping, mineralised structure. The same observation was made during drilling, when
hole 25GRV003 was found to lack a corresponding surface expression or indicative anomalous
radiometric response above the intersected mineralisation, which is likely being masked by
overlying, calcareous cover sediments.
The second, potentially mineralised, NNE- to NE-trending structure, discovered during the early
part of the trenching program1
, coincides with the position of a linear, NNE-striking,
demagnetised zone on the northwestern edge of NE-trending, highly magnetic feature. The
original plan included a trench line, designed as T08, to test this magnetic feature and the NNE-
trending zone.
Based on the pattern of high scintillometer readings on the eastern sides of trenches 25GRVT03
and 25GRVT04, an additional trench was excavated as 25GRVT05 and trench T08 was
recategorized as 25GRVT06 to further explore this interpreted mineralised structure.
Maximum scintillometer readings from within both trenches 25GRVT05 and 25GRVT06 exceeded
700cps, along strike and to the north of the >2,000cps readings recorded in trench 25GRVT04.
On excavation, these zones of highly anomalous radiometric response were found to correlate
with megacrystic, K-feldspar-rich granites and the same biotite-chlorite schists that are known
to host uranium mineralisation at Oasis (Figure 3).
A total of 449 trench samples have now been collected and submitted to Intertek for analysis.
Geological, structural and indicative XRF information also form part of the comprehensive suite
of data collected from the trenching and are currently being incorporated into the deposit- and
project-wide prospectivity analysis work which is informing target generation for future
exploration programs across EPM27565.
The Company’s contract field personnel ensured that trench excavation was completed on time
and on budget, while also maintaining the highest standards of safety and compliance at all
times. As soon as the field team had collected the required samples, each trench was
immediately backfilled, including back-filling and rehabilitation of older trenches, assessed to
have been excavated during the 1970’s exploration programs completed at Oasis.
Rehabilitation Complete
Now that the Company’s 2025 field season has concluded, all six trenches and 12 drill sites have
been backfilled, rehabilitated and scarified.
Site rehabilitation activities concluded by 14 November 2025. Figure 4 illustrates the work done
to ensure that all site disturbance was addressed prior to final demobilisation of all field
personnel from the Project.
1
Refer to ASX Announcement Further high-grade assays and second structure released 12 Nov 2025
Greenvale Energy Limited ASX Release
Page | 5
Figure 3 – Field Section Profile through Trench 25GRVT04, showing preliminary geological
and structural observations
Figure 4 – Greenvale trench 25GRVT04 and the site of an old, exposed trench (ca. 1970s)
(left hand image) now fully rehabilitated (right hand image)
Greenvale Energy Limited ASX Release
Page | 6
Next Stage of Work
Chemical assays from the final six drill-holes from Greenvale’s recent drilling program at Oasis
are expected in early December. Assay results from the trenching program are expected in the
next 1-2 months.
All data collected from the drilling and trenching programs will be analysed and incorporated into
the deposit-wide geological model, which will be used to further develop and enhance the
Company’s exploration strategy to be applied at regional targets surrounding the Oasis deposit.
Ongoing prospectivity analysis will utilise the knowledge gained from the geological modelling to
add to the current suite of exploration targets and future exploration programs.
Authorised for release
This announcement has been approved for release by the Board of Directors.
For further information please contact
Alex Cheeseman Nicholas Read
CEO Read Corporate
E: admin@greenvaleenergy.com.au E: nicholas@readcorporate.com.au
M: +61(0)419 929 046
About Greenvale Energy Limited
Greenvale is an ASX-listed exploration company with a portfolio of projects that will support a sustainable,
low-carbon future. The Company has greenfield, uranium exploration projects in the Northern Territory,
the high-grade Oasis Uranium project in Queensland and the Alpha Torbanite project in Queensland. The
Company believes the best way to create long-term shareholder value is by investing in exploration, to
make discoveries and grow its resource-base.
Forward Looking Statements
This announcement may contain certain forward-looking statements and projections. Such forward
looking statements/projections are estimates for discussion purposes only and should not be relied upon.
Forward looking statements/projections are inherently uncertain and may therefore differ materially from
results ultimately achieved. The Company does not make any representations and provides no warranties
concerning the accuracy of the projections and disclaims any obligation to update or revise any forward-
looking statements/projects based on new information, future events or otherwise except to the extent
required by applicable laws.While the information contained in this report has been prepared in good faith,
neither the Company nor any of its directors, officers, agents, employees or advisors give any
representation or warranty, express or implied, as to the fairness, accuracy, completeness or correctness
of the information, opinions and conclusions contained in this announcement.
Competent Persons Statement
The information in this announcement, as it relates to exploration results, interpretations and conclusions,
is based on information reviewed by Ms Asha Rao who is Technical Advisor & Competent Person to
Greenvale Energy Ltd and is a Member of both the Australasian Institute of Mining and Metallurgy (AusIMM,
#228188) and the Australian Institute of Geoscientists (AIG, #6925). Ms Rao is a Consultant to the
Company, and has sufficient experience that is relevant to the style of mineralisation and type of deposit
under consideration, and to the overseeing of activities being undertaken to qualify as a Competent Person
(as defined in the JORC 2012 edition of the “Australasian Code for Reporting of Mineral Resources and Ore
Reserves”. Ms Rao consents to the inclusion of this information in the form and context in which it appears.
Greenvale Energy Limited ASX Release
Page | 7
Appendix 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
totheminerals under investigation, such as down holegamma sondes,
or handheld XRF instruments, etc). These examples should not be
taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases, more explanation may be required, such
as where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed information.
No drilling is reported in this release.
Trench sampling involved the excavation of six trenches, with lengths varying
between 100 and 152m and a total 774.5m excavated. Each trench was 1.2 metres
wide, variable depths between 1.6 and 2.5 metres deep. Depths were dependent on
the weathering profile, and the thickness of cover sediments on fresh bedrock.
Each trench was radiometrically surveyed with a handheld scintillometer. Readings
were taken every 1 – 2 metres along the wall of the trench, with spacings closing in
to 0.5 metre if readings increased over 500 counts per second (cps).
Samples were collected along cut channels, with 2 - 4metre composites collected
over areas of background radiometric values (between 200 – 400 cps). In zones of
anomalous radiometric response (i.e., more than 500cps), sample intervals were
reduced to 1- and 0.5-metre widths.
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (e.g. core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
No drilling is reported in this release.
Drill sample
recovery
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain
of fine/coarse material.
No drilling is reported in this release.
Greenvale Energy Limited ASX Release
Page | 8
Criteria JORC Code explanation Commentary
Logging • Whether core and chip samples have been geologically and
geotechnicallylogged to a level of detail to support appropriate Mineral
Resource estimation, mining studies and metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
Geological logging was carried out by well-trained/experienced geologists and data
entered via a well-developed logging system designed to capture descriptive
geology, coded geology and quantifiable geology. All logs were checked for
consistency by the Principal Geologist. Data captured through Excel spread sheets.
Logging was qualitative in nature. A detailed log was described based on visual
observations. A comprehensive section profile was drawn from the wall of each
trench.
The entire length of each trench has been geologically logged.
Sub-sampling
techniques and
sample
preparation
• If core, whether cut or sawn and whether quarter, half or all core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the in-
situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material
being sampled.
Trench sampling has been undertaken with the use of a track-mounted excavator to
dig the trenches. The sampling procedure involves the use of a field hammer, PVC
split, plastic sheets and calico bags. The hammer is used to chip samples out of the
trench face, with material falling into the PVC split below. Once the sample has been
collected from the interval, it is bagged into a pre-marked calico bag.
In all sample cases, the standard 2kg -5kg sample is more than appropriate for the
grainsize of the rock-types and the sub-microscopic uranium minerals and sulphide
grainsize. The sample sizes are considered to be appropriate to represent the style
of the mineralisation, the thickness and consistency of the intersections.
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or
total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (e.g. standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (i.e. lack of bias) and precision have been established.
Preparation of rock chip and core samples involves crushing splitting and grinding at
Intertek/Genalysis lab Townsville. Higher grade uranium assays are analysed at
Intertek in Adelaide. The total amount of economic metals and pathfinder elements
tied up in sulphides and oxides such as U,Th,Cu, Pb, Zn, Ag, As, Mo, Bi, S is captured
by the 4-acid digest method ICP finish. Mass spectrometry (MS) ensures low level
detection and REE are also captured. This is regarded as a total digest method and
is checked against QA-QC procedures which also employ these total techniques.
Major elements which are present in silicates, such as K, Ca, Fe, Ti, Al, Mg are also
digested by the 4-acid digest Total method.
The techniques are entirely appropriate for a schistose, micaceous mineralised
structure such as Oasis, hosted in primarily a granitic / metamorphic terrane.
Greenvale Energy Limited ASX Release
Page | 9
Criteria JORC Code explanation Commentary
The economically important elements in these deposits are contained in both
resistate minerals and sulphides which are almost entirely liberated by 4 acid digest,
all gold is determined with a classic fire assay. Samples were assayed for gold using
the 50g fire assay method.
QAQC samples are monitored on a batch‐by‐batch basis, Terra Search has well
established sampling protocols including blanks (both coarse & pulped), certified
reference material (CRM standards) Terra Search quality control included
determinations on certifiedOREAS samplesinterspersedat regular intervalsthrough
the sample suite of the commercial laboratory batch.
Standards are checked on receipt of results. Laboratory assay results for these
quality control samples are within 5% of accepted values.
Verification of
sampling and
assaying
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
Sample intervals to be assigned a unique sample identification number prior to
sample despatch.
Radiometric results from the handheld scintillometer were first verified by Terra
Search Pty Ltd, independent geological consultants who conducted the trenching
program. Validation of the scintillometer results was conducted by the Greenvale
Energy Competent Person.
Data is collected by qualified geologists and experienced field technicians and
entered into Excel spreadsheets. Data is imported into database tables from the
Excel spreadsheets with validation checks set on different fields. Data is then
checked thoroughly by the Principal Geologist for errors. Accuracy of trench
sampling data is then validated when imported into MapInfo.
Location data are then collated into a single Excel spreadsheet.
Data is stored on servers in The Company’s office (GRV) and also with Terra Search
Consultants. There are regular backups and archival copies of the database made.
Data is validated by long-standing procedures within Excel Spreadsheets and
Explorer 3 data base and spatially validated within MapInfo GIS.
Greenvale Energy personnel undertake internal validation using software packages
QGIS and Micromine Origin.
Location of data
points
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations used
in Mineral Resource estimation.
Trench locations are reported in MGA Zone 55, using a handheld GPS. Expected
location accuracy of +/- 10m
Greenvale Energy Limited ASX Release
Page | 10
Criteria JORC Code explanation Commentary
• Specification of the grid system used.
• Quality and adequacy of topographic control.
Data spacing
and distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
ResourceandOre Reserve estimationprocedure(s)and classifications
applied.
• Whether sample compositing has been applied.
At the Oasis prospect, historical trenching programs have been conducted by
Australian Anglo American in 1973, Esso Australia in 1978, Glengarry in 2005-2006.
Australian Anglo American completed 3 trenches, variably spaced between 40 and
45 metres apart. The trenches completed by Esso Australia comprised a total of 8
trenches, spaced approximately 50 metres apart. Both generations of exploration
trenching were positioned on a NNE-SSW orientation. Being historical in nature, no
detailed information is available on sample spacing for the Australian Anglo-
American trenches. Esso Australia collected samples on a 1-metre spacing.
Orientation of
data in relation
to geological
structure
• Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
• If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
Geological control of the Oasis structure containing uranium mineralisation is very
well established from previous historical work dating back to the 1970’s with Esso,
followed up in 2008 with modern exploration by Glengarry and Mega Uranium. The
uraniferous Oasis structure is broadly north – south striking and dipping 60 to 70
degrees to the west. This structural attitude has been confirmed by the 2025
Greenvale trenching, which also confirms observations made during the 2025
drilling.
The orientation of the 2025 trenches is entirely appropriate for this structure, with
the trenches orientated east-west to cover additional, possible, NE-SW, NW-SE and
NNE-SSW trending structural features, observed from the recent, close-spaced
ground magnetics survey.
Sample security • The measures taken to ensure sample security. Chain of custody was managed by Terra Search Pty Ltd. Trench samples have been
transported in sealed bags, strapped to pallets and dispatched by Terra Search to
Intertek/Genalysis laboratory Townsville lab.
Audits or
reviews
• The results of any audits or reviews of sampling techniques and data. No audits have been conducted.
Greenvale Energy Limited ASX Release
Page | 11
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
• The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
EPM27565was grantedto RemlainPty Ltdin Feb2021,in Jan2025the mineral permit
was acquired by Greenvale Utilities a 100% subsidiary of Greenvale Energy Ltd. The
current 5-year term expires on 23rd
Feb 2027.
The Oasis deposit and associated regional uranium anomalism are contained within
EPM 27565 which covers 53 subblocks over an area of 90 km2 and located 250 km
west of Townsville and 50 km west of Greenvale in FNQ. The project area is located
entirely within the Lynd Station pastoral land.
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by other parties. Previous exploration summary reported in ASX release dated 13th Jan 2025.
Geology • Deposit type, geological setting and style of mineralisation. Structurally controlled uranium mineralization hosted in complexly deformed
granite dominated intrusives and high grade metamorphics.
Drill hole
Information
• A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from the
understanding of the report, the Competent Person should clearly
explain why this is the case.
No drilling is reported in this release.
Greenvale Energy Limited ASX Release
Page | 12
Criteria JORC Code explanation Commentary
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high-grade
results and longer lengths of low-grade results, the procedure used for
such aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent values
should be clearly stated.
No drilling or assays are reported in this release.
Samples have been collected on variable intervals and will be reported accordingly
on receipt of the assays.
No metal equivalents are used in current or previous reporting at Oasis.
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important in the reporting of
Exploration Results.
• If the geometry of the mineralisation with respect to the drill hole angle
is known, its nature should be reported.
• If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (e.g. ‘down hole length, true
width not known’).
Previously reported historical drill intercepts are from holes generally dipping -60 – -
70 degrees east which is normal to a mineralised structure that is dipping -70
degrees west towards the drillholes. With this geometry, the downhole widths are
marginally greater than the true thickness of the mineralized structures. The exact
geometric relations and true widths are still to be established.
The structural relationships determined by the current drilling have produced an
extensive dataset derived from oriented core. Observations to date confirm the
geometry discussed above and will be the subject of future ASX Releases once all
drilling data has been received.
These structural data have been used to inform the orientations of the trenches prior
to excavation.
Diagrams • Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include but not be limited to a plan view of drill
hole collar locations and appropriate sectional views.
All appropriate diagrams are contained in the report.
Balanced
reporting
• Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
Exploration Results.
This release describes all relevant information available to the Company.
Greenvale Energy Limited ASX Release
Page | 13
Criteria JORC Code explanation Commentary
Other
substantive
exploration data
• Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical
survey results; geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
All available exploration data derived from Company work programs has been
provided.
Further work • The nature and scale of planned further work (e.g. tests for lateral
extensions or depth extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas,
provided this information is not commercially sensitive.
The trench sampling program is now completed, with a total of 6 trenches excavated
and now fully re
Share your feedback